0% found this document useful (0 votes)
43 views1 page

Cover Sheet

Uploaded by

Abd Alrhman Amro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Cover Sheet

Uploaded by

Abd Alrhman Amro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

USAID West Bank & Gaza Architecture

and Engineering Services Project Implementing Partner

SUBMITTAL REVIEW TRANSMITTAL FORM


Instructions: Contractor shall complete all shaded fields as appropriate except area in green reserved for Engineer.

Submittal Date: USAID Contract No.


Contract No. Task Order
May 12, 2024 72029423D00002
Electronic Delivery Method: EDBMS EMAIL 72029423D00002 72029423F00003

Delivery Method: (Hard Copy) BY HAND Reference No.: CB01ABCXX14210MAT0151XXXR01

To: AECOM Technical Services (ATS) From: Arab Brothers Company (ABC)

Attention: Construction Manager Items Attached:


Description: Elevators- source and TO/Project. :YDRC /
Specification No. 14210 Paragraph 1-4
materials 72029423F00003
Supplier/Subcontractor Arab Brothers Company Drawing No.: Rev.
Subject Submittal has been reviewed and review action is as shown below:
Item No. of [For Engineer’s use]
Contractor’s Item Description QTY
No. Pages Comments Action Reviewer

1 Elevators - source and materials 62 1S/ 2H

A = No Exceptions Noted, B = Exceptions Noted, C = Returned For Correction, D = Not Acceptable E= Record Copy

Contractor’s Verification: complete either (a) or (b) following


Notice from the Owner: Corrections or comments made
We have verified that the materials or equipment relative to submittals during this review do not relieve the
(a) contained in this submittal meet all the requirements contractor from compliance with the requirements of the
specified or shown (no exceptions) drawings and specifications. This check is only for review of
We have verified that the materials or equipment general conformance with the design concept of the project
contained in this submittal meet all the requirements and general compliance with the information given in the
specific or shown, except for the following deviations contract documents. The contractor is responsible for
(b)
(List Deviations below or attach separate sheet). confirming and correlating all qualifies and dimensions;
selecting fabrication processes and techniques of
Deviations construction/ coordinating his work with that of other trades,
Submittal Date:May 12, and performing his work in a safe and satisfactory manner.
BY:ABC
2024

Contractor’s Representative

Engineer’s Remarks: See comments below, see attached sheet, see red-marks on submittal or indicate here: None .

By: Review Date:

AECOM Representative

CFM01 - Submittal Review Form