Topics 06 - Road Map To ERP Implementation
Topics 06 - Road Map To ERP Implementation
1
5/11/2022
2
5/11/2022
3
5/11/2022
Management Processes
Control and reporting
confirm the scope and approach of the project,
manage change, and
control risks
guides toward management of project plans and reports project status.
Work management
define, monitor, and direct all work performed on the project.
maintain a financial view of the project.
Resource management
Achieve the right level of staffing and skills on the project,
implementing an infrastructure to support the project.
Quality management
Implementing quality measures to ensure that the project meets the client’s purpose and
expectations throughout the project life cycle.
Configuration management
Store, organize track, and control all items produced by and delivered to the project.
provides a single location from which all project deliverables are released.
4
5/11/2022
System
Interface and
Training Integration
Conversion
Testing
User
Production Go
Acceptance Rollout
Live
Test
5
5/11/2022
6
5/11/2022
Activities
2. Define
1. Prepare Application 3. CRP and Unit
Instance Strategy Setups and Install Testing
the CRP Instance
Customizations
Enterprise resource planning (ERP) application provides the users, the flexibility to
customize the standard application functionality to suit the specific business needs,
which is not supported by the standard application product
Developing additional reports as per business requirement of the organization also
falls under the scope of customization.
During any implementation of ERP application,
a general observation is that customers request for a sizable degree of customization.
Before doing any customization, it is the responsibility of the application consultant to
ensure the following for Process Level Customizations
Whether standard applications do not provide that functionality
Whether it is possible for customers to fit into standard functionality if that is a better practice
Whether customization is coming as future release in ERP
7
5/11/2022
Analyze
Gap Analysis Design Development
Dependency
8
5/11/2022
Identify Prepare
Interface Interface
Interfaces Interface-
Designing Development
and Tools Building Plan
User Interface
Acceptance Integration
Testing Testing
Activities related to Date Migration
Identify Define
and and Build the Flipping
Conduct a
Freeze Design Migration the Audit
Live Test
Source the Solution Switch
Data Files Migration
9
5/11/2022
Training
The skill transfer is an essential step in an enterprise resource planning (ERP)
implementation project.
The training is conducted at two levels for the client members in the project.
In the first level, the key users/process owners are required to be trained on the
functionality and major features of the software package. This training, if given
before the business process analysis, helps to improve the communication between
the consultants and the key users/process owners during the analysis phase.
The next level of training is required for the end users where more stress is given
on the transactions, reports/interface/other programs, user security, and
system administration activities (applicable for the system administrator only).
This training is required before the commencement of acceptance testing.
Any other training may be arranged also, if required.
Successful projects require that end users be properly trained on the
completed system. This step provides the requisite user procedures and
training program to support end-user transition to the new system.
10
5/11/2022
Develop
Develop
Training
Assess User Training/User
Curriculum and Deliver Training
Requirements Procedures
End User
Strategy
Documentation
11
5/11/2022
Prepare UAT
UAT Strategy Conduct UAT
Environment
Production Go Live
The objective of production migration is to migrate the organization, systems, and
people to the new enterprise system.
The production environment is prepared in this phase.
The database instances are created, applications are set up, and initial data (master
data, open transaction, and required historical transactions) are migrated from the
legacy systems to the new enterprise resource planning (ERP) applications.
The system is audited and performance check is carried out.
The system is assessed again after the Go Live and necessary measures are taken
12
5/11/2022
Prepare
Define Transition Develop Set Up
Production
Strategy Contingency Plan Applications
Environment
Implement
Integrate Custom Verify Production Production
Data Migration
Components Readiness Support
Infrastructure
Rollout
Rollout is required if the ERP project is implemented in multiple sites. First
the ERP project is implemented at one pilot site.
After stabilization of the system at the pilot site, the system is implemented
at other sites using the procedures and configuration data, and customization
of the pilot site is carried out as far as possible.
Different project teams are required for each rollout site.
The major stress of the rollout project team is to reuse the implementation
process, set up data, technical and operational architecture, customized
components, interface, and data migration programs as much as possible.
Too much deviation from the pilot site implementation results in the delay in
commissioning of the rollout sites and eventually increases the stress on the
project budget
13
5/11/2022
User Integrate
Begin Data
Acceptance Custom
Production Migration
Testing Components
Maintain
System
14