SCHEDULE OF RATES
(CIVIL WORKS)
2023-24
IRRIGATION DEPARTMENT
æÃù¿ü=ò ¿Âõö±á
Compiling & Editing : Dipika Biswas, E.E. & Director
Information Technology & Data Management
: Gyandeep Medhi, A.E.
This Schedule of Rates for the year 2023-24 for Irrigation Department has been
prepared considering the general specifications in force in the State Departments and
on the basis of current practices in the State taking into consideration the prevailing
market price of various consumable items.
The Schedule of Rates under Irrigation Department, Assam was last revised in
the year 2019-20. At present revision is done as a department must have an updated
Schedule of Rates revised on a regular basis considering the cost of all the
commodities rising at frequent intervals.
The rates in the schedule will apply to all possible categories of works that may
arise in the construction and maintenance of irrigation works undertaken by the
Irrigation Department throughout the State of Assam.
The detailed Analysis of Rates covered by this Schedule of Rates have been
carried out on the basis of All India Standard Schedule of Rates & Indian Standard
Recommendation for labour rates notified by the Labour Commissioner, Assam vide
Notification No.ACL/41/2004/3905-908, Dated.27th April, 2023, considering the
weekly paid holiday.
This Schedule of Rates for the year 2023-24 shall be effective for all divisions for
executing works related to irrigation throughout Assam under this Department from
the date of publication.
The basic rates of materials used in the Analysis of Rates are without GST as
collected from market and GST @ 18% for Composite Works as defined in Clause
(119) of Section 2 of the Central Goods and Services Tax Act, 2017 vide OM
No.158/SE(TAS)/GST/2022/331-H, Dated.10.08.2022 is considered in the Analysis of
Rates as directed by the Finance Department are incorporated in the rear.
A-1
Although due care has been taken to make the Schedule of Rates more realistic
and as correct as possible, however, some errors cannot be ruled out and might have
crept in inadvertently. In case, any such errors or omissions are apparent, these may be
brought to the notice of the Head of the Department for necessary corrections.
Suggestions and feedback for further improvements are always welcome.
Lastly we offer our thanks to all the following members of Schedule of Rates
Preparation Team for their sincere efforts in timely completion of the works:
A-2
BASIC NOTES
BASIC NOTES
The Schedule of Rates is prepared for all Divisions of Assam under the
jurisdiction of Chief Engineer, Irrigation Department, Assam, Guwahati-3. All rates of
items for all kind of commonly executed works under Irrigation Department, Assam
are incorporated in this Schedule of Rates.
The basic approach for the preparation of this Schedule of Rates is indicated as under:
2. Unless otherwise specified distinctly, materials of the best and durable variety
shall be used in all works covered by this Schedule of rates. The concerned
Executive Engineer should approve samples of the materials proposed to be
used in the works and if desired test reports from the producers shall have to be
furnished to the Executive Engineer. Further required tests in approved
laboratories shall have to be conducted for the samples at contractor’s cost.
4. The rates in the schedule are intended to apply to every description of work that
may be required in construction and maintenance of irrigation structures and
other related works.
5. Unless otherwise specified, the rate shall be deemed to be on finished net sizes,
complete fixing, inclusive of all necessary materials, labour, tools and plants,
transport and shall also cover the cost of all contingent items.
6. The rates in this schedule includes all costs, so no extra benefit shall be allowed
for meeting up the various requirements as laid down in specification,
drawings, special conditions, preamble to items, etc., and any or all items
unless specially provided to the contrary.
7. Working Conditions:
(i) Rates have been analyzed for average working condition prevailing in
the State.
(ii) The places of work under Irrigation Department are usually village and
remote areas, therefore average achievable outputs of the machine and
labour have been considered taking into account the job and
management factors.
B-1
(iii) In some specified items of work the output of machines and labour
reduces substantially, therefore these have been taken care of.
8. Basic Inputs:
(i) The rates calculated in this schedule are based on requirements of basic
inputs of materials, labour and machineries for various items.
(ii) The labour wages are considered as per rates notified by the Labour
Commissioner, Assam vide Notification No. ACL/41/2004/3905-908,
Dated.27th April, 2023, considering the weekly paid holiday.
(iii) The rates of materials are considered as per prevailing market rates.
(iv) In case of quarry distance of the work site exceeds 25 KM for gravels,
broken stones, boulders and 40 KM for sand, then the rates should be
worked out separately as in the Schedule of Rates.
(v) The hire charge of machines considered as per market rate includes
ownership charge, cost of repairs and maintenance, etc.
(vi) Cost of fuel, lubricants, operating crew, etc., are considered separately
in the analysis of rates unless specifically mentioned.
11. GST @ 18% for Composite Works as defined in Clause (119) of Section 2 of
the Central Goods and Services Tax Act, 2017 vide OM
No.158/SE(TAS)/GST/2022/331-H, Dated.10.08.2022 is considered.
12. Compensation for the earth obtained from Govt. land is considered @
Rs.120.00 per CuM in the analysis of rates. However, where the earth has to be
borrowed from private land, the contractor will make his own arrangement
wherever required and produce the earth compensation receipt.
13. The serviceable dismantled materials should be taken into account and handed
over to departmental store.
14. The construction materials which will not be issued from the departmental
stores of Irrigation Department, the contractors shall have to produce those
materials of specified brand and quality from authorized dealers.
15. In preparation of estimates where the estimated cost exceeds Rs. 10.00 Lakh, 1
% of the total cost should be considered as construction workers welfare cess.
The rate of construction workers’ welfare cess may vary as per Govt.
notification.
B-2
16. An additional amount of 4% has to be considered on overall items at the time
of preparation of estimates for Rates of Royalty on Forest Produces as per
latest Gazette Notification No.PEM.130/2021/40, Dated.07.10.2021. As such
the Rates of Royalty on Forest Produces have not been considered in the
Analysis of Rates of Items.
B-3
INDEX
INDEX
1 COLLECTION
1.1 SAND
1.2 BOULDER
1-3
1.3 HARD RIVER GRAVEL
1.4 PEA GRAVEL
1.5 HARD BROKEN STONE
2 CARRIAGE 4
3 JUNGLE CLEARANCE 5 - 6
4 SURVEYING 7-8
5 TURFING 9
6 EARTHWORK
A. EARTHWORK IN EXCAVATION
10 - 20
B. EARTHWORK IN HEAD WORK
C. EARTHWORK IN FILLING
7 DEWATERING
7.1 DEWATERING IN EARTH WORK 21
7.2 DEWATERING IN CC WORK
8 SCAFFOLDING 22
9 SHUTTERING 23 - 24
10 CC WORK
10.1 IN PROPORTION 1:1½:3 (M 20)
10.2 IN PROPORTION 1:2:4 (M 15) 25 - 31
10.3 IN PROPORTION 1:3:6 (M 10)
10.4 IN PROPORTION 1:4:8 (M 5)
11 PCC WORK WITH PLUM 32 - 33
12 RCC WORK 34 - 36
13 BRICK WORK 37
14 PLASTERING 38
15 BRIDGE 39 - 44
16 CULVERT 45
17 RCC WATER TROUGH 46
18 CANAL WORK 47
19 PVC DISTRIBUTION SYSTEM 48 - 51
20 SHEET PILING 52
21 PROTECTION WORK 53 - 57
22 DISMANTLING 58 - 59
23 MISCELLANEOUS 60 - 62
24 CHART OF REQUIREMENT OF MATERIALS 63
25 HIRE CHARGES, DAILY WAGES OF LABOUR, RATES OF MISCELLANEOUS ITEMS 64 - 66
26 RATES OF HUME PIPES, RATES OF PVC ITEMS, BASIC RATES OF MATERIALS 67 - 73
1. COLLECTION
1. COLLECTION
Sl No Name of Item Unit Rate
1.1 SAND
Collection of sand at quarry free from dust & other
foreign materials including screening etc, complete as
directed.
1.2 BOULDER
(A) Collection of one man size 25 cm to 30 cm hard river CuM Rs. 1024.75
boulder including stacking in measurable stacks of not ( Rupees One Thousand
more than 1.00 M height at quarry site and complete as TwentyFour(Paise
SeventyFive ) Only
directed.
1
Sl No Name of Item Unit Rate
(B) Collection of hard river gravel, chips of size 13 mm to 25 CuM Rs. 1278.59
mm free from dust and dirt from quarry including ( Rupees One Thousand
loading and unloading etc, complete as directed. Two Hundred
SeventyEight(Paise
FiftyNine ) Only
(C) Collection of hard river gravel of size 5 cm to 15 cm free CuM Rs. 1291.57
from dust and dirt from quarry including loading and ( Rupees One Thousand
unloading etc, complete as directed. Two Hundred
NinetyOne(Paise
FiftySeven ) Only
2
Sl No Name of Item Unit Rate
1.5 HARD BROKEN STONE
(A)(i) Collection of hard broken stone of size 6 mm to 20 mm CuM Rs. 3116.80
from river boulder free from dust and dirt and foreign ( Rupees Three Thousand
materials including stacking at quarry site, complete as One Hundred
Sixteen(Paise Eighty ) Only
directed.
1.6 Collection of sand gravel (40% sand and 60% gravel of CuM Rs. 898.91
size 25 mm to 60 mm) free from dust and dirt including ( Rupees Eight Hundred
stacking in measurable stacks at quarry site and NinetyEight(Paise
NinetyOne ) Only
complete as directed.
********
3
2. CARRIAGE
2. CARRIAGE
Sl No Name of Item Unit Rate
2.1 Carriage of boulders, gravels, metal screening, stacking
in measurable stacks at site, complete as directed.
********
4
3. jungle clearance
3. JUNGLE CLEARANCE
Sl No Name of Item Unit Rate
3.1 Cutting jungles and trees upto 50 cm girth including
uprooting roots and stumps and removing them from
site of work etc, complete as directed.
5
Sl No Name of Item Unit Rate
(iii) 150 cm to 180 cm girth No. Rs. 1592.84
( Rupees One Thousand
Five Hundred
NinetyTwo(Paise
EightyFour ) Only
(F) Cutting and clearing bushes consisting of plants and all SqM Rs. 47.22
sorts of bamboos including uprooting and removing as ( Rupees
necessary and filling up the holes with earth including FourtySeven(Paise
TwentyTwo ) Only
dressing, ramming, complete as directed.
********
6
4. SURVEYING
4. SURVEYING
Sl No Name of Item Unit Rate
4.1 Carrying out compass survey including chaining, KM Rs. 4019.85
marking, pegging, carrying instruments and clearing .
( Rupees Four Thousand
jungles and other obstructions, complete as directed. Nineteen(Paise EightyFive
) Only
4.2 Carrying out compass survey including chaining, SqKM Rs. 33509.31
marking, pegging, carrying instruments and clearing .
( Rupees ThirtyThree
jungles and other obstructions, complete as directed. Thousand Five Hundred
Nine(Paise ThirtyOne )
Only
4.3 Carrying out levelling survey taking long section and KM Rs. 34878.73
cross section at 30 M interval of proposed canal system, ( Rupees ThirtyFour
afflux bund, approach road and along the stream Thousand Eight Hundred
SeventyEight(Paise
including chaining, pegging, holding staff, carrying out
SeventyThree ) Only
instrument, clearing jungle etc, complete as directed.
4.4 Fly levelling for checking the level after completion of KM Rs. 3332.01
survey along the existing canal and connection of BM ( Rupees Three Thousand
pillars. Three Hundred
ThirtyTwo(Paise One )
Only
7
Sl No Name of Item Unit Rate
4.6 Supplying of wooden pegs of size 0.60 M x 0.045 M x No. Rs. 104.93
0.045 M made of 2nd class local wood. ( Rupees One Hundred
Four(Paise NinetyThree )
Only
4.7 Carrying out block contour survey of the commanded Hectare Rs. 2030.97
area covering stream, dong, channel, road etc. and the ( Rupees Two Thousand
whole area considering square block system and spot Thirty(Paise NinetySeven )
Only
system and spot levels are to be within 30 M x 30 M for
preparation of contour including clearing light jungles,
chaining, pegging holding staff, umbrella and compass
lining etc. where required, complete as directed.
4.8 Carrying out levelling survey, taking long section KM Rs. 32836.10
including cross section at 30 M interval of proposed ( Rupees ThirtyTwo
canal system, afflux bund, guide bund, approach road Thousand Eight Hundred
ThirtySix(Paise Ten ) Only
and along the stream including chaining, pegging,
holding staff, carrying out instrument, clearing jungle
etc, complete as directed.
4.9 Carrying out levelling survey for taking long section of KM Rs. 3057.38
field channel at an interval not more than 30 M or part ( Rupees Three Thousand
thereof including ranging, chaining, holding staff, driving FiftySeven(Paise
ThirtyEight ) Only
pegs, clearing light jungles and carrying survey materials
etc, complete as directed.
4.11 Construction of R.C.C BM Pillar of size 0.15 M X 0.10 M No. Rs. 4706.34
in proportion 1:2:4 with required reinforcement ( Rupees Four Thousand
including E/W in excavation, brick soling, centering, Seven Hundred Six(Paise
ThirtyFour ) Only
shuttering and propping, etc, complete as directed.
4.12 Final Survey before and after execution across existing KM Rs. 17748.33
damaged canal system for checking cross section and ( Rupees Seventeen
long section at the interval of 25 M including supplying Thousand Seven Hundred
FourtyEight(Paise
of labour and other materials such as jati bamboo
ThirtyThree ) Only
kamies, coir rope, paint and local wood chainage peg of
size 1½" x 1½" x 3' etc, complete as directed.
********
8
5. TURFING
5. TURFING
Sl No Name of Item Unit Rate
5.1 Turfing with grass sode of largest possible rectangular SqM Rs. 28.15
and minimum size 30 cm X 30 cm X 10 cm placing ( Rupees
closely after dressing hard the surface and fixing sode TwentyEight(Paise Fifteen
) Only
with split bamboo pegs, watering till the grass grows
with lead up to 90 M and lift of 1.50 M, complete as
directed.
********
9
6. EARTHWORK
6. EARTHWORK
Sl No Name of Item Unit Rate
A. EARTHWORK IN EXCAVATION
6.1 Earthwork in excavation in irrigation canal to the design
section and grade by depositing the spoils in the form of
embankment in 15 cm layers on both banks as necessary
including clearing light jungle, removing trees upto 15 cm
dia and uprooting roots and stumps etc. from the seat of
the embankment and canal free from all vegetation
including breaking clods not more than 10 mm cube,
ramming, dressing and roughening the seat of the
embankment with a lead upto 30 M and lift upto 1.50 M,
complete as directed.
(ii) Soil with gravel or morum upto 30 cm size CuM Rs. 510.94
( Rupees Five Hundred
Ten(Paise NinetyFour )
Only
(iii) Soil with gravel or boulder above 30 cm size CuM Rs. 1745.77
( Rupees One Thousand
Seven Hundred
FourtyFive(Paise
SeventySeven ) Only
(B) Extra lift for every 1.5 M or part thereof beyond initial lift CuM Rs. 23.13
of 1.5 M ( Rupees
TwentyThree(Paise
Thirteen ) Only
10
Sl No Name of Item Unit Rate
6.3 Earthwork in excavation in diversion / feeder channel to
the design section and grade by depositing the spoils in the
form of an embankment on either side to the design
section and grade in layers not exceeding 15 cm thick
including clearing light jungle and trees upto 15 cm dia and
uprooting roots and stumps etc. from the seat of the
embankment and canal and free from all vegetation
including breaking clods not more than 10 mm cube,
ramming, dressing, bailing out stagnant rain water
necessary complete as directed with a lead upto 30 M and
lift upto 1.50 M.
(ii) Soil mixed with gravel or boulders upto 30 cm size CuM Rs. 514.93
( Rupees Five Hundred
Fourteen(Paise
NinetyThree ) Only
(iii) Soil mixed with gravel and boulders above 30 cm size CuM Rs. 3001.59
( Rupees Three Thousand
One(Paise FiftyNine )
Only
(A) In all types of soil (except soil mixed with gravel and boulder)
(i) For normal lead of 30 M and lift of 1.50 M CuM Rs. 355.14
( Rupees Three Hundred
FiftyFive(Paise Fourteen )
Only
11
Sl No Name of Item Unit Rate
(ii) For lead upto 60 M and lift of 3 M CuM Rs. 401.39
( Rupees Four Hundred
One(Paise ThirtyNine )
Only
6.5 Earthwork in excavation for diversion with channelisation CuM Rs. 1218.28
in soil mixed with sand, gravel and different sizes of
24.15 boulders upto mansize by JCB / front loader excavator and ( Rupees One Thousand
Two Hundred
manual labour, removing the same to a safe distance upto Eighteen(Paise
1 KM by means of vehicle and depositing the spoils in the TwentyEight ) Only
form of spoil embankment / bank as required at site
including dressing grading and cutting the sides slopes etc.
complete as directed by the department.
12
Sl No Name of Item Unit Rate
6.7 Earthwork in excavation trenches of walls, retaining walls,
footing of columns, steps and septic tank including refilling
(return filling) the quantity as necessary after completion
of works, breaking clods in return filling, dressing,
ramming, watering etc. and removal of surplus earth with
all lead and lift upto 2 metre as directed and specified in
following classification of soils, including bailing out of
water where necessary upto depth below the existing
ground level as mentioned in the approved drawing and
complete as directed and specified.
(C) Extra for lift beyond 2.00 M upto 3.00 M for all CuM Rs. 192.00
classification of soils. ( Rupees One Hundred
NinetyTwo ) Only
6.8 Earthwork in cutting in river bank etc. to the design section CuM Rs. 595.25
and grade and removing the spoils to a safe distance ( Rupees Five Hundred
including cutting, uprooting and removing trees upto 15 NinetyFive(Paise
cm dia, uprooting and removing roots and stumps etc, TwentyFive ) Only
including excavating the earth boulder sausages of 1.00 M
dia, 50 cm under river bed shape, size and grade etc. with
all lead and lift, complete as directed.
13
Sl No Name of Item Unit Rate
6.10 Earthwork in excavation of foundation trenches including CuM Rs. 378.58
filling up sides of trenches and removal of spoils after ( Rupees Three Hundred
completion of foundation, dressing, ramming, shoring etc. SeventyEight(Paise
FiftyEight ) Only
complete including bailing out water, where necessary, in
ordinary soil.
6.11 Carriage of excavated earth by dumpers with a lead upto 2 CuM Rs. 500.98
KM unloading to a safe place as directed including ( Rupees Five Hundred
spreading, dressing etc, complete as directed. (Paise NinetyEight ) Only
6.12 Earthwork in excavation of deposited silt, sand and river CuM Rs. 454.27
debris from the seat of Guide Bunds /Afflux Bunds,etc. ( Rupees Four Hundred
including clearing light jungle, removing tree upto 15 cm FiftyFour(Paise
dia, and uprooting roots and stumps, etc, from the seat of TwentySeven ) Only
Guide Bunds / Afflux Bunds, etc. including dressing,
carriage of excavated earth and depositing the same in
stacks at a distance not less than 80 M from the axis of the
Guide Bunds / Afflux Bunds, etc. including bailing out of
water where necessary upto depth below the existing
ground level as mentioned in the approved drawing and
complete as directed and specified.
6.13 Earthwork in excavation for removal of sediment from bed CuM Rs. 286.79
24.2 of irrigation canal / river by head load to a safe distance ( Rupees Two Hundred
including bailing out water, dressing the bed as directed EightySix(Paise
for normal lead of 30 M and lift of 1.5 M. (Ordinary soil). SeventyNine ) Only
14
Sl No Name of Item Unit Rate
6.15 Cost of dewatering involved during earthwork in CuM Rs. 326.07
excavation of foundation trenches of canal structures (by ( Rupees Three Hundred
24.6
pump) in soil mixed with silt and sand etc. Dewatering by TwentySix(Paise Seven )
using 1 no. 10 HP and 1 no. 5 HP water pump. Only
6.17 Earthwork for removing the cofferdam including depositing CuM Rs. 539.46
the earth near the canal embankment and slopes where ( Rupees Five Hundred
24.8
necessary including removing the pitched boulders and ThirtyNine(Paise
stacking at safe distance in measurable stacks including FourtySix ) Only
ramming, dressing the earth etc. complete as directed.
6.18 Earthwork in excavation of deposited silt mixed with slushy CuM Rs. 481.48
earth, sand, gravel etc. from the canal bed including
24.10 resectioning, grading the canal bed, bailing out water ( Rupees Four Hundred
EightyOne(Paise
where necessary and carrying and depositing the suitable FourtyEight ) Only
earth on the top of both marginal embankment / side
slopes in layers of 15 cm thick and breaking clods upto 15
mm cube by wooden rammer properly as directed lead
upto 30 M and lift 1.5 M.
6.19(A) Earthwork in excavation of deposited silt mixed with slushy CuM Rs. 581.41
earth, sand, gravel etc. from the canal bed including
24.11(A) resectioning, grading the canal bed, bailing out water ( Rupees Five Hundred
EightyOne(Paise
where necessary and carrying and depositing the suitable FourtyOne ) Only
earth on the top of both marginal embankment / side
slopes in layers of 15 cm thick and breaking clods upto 15
mm cube by wooden rammer properly as directed
inclusive of constructing bamboo staircases with lead upto
60 M and lift of 1.5 M to 4 M.
(B) Extra lift upto 9.0 M beyond the initial lift of 4.0 M CuM Rs. 284.71
( Rupees Two Hundred
EightyFour(Paise
SeventyOne ) Only
15
Sl No Name of Item Unit Rate
6.20 Earthwork in excavation of deposited silt mixed with CuM Rs. 340.74
muddy earth, sand, etc. from the canal bed including ( Rupees Three Hundred
24.12
resectioning, grading the canal bed, bailing out water Fourty(Paise SeventyFour
where necessary and carrying and depositing the suitable ) Only
spoil on the top of both marginal embankment / side
slopes in layers of 15 cm thick and breaking clods upto 15
mm cube by wooden rammer properly as directed lead
upto 30 M and lift 1.5 M.
16
Sl No Name of Item Unit Rate
6.24 Earthwork in excavation of deposited silt mixed with sand, CuM Rs. 1113.83
pebbles, debrises, morums, slushy earth, gravel from ( Rupees One Thousand
24.4
irrigation canal including resectioning, reshaping and One Hundred
grading the canal bed and removing the excavated spoils Thirteen(Paise
by head load to the canal bank for lead upto 60 M and all EightyThree ) Only
lift for further removal by truck carriage including bamboo
staircases complete as directed.
EARTHWORK IN HEADWORK
6.25 Earthwork in excavation in foundation of head work in all
types of soil as per design and drawing including dressing
the foundation, shoring etc. removing the surplus spoils by
head load to safe distance from the working place and
depositing the required spoils in uniform layers, dressing,
watering, breaking clods to not more than 10 mm cube
with compensation, complete as directed at site. (Including
bailing out stagnant rain water where necessary).
(A) In all types of soil (except soil mixed with gravel and boulder)
(i) For normal lead of 30 M and lift of 1.50 M CuM Rs. 363.27
( Rupees Three Hundred
SixtyThree(Paise
TwentySeven ) Only
(i) For normal lead of 30 M and lift of 1.5 M CuM Rs. 574.89
( Rupees Five Hundred
SeventyFour(Paise
EightyNine ) Only
17
Sl No Name of Item Unit Rate
( C) In soil mixed with gravel and boulder above 30 cm size
(i) For lead of 30 M and lift of 1.5 M CuM Rs. 765.40
( Rupees Seven Hundred
SixtyFive(Paise Fourty )
Only
B. EARTHWORK IN FILLING
6.26 Earthwork in filling in Marginal bund / Guide bank / Afflux
bund / Canal embankment etc. to the design section and
grade by obtaining earth from outside borrow pits and
filling in uniform layers not exceeding 15 cm thick including
clearing light jungle, removing trees upto 15 cm dia and
uprooting roots and stumps from the seat of embankment
and borrow pit area, breaking clods not more than 10 mm
cube, ramming, watering, dressing and roughening the
seat of embankment, profiling etc. Paying compensation of
earth borrowed from private or forest land if any, lead
upto 30 M and lift upto 1.5 M, complete as directed.
(i) Soil with gravel or morum upto 50 mm size CuM Rs. 563.75
( Rupees Five Hundred
SixtyThree(Paise
SeventyFive ) Only
(ii) Soil with gravel and boulder upto 30 cm size CuM Rs. 670.54
( Rupees Six Hundred
Seventy(Paise FiftyFour )
Only
18
Sl No Name of Item Unit Rate
( C) EXTRA LEAD AND LIFT
(i) Extra lead (for earthwork) for every 30 M or part thereof CuM Rs. 22.41
beyond the initial lead of 30 M. ( Rupees
TwentyTwo(Paise
FourtyOne ) Only
(ii) Extra lift (for earthwork) for every 1.5 M or part thereof CuM Rs. 22.41
beyond the initial lift of 1.5 M. ( Rupees
TwentyTwo(Paise
FourtyOne ) Only
6.27 Earthwork in back filling of structures, obtained from CuM Rs. 560.55
outside borrow pits filling in 15 cm layers, ramming, ( Rupees Five Hundred
dressing, watering, including paying compensation of land Sixty(Paise FiftyFive )
Only
if any (with lead up to 30 M and lift 1.5 M).
6.28 River sand filling in plinth, canal bed, canal slopes, bases of CuM Rs. 2025.12
structure, etc in layers not more than 150 mm thick ( Rupees Two Thousand
including necessary carriage, watering etc, complete as TwentyFive(Paise Twelve
) Only
directed as specified.
6.29 Earthwork in filling in canal embankment, approach road, CuM Rs. 463.28
24.1 afflux bund, guide bund etc. to the designed section and ( Rupees Four Hundred
grade by obtaining earth from outside borrow pits and SixtyThree(Paise
TwentyEight ) Only
filling in uniform layers not exceeding 15 cm thick
including clearing light jungles, removing trees upto 15 cm
dia. and uprooting roots and stumps from the seat of
embankment and borrow pits area, including breaking
clods to not more then 10 mm cube ramming, dressing,
watering and roughening the seat of embankment,
profiling etc. paying compensation of earth borrowed from
private land if any, lead upto 30 M and lift upto 1.5 M
complete as directed. (By head lead in sandy, clayey or
loamy soil).
(i) Extra lead for every 30 M or part thereof beyond the initial CuM Rs. 23.45
lead of 30 M.
( Rupees
TwentyThree(Paise
FourtyFive ) Only
(ii) Extra lift for every 1.5 M or part thereof beyond the initial CuM Rs. 23.39
lift of 1.5 M. ( Rupees
TwentyThree(Paise
ThirtyNine ) Only
19
Sl No Name of Item Unit Rate
6.30 Compaction of earthwork by hand roller in canal CuM Rs. 147.22
24.9 embankment, bed, approach road etc complete as ( Rupees One Hundred
directed. FourtySeven(Paise
TwentyTwo ) Only
6.31(B) Earthwork in filling in all soils in canal embankment and CuM Rs. 679.04
bed filling as per design section and grade by cart carriage ( Rupees Six Hundred
for a minimum distance of 1 KM including paying SeventyNine(Paise Four )
Only
compensation of earth obtained from private land if any
loading, unloading, spreading the same in embankment in
layers not exceeding 15 cm thick including clearing light
jungle, removing trees upto 15 cm dia and uprooting roots
and stumps etc. from the seat of the embankment,
breaking clods not more than 10 mm cube, ramming,
dressing and roughening the seat of the embankment,
profiling etc. with all lift, complete as directed. (Payment
will be made after deduction of 12.50% shrinkage
allowance from the gross quantity).
********
20
7. DEWATERING
7. DEWATERING
Sl No Name of Item Unit Rate
A. DEWATERING IN C C WORK
7.1 Dewatering of CC works considering 1 no. 10 HP and 1
no. of 5 HP pump including POL, carriage and operator's
pay etc.
B. DEWATERING IN EARTHWORK
7.2 Cost of dewatering in excavation of earthwork by HP Rs. 25.81
running required no. of pumps including the cost of / Hr ( Rupees TwentyFive(Paise
POL, hire charge, labour charge etc. and handling for a EightyOne ) Only
depth of maximum 3.2 M, complete as directed.
********
21
8. SCAFFOLDING
8. SCAFFOLDING
Sl No Name of Item Unit Rate
8.1 Providing scaffolding work with rows of bhaluka CuM Rs. 106.16
bamboo and jati bamboo horizontal one row jati ( Rupees One Hundred
bamboo cross and placing second class planks of 0.025 Six(Paise Sixteen ) Only
M thick in between the rows tying with coir strings
lacing two nos. vertical jati bamboo at both end
including dismantling the scaffolding etc, complete as
directed.
********
22
9. SHUTTERING
9. SHUTTERING
Sl No Name of Item Unit Rate
9.1 Centering and shuttering including propping etc where
necessary and removal of forms after completion of CC
and RCC works, complete as directed. (Measurement to
be taken on the face area timbered).
23
Sl No Name of Item Unit Rate
9.2 Centering and shuttering including propping, nailing,
bolting with earth oiling inside face etc and removal of
forms after completion of CC and RCC works etc,
complete as directed. (Measurement to be taken on the
face area timbered).
(Abutment / Return Wall / Piers / Pedestal etc.)
********
24
10. C C WORK
10. C C WORK
Sl No Name of Item Unit Rate
10.1 IN PROPORTION 1:1½:3 (M20)
(A) WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM
(i) CC work in proportion 1:1½:3 with hard broken river stone CuM Rs. 10517.78
aggregate of size 6 mm to 20 mm including curing, with ( Rupees Ten
necessary timber shuttering, scaffolding where necessary, Thousand Five
Hundred
complete as directed. (Shuttering, scaffolding cost will be paid
Seventeen(Paise
separately).
SeventyEight ) Only
(ii) CC work in proportion 1:1½:3 with hard broken River stone CuM Rs. 10797.95
aggregate of size 6 mm to 20 mm including curing, bailing ( Rupees Ten
out water with necessary timber shuttering, scaffolding Thousand Seven
Hundred
where necessary, complete as directed. (Shuttering,
NinetySeven(Paise
scaffolding cost will be paid separately).
NinetyFive ) Only
(iii) CC work in proportion 1:1½:3 with hard broken river stone CuM Rs. 10901.43
aggregate from river boulder of size 6 mm to 20 mm ( Rupees Ten
including curing, dewatering with necessary timber Thousand Nine
Hundred One(Paise
shuttering, scaffolding where necessary, complete as
FourtyThree ) Only
directed. (Shuttering, scaffolding cost will be paid separately).
(i) CC work in proportion 1:1½:3 with hard river shingles of size CuM Rs. 8995.07
6 mm to 20 mm including curing with necessary timber ( Rupees Eight
shuttering, scaffolding where necessary, complete as Thousand Nine
Hundred
directed. (Shuttering, scaffolding cost will be paid
NinetyFive(Paise
separately). Seven ) Only
(ii) CC work in proportion 1:1½:3 with hard river shingles of size CuM Rs. 9275.24
6 mm to 20 mm including curing, bailing out water with ( Rupees Nine
necessary timber shuttering, scaffolding where necessary, Thousand Two
Hundred
complete as directed. (Shuttering, scaffolding cost will be paid
SeventyFive(Paise
separately).
TwentyFour ) Only
(iii) CC work in proportion 1:1½:3 with hard river shingles of size CuM Rs. 9378.72
6 mm to 20 mm including curing, dewatering with necessary ( Rupees Nine
timber shuttering, scaffolding where necessary, complete as Thousand Three
Hundred
directed. (Shuttering, scaffolding cost will be paid separately). SeventyEight(Paise
SeventyTwo ) Only
25
Sl No Name of Item Unit Rate
10.2 IN PROPORTION 1:2:4 (M15)
(A) WITH HARD BROKEN STONE AGGREGATE 6 MM TO 20 MM
(i) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10493.53
/ wing walls etc. with hard broken stone aggregate of size 6 ( Rupees Ten
mm to 20 mm including curing with necessary timber Thousand Four
Hundred
shuttering, scaffolding where necessary complete as
NinetyThree(Paise
directed. (Shuttering, scaffolding cost will be paid FiftyThree ) Only
separately).
(ii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10773.70
/ wing walls etc. with hard broken stone aggregate of size 6 ( Rupees Ten
mm to 20 mm including curing, bailing out water with Thousand Seven
Hundred
necessary timber shuttering, scaffolding where necessary,
SeventyThree(Paise
complete as directed. (Shuttering, scaffolding cost will be Seventy ) Only
paid separately).
(iii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10877.18
/ wing walls etc. with hard broken stone aggregate of size 6 ( Rupees Ten
mm to 20 mm including curing, dewatering with necessary Thousand Eight
Hundred
timber shuttering, scaffolding etc. where necessary
SeventySeven(Paise
complete as directed. (Shuttering, scaffolding cost will be Eighteen ) Only
paid separately).
(ii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 9005.74
/ wing walls etc. with hard river shingles of size 6 mm to 20 ( Rupees Nine
mm including curing, bailing out water with necessary Thousand Five(Paise
SeventyFour ) Only
timber shuttering, scaffolding where necessary, complete as
directed. (Shuttering, scaffolding cost will be paid
separately).
(iii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 9109.22
/ wing walls etc. with hard river shingles of size 6 mm to 20 ( Rupees Nine
mm including curing, dewatering with necessary timber Thousand One
Hundred Nine(Paise
shuttering, scaffolding where necessary, complete as
TwentyTwo ) Only
directed. (Shuttering, scaffolding cost will be paid separately).
26
Sl No Name of Item Unit Rate
( C) WITH HARD BROKEN STONE AGGREGATE 13 TO 38 MM
(i) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10133.31
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Ten
mm to 38 mm including curing with necessary timber Thousand One
Hundred
shuttering, scaffolding etc. where necessary complete as
ThirtyThree(Paise
directed. (Shuttering, scaffolding cost will be paid ThirtyOne ) Only
separately).
(ii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10413.48
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Ten
mm to 38 mm including curing with bailing out water with Thousand Four
Hundred
necessary timber shuttering, scaffolding etc. where
Thirteen(Paise
necessary, complete as directed. (Shuttering, scaffolding FourtyEight ) Only
cost will be paid separately).
(iii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 10516.96
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Ten
mm to 38 mm including curing including dewatering with Thousand Five
Hundred
necessary timber shuttering, scaffolding etc. where
Sixteen(Paise
necessary, complete as directed. (Shuttering, scaffolding NinetySix ) Only
cost will be paid separately).
(ii) CC work in proportion 1:2:4 in foundation / abutment / piers CuM Rs. 8777.28
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Eight
mm including curing, bailing out water with necessary Thousand Seven
Hundred
timber shuttering, scaffolding etc. where necessary,
SeventySeven(Paise
complete as directed. (Shuttering, scaffolding cost will be TwentyEight ) Only
paid separately).
(iii) CC work in proportion 1:2:4 in foundation / abutment/ piers CuM Rs. 8880.76
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Eight
mm including curing with dewatering with necessary timber Thousand Eight
Hundred Eighty(Paise
shuttering, scaffolding etc. where necessary, complete as
SeventySix ) Only
directed. (Shuttering, scaffolding cost will be paid
separately).
27
Sl No Name of Item Unit Rate
(i) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9346.64
/ wing walls etc.with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 38 mm including curing with necessary timber Thousand Three
Hundred
shuttering, scaffolding etc. where necessary, complete as
FourtySix(Paise
directed. (Shuttering, scaffolding cost will be paid SixtyFour ) Only
separately).
(ii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9626.81
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 38 mm including curing, bailing out water with Thousand Six
Hundred
necessary timber shuttering, scaffolding etc. where
TwentySix(Paise
necessary complete as directed. (Shuttering, scaffolding cost EightyOne ) Only
will be paid separately).
(iii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9730.29
/ wing walls etc.with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 38 mm including curing, dewatering with necessary Thousand Seven
Hundred Thirty(Paise
timber shuttering, scaffolding etc. where necessary,
TwentyNine ) Only
complete as directed. (Shuttering, scaffolding cost will be
paid separately).
(i) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 7866.19
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Seven
mm including curing with necessary timber shuttering, Thousand Eight
Hundred
scaffolding etc. where necessary, complete as directed.
SixtySix(Paise
(Shuttering, scaffolding cost will be paid separately). Nineteen ) Only
(ii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 8146.35
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Eight
mm including curing, bailing out water with necessary Thousand One
Hundred
timber shuttering, scaffolding etc. where necessary,
FourtySix(Paise
complete as directed. (Shuttering, scaffolding cost will be ThirtyFive ) Only
paid separately).
28
Sl No Name of Item Unit Rate
(iii) CC work in proportion 1:3:6 in foundation / abutment / CuM Rs. 8249.83
piers / wing walls etc. with hard river shingles of size 13 mm ( Rupees Eight
to 38 mm including curing, dewatering with necessary Thousand Two
Hundred
timber shuttering, scaffolding etc. where necessary,
FourtyNine(Paise
complete as directed. (Shuttering, scaffolding cost will be EightyThree ) Only
paid separately).
(i) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9545.39
/ wing walls etc. with broken stone aggregate of size 13 mm ( Rupees Nine
to 25 mm including curing with timber shuttering, Thousand Five
Hundred
scaffolding etc. where necessary complete as directed.
FourtyFive(Paise
(Shuttering, scaffolding cost will be paid separately). ThirtyNine ) Only
(ii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9825.56
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 25 mm including curing, bailing out wate r with Thousand Eight
Hundred
timber shuttering, scaffolding etc. where necessary,
TwentyFive(Paise
complete as directed. (Shuttering, scaffolding cost will be FiftySix ) Only
paid separately).
(iii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 9929.04
/ wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 25 mm including curing, dewatering with timber Thousand Nine
Hundred
shuttering, scaffolding etc. where necessary, complete as
TwentyNine(Paise
directed. (Shuttering, scaffolding cost will be paid Four ) Only
separately).
(i) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 7976.98
/ wing walls etc. with hard river shingles of size 13 mm to 25 ( Rupees Seven
mm including curing with timber shuttering, scaffolding etc. Thousand Nine
Hundred
where necessary complete as directed. (Shuttering,
SeventySix(Paise
scaffolding cost will be paid separately). NinetyEight ) Only
(ii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 8257.15
/ wing walls etc. with hard river shingles of size 13 mm to 25 ( Rupees Eight
mm including curing, bailing out water with timber Thousand Two
Hundred
shuttering, scaffolding etc. where necessary, complete as
FiftySeven(Paise
directed. (Shuttering, scaffolding cost will be paid Fifteen ) Only
separately).
29
Sl No Name of Item Unit Rate
(iii) CC work in proportion 1:3:6 in foundation / abutment / piers CuM Rs. 8360.63
/ wing walls etc. with hard river shingles of size 13 mm to 25 ( Rupees Eight
mm including curing, dewatering with timber shuttering, Thousand Three
Hundred Sixty(Paise
scaffolding etc. where necessary, complete as directed.
SixtyThree ) Only
(Shuttering, scaffolding cost will be paid separately).
(ii) CC work in proportion 1:4:8 in foundation / abutment / piers CuM Rs. 9213.96
/ wing walls etc.with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 38 mm including curing, bailing out water with Thousand Two
Hundred
necessary timber shuttering, scaffolding etc. where
Thirteen(Paise
necessary complete as directed. (Shuttering, scaffolding cost NinetySix ) Only
will be paid separately).
(iii) CC work in proportion 1:4:8 in foundation/ abutment/ piers/ CuM Rs. 9317.44
wing walls etc. with hard broken stone aggregate of size 13 ( Rupees Nine
mm to 38 mm including curing and dewatering with Thousand Three
Hundred
necessary timber shuttering, scaffolding etc. where
Seventeen(Paise
necessary, complete as directed. (Shuttering, scaffolding FourtyFour ) Only
cost will be paid separately).
(i) CC work in proportion 1:4:8 in foundation / abutment / piers CuM Rs. 7366.10
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Seven
mm including curing with necessary timber shuttering, Thousand Three
Hundred
scaffolding etc. where necessary, complete as directed.
SixtySix(Paise Ten )
(Shuttering, scaffolding cost will be paid separately). Only
30
Sl No Name of Item Unit Rate
(ii) CC work in proportion 1:4:8 in foundation / abutment / piers CuM Rs. 7646.26
/ wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Seven
mm including curing, bailing out of water with necessary Thousand Six
Hundred
timber shuttering, scaffolding etc. where necessary,
FourtySix(Paise
complete as directed. (Shuttering, scaffolding cost will be TwentySix ) Only
paid separately).
(iii) CC work in proportion 1:4:8 in foundation/ abutment/ piers/ CuM Rs. 7749.74
wing walls etc. with hard river shingles of size 13 mm to 38 ( Rupees Seven
mm including curing, dewatering with necessary timber Thousand Seven
Hundred
shuttering, scaffolding etc. where necessary, complete as
FourtyNine(Paise
directed. (Shuttering, scaffolding cost will be paid SeventyFour ) Only
separately).
********
31
11. P.C.C. WORK
WITH PLUM
11. P C C WORK WITH PLUM
Sl No Name of Item Unit Rate
11.1 PLAIN CC WORK WITH 40% PLUM HARD BOULDER IN PROPORTION 1:3:6
(A) WITH HARD BLASTED BOULDER
(i) Plain CC work in 40% plum hard blasted boulder of 15 CuM Rs. 7275.34
cm to 23 cm size and filled interstices with 60% cement ( Rupees Seven Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size Two Hundred
SeventyFive(Paise
stone aggregate including curing, shuttering etc,
ThirtyFour ) Only
complete as directed. (Shuttering cost will be paid
separately).
(ii) Plain CC work in 40% plum hard blasted boulder of 15 CuM Rs. 7658.98
cm to 23 cm size and filled interstices with 60% cement ( Rupees Seven Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size Six Hundred
FiftyEight(Paise
stone aggregate including curing, dewatering
NinetyEight ) Only
shuttering etc, complete as directed. (Shuttering cost
will be paid separately).
(iii) Plain CC work in 40% plum hard blasted boulder of 15 CuM Rs. 6387.06
cm to 23 cm size and filled interstices with 60% cement ( Rupees Six Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size Three Hundred
EightySeven(Paise Six )
river shingles including curing, shuttering etc, complete
Only
as directed. (Cost of shuttering will be paid separately).
(iv) Plain CC work in 40% plum hard blasted boulder of 15 CuM Rs. 6770.71
cm to 23 cm size and filled interstices with 60% cement ( Rupees Six Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size Seven Hundred
Seventy(Paise SeventyOne
river shingles including curing, dewatering , shuttering
) Only
etc, complete as directed. (Shuttering cost will be paid
separately).
(i) Plain CC work in 40% plum hard river boulder of 15 cm CuM Rs. 6137.69
to 23 cm size and filled interstices with 60% cement ( Rupees Six Thousand One
concrete in proportion 1:3:6 with 13 mm to 38 mm size Hundred ThirtySeven(Paise
SixtyNine ) Only
river shingles including curing, shuttering etc, complete
as directed. (Shuttering cost will be paid separately).
32
Sl No Name of Item Unit Rate
(ii) Plain CC work in 40% plum hard river boulder of 15 cm CuM Rs. 6521.34
to 23 cm size and filled interstices with 60% cement ( Rupees Six Thousand Five
concrete in proportion 1:3:6 with 13 mm to 38 mm size Hundred TwentyOne(Paise
ThirtyFour ) Only
river shingles including curing, dewatering , shuttering
etc, complete as directed. (Shuttering cost will be paid
separately).
(iii) Plain CC work in 40% plum hard river boulder of 15 cm CuM Rs. 7025.97
to 23 cm size and filled interstices with 60% cement ( Rupees Seven Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size TwentyFive(Paise
NinetySeven ) Only
stone aggregate including curing, shuttering etc.
complete as directed. (Shuttering cost will be paid
separately).
(iv) Plain CC work in 40% plum hard river boulder of 15 cm CuM Rs. 7409.62
to 23 cm size and filled interstices with 60% cement ( Rupees Seven Thousand
concrete in proportion 1:3:6 with 13 mm to 38 mm size Four Hundred Nine(Paise
SixtyTwo ) Only
stone aggregate including curing, dewatering
shuttering etc, complete as directed. (Shuttering cost
will be paid separately).
********
33
12. R C C WORK
12. RCC WORK
Sl No Name of Item Unit Rate
12.1 IN PROPORTION 1:1½:3 (M20)
(A) WITH HARD BROKEN STONE AGGREGATE SIZE 6 MM TO 20 MM
(i) RCC work in slab, abutment cap and above abutment, CuM Rs. 11982.56
pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 ( Rupees Eleven Thousand
with hard broken stone aggregate of size 6 mm to 20 mm Nine Hundred
EightyTwo(Paise FiftySix )
with proper reinforcement as per design including curing
Only
etc, complete as directed with necessary timber
shuttering, scaffolding etc. where necessary, complete as
directed. (Shuttering, scaffolding cost will be paid
separately).
(ii) RCC work in slab, abutment cap and above abutment, CuM Rs. 12366.21
pier cap, pedestals, dirt wall etc. in proportion 1:1½:3 ( Rupees Twelve
with hard broken stone aggregate of size 6 mm to 20 mm Thousand Three Hundred
SixtySix(Paise TwentyOne
with proper reinforcement as per design including
) Only
necessary curing, dewatering etc. complete as directed
with necessary timber shuttering, scaffolding etc. where
necessary, complete as directed. (Shuttering, scaffolding
cost will be paid separately).
(ii) RCC work in slab, abutment cap and above abutment, CuM Rs. 10747.27
pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 ( Rupees Ten Thousand
with hard river shingles of size 6 mm to 20 mm with Seven Hundred
FourtySeven(Paise
proper reinforcement as per design including necessary
TwentySeven ) Only
curing, dewatering etc. complete as directed with
necessary timber shuttering, scaffolding etc. where
necessary, complete as directed. (Shuttering, scaffolding
cost will be paid separately).
34
Sl No Name of Item Unit Rate
(ii) RCC work in slab, abutment cap and above abutment, CuM Rs. 11816.87
pier cap, pedestals, dirt wall etc. in proportion 1:2:4 with ( Rupees Eleven Thousand
hard broken stone aggregate of size 6 mm to 20 mm with Eight Hundred
Sixteen(Paise EightySeven
proper reinforcement as per design including necessary
) Only
curing, dewatering etc. with necessary timber shuttering,
scaffolding etc. where necessary, complete as directed.
(Shuttering, scaffolding cost will be paid separately).
(ii) RCC work in slab, abutment cap and above abutment, CuM Rs. 10178.10
pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with ( Rupees Ten Thousand
hard river shingles of size 6 mm to 20 mm with proper One Hundred
SeventyEight(Paise Ten )
reinforcement as per design including necessary curing,
Only
dewatering etc. with necessary timber shuttering,
scaffolding etc. where necessary, complete as directed.
(Shuttering, scaffolding cost will be paid separately).
35
Sl No Name of Item Unit Rate
12.3 RCC work in slab, abutment cap and above abutment,
24.19 pier cap, pedestal, dirt wall etc. in proportion 1:1:2 (M25)
with hard broken stone aggregate of size 6 mm to 20 mm
with proper reinforcement as per design including curing
etc. complete as directed with necessary timber
shuttering, scaffolding etc. where necessary complete as
directed. (Reinforcement, shuttering, scaffolding cost will
be paid separately).
12.5 Machine mixing charge of cement concrete / reinforced CuM Rs. 289.29
24.19 cement concrete with different types of concrete mixture ( Rupees Two Hundred
machine of 10 / 7 CuFt capacity. EightyNine(Paise
TwentyNine ) Only
12.6 Vibrating in CC / RCC work with vibrator including local CuM Rs. 241.97
24.18 carriage of vibrator etc. complete as directed. ( Rupees Two Hundred
FourtyOne(Paise
NinetySeven ) Only
********
36
13. BRICK WORK
13. BRICK WORK
Sl No Name of Item Unit Rate
13.1 1st class brick work in cement mortar in abutment and
wing wall, parapet wall etc, including racking out joints
and curing etc, complete as directed.
********
37
14. PLASTERING
14. PLASTERING
Sl No Name of Item Unit Rate
14.1 6 mm cement plastering including clearing surface and
curing, complete as directed.
********
38
15. BRIDGE
15. BRIDGE
Sl No Name of Item Unit Rate
BAMBOO FOOT BRIDGE
15.1 Construction of 1.20 M wide bamboo foot bridge with RM Rs. 1373.94
100 mm dia bhaluka / barak bamboo posts driven 120 cm ( Rupees One Thousand
to 180 cm under ground 3 nos. of each row being at 3 M Three Hundred
SeventyThree(Paise
apart tied with cane or wire bhaluka / barak bamboo
NinetyFour ) Only
dham placed over the posts and tied with the cane or
wire bhaluka / barak bamboo strut in each row both
upstream and downstream jati bamboo long girth closely
placed and tied with dham single layers of mat placed
over 75 mm thick brush wood and tied with bhaluka /
barak bamboo rail stand fixed in one side of the bridge,
complete as directed.
39
Sl No Name of Item Unit Rate
15.3 Supplying and driving Azar / Nahar / Nageswar / Zamil
piles 25 cm to 30 cm dia dressed to hard wood including
marking length in every 30 cm interval and coaltaring 2
coats with best tar applied hot. (Rate is inclusive of required
quantity of the tar).
WOODEN BRIDGE
15.4 Sal wood work including supplying fitting and fixing CuM Rs. 190128.27
complete with necessary MS nuts bolts, screws etc. and ( Rupees One Lakh
coaltaring 2 coats with best tar applied hot (rate is Ninety Thousand One
Hundred
inclusive of required quantity of the tar).
TwentyEight(Paise
Undressed in floor planks collars, bracing standard wheel TwentySeven ) Only
guard struts and railing, tracking planks (alternate railing
to be done with checking in stage and wing), runner
belts, rail post.
15.5 Supplying fitting and fixing sal timber beam and bearing CuM Rs. 118439.73
beam rectangular in size fitted with MS cleats straps ( Rupees One Lakh
including supplying spikes etc. as necessary and Eighteen Thousand Four
Hundred
coaltaring 2 coats with best tar applied hot. (Rate is
ThirtyNine(Paise
inclusive of required quantity of the tar). SeventyThree ) Only
40
Sl No Name of Item Unit Rate
15.6 Supplying fitting 25 cm to 30 cm dia Sal wood long beam RM Rs. 4706.03
dressed to hardwood including supplying & fixing with 20 ( Rupees Four Thousand
mm dia MS bolts and nuts including coaltaring 2 coats Seven Hundred Six(Paise
Three ) Only
with best tar, applied hot as directed. (Rate is inclusive
of cost of coaltar).
15.7 Azar / Nahar / Nageswar / Zarul / Cham / Sundi / Gumi CuM Rs. 74359.65
woodwork including supplying, fitting and fixing ( Rupees SeventyFour
complete with necessary nut-bolts, nails, screws etc. and Thousand Three Hundred
FiftyNine(Paise SixtyFive )
coaltaring 2 coats with coal tar applied hot as directed.
Only
(Rate is inclusive of required quantity of the tar).
Undressed in floor planks collars, bracing standard
wheel guard struts and railing, runner belts, rail post,
tracking planks.
15.8 Supplying fitting and fixing Azar / Nahar / Nageswar / CuM Rs. 86674.42
Zarul sawn timber beam and bearing beam rectangular in ( Rupees EightySix
size fitted with MS cleats, straps including spikes etc. as Thousand Six Hundred
SeventyFour(Paise
necessary and coaltaring 2 coats with best tar applied
FourtyTwo ) Only
hot as directed. (Rate is inclusive of required quantity of
the tar).
15.10 Supplying fitting and fixing RCC guard post of size 15 cm Post Rs. 2064.29
x 15 cm and 150 cm long of which 75 cm below ground ( Rupees Two Thousand
including square base of size 45 cm x 45 cm x 15 cm with SixtyFour(Paise
TwentyNine ) Only
4 nos. of 12 mm dia TS as main reinforcement and 6 mm
dia stirrups at 30 cm c/c apart tying in position with black
wire with cement concrete in proportion 1:2:4 with
broken stone aggregate of size 6 mm to 20 mm including
centering, shuttering and curing with 6 mm thick cement
plastering in proportion 1:3 painted black & white
alternatively in 23 cm stripe upto 75 cm from top
keeping necessary goods etc. as per design and direction,
complete as directed.
41
Sl No Name of Item Unit Rate
15.11 Supplying fitting and fixing 20 cm to 25 cm dia jungle Post Rs. 2700.22
wood dressed guard post 150 cm long 75 cm above ( Rupees Two Thousand
ground and 72 cm to be driven under ground fitted with Seven Hundred (Paise
TwentyTwo ) Only
a horizontal struts size 0.05 M x 0.05 M x 0.55 M long at
bottom with necessary nails including coaltaring 1 (one)
coat the portion below ground and painting black &
white 1 (one) coat alternately the portion above ground.
15.12 Screwing & joining of piles 25 cm to 30 cm dia dressed to Joint Rs. 2553.16
hard wood 90 cm in length including supplying fitting and ( Rupees Two Thousand
fixing with 2 nos. of 50 mm x 10 mm MS / FI clamps and Five Hundred
FiftyThree(Paise Sixteen )
16 mm dia MS bolts and nuts etc, complete as directed.
Only
15.13 Labour for taking out old piles of the bridge and stacking Pile Rs. 3180.49
them at suitable places as directed. ( Rupees Three Thousand
One Hundred Eighty(Paise
FourtyNine ) Only
42
Sl No Name of Item Unit Rate
(ii) Portion of pile to remain above ground. RM Rs. 796.64
( Rupees Seven Hundred
NinetySix(Paise SixtyFour
) Only
15.15 Labour for fitting & fixing RS joist, beam, CI saddle in RM Rs. 1235.88
position including necessary scaffolding, cutting them to
( Rupees One Thousand
required size drilling holes and supply and fixing with Two Hundred
necessary bolt, nuts, painting 2 coats, complete as ThirtyFive(Paise
directed. (Rate inclusive. of cost of tar and steel paint). EightyEight ) Only
15.16 Labour for fitting & fixing old RS joist, beam & old CI RM Rs. 1061.67
saddle in position including necessary scaffolding and ( Rupees One Thousand
fixing with necessary cutting them to required size SixtyOne(Paise
drilling holes and supplying and fixing with necessary SixtySeven ) Only
bolts, nuts, painting 2 coats, complete as directed. (Rate
inclusive of cost of tar and steel paint).
15.17 Labour for end fitting MS / FI straps of cleats etc. in Qntl. Rs. 5419.25
position including drilling holes and carrying the same to ( Rupees Five Thousand
site. Four Hundred
Nineteen(Paise
TwentyFive ) Only
15.18 Labour charge for making 0.5 M x 0.50 M x 0.30 M size No. Rs. 861.64
"U" shape MS flat iron strap from 150 mm x 12 mm size ( Rupees Eight Hundred
MS flat including providing 10 nos of holes and fitted SixtyOne(Paise SixtyFour
with 0.35 M long 20 mm dia MS bolts including fitting ) Only
lightly with bearing beam pits and RS beam etc, complete
as directed. (Rate inclusive of the cost of MS bolts and
nuts required).
15.19 Labour for fitting and fixing wood work including RM Rs. 5100.10
supplying and fixing with new bolts, nuts and spikes and ( Rupees Five Thousand
coaltaring the coats applied hot. (Rate inclusive the cost One Hundred (Paise Ten )
Only
of coaltar).
43
Sl No Name of Item Unit Rate
15.20 Labour for refitting wood work including sizing supplying RM Rs. 4690.13
and fixing necessary MS bolts, nuts and spikes and ( Rupees Four Thousand
coaltaring 1 (one) coat applied hot as directed. (Rate Six Hundred Ninety(Paise
inclusive the cost of coaltar). Thirteen ) Only
15.21 Labour for fitting & fixing 25 cm to 30 cm dia long beam RM Rs. 817.22
including supplying and fixing necessary MS bolts, nuts ( Rupees Eight Hundred
etc. and coaltaring the 2 coats, complete as directed. Seventeen(Paise
(Rate inclusive the cost of coaltar). TwentyTwo ) Only
15.22 Labour for refitting & refixing 25 cm to 30 cm dia long RM Rs. 901.01
beam including supplying and fixing necessary MS bolts, ( Rupees Nine Hundred
nuts etc. and coaltaring 1(one) coat applied as directed. One(Paise One ) Only
(Rate inclusive the cost of coaltar).
15.23 Labour for taking out work of the bridge and refitting the SqM Rs. 5714.83
same including supplying and fixing with necessary new ( Rupees Five Thousand
MS bolts, nuts and spikes and nails etc. and coaltaring Seven Hundred
the 1 (one) coat applied hot as directed. (Rate inclusive. Fourteen(Paise
EightyThree ) Only
the cost of coaltar).
(A) Clearing and painting work with the white paint SqM Rs. 93.93
: 1 (one) coat. ( Rupees
NinetyThree(Paise
NinetyThree ) Only
( C) Clearing and painting iron works with aluminium paint - 1 SqM Rs. 115.99
(one) coat. ( Rupees One Hundred
Fifteen(Paise NinetyNine
) Only
********
44
16. CULVERT
16. CULVERT
Sl No Name of Item Unit Rate
16.1 Cement pointing including racking out joints and curing
etc, complete as directed.
********
45
17. RCC WATER TROUGH
17. R C C WATER TROUGH
Sl No Name of Item Unit Rate
17.1 Construction and manufacturing of CC lined precast "U"
shaped section in proportion 1:2:4 with hard broken
stone aggregate of size 6 mm to 20 mm including
supplying expanded 18 gauge metal, horizontal
reinforcement and vibrating, carrying to stack yard,
curing, etc, complete as directed.
17.2 Labour charge for laying and fixing RCC "U" shaped RM Rs. 545.93
section in proper position and grade as per design ( Rupees Five Hundred
drawing and specification including fitting and joints FourtyFive(Paise
NinetyThree ) Only
voids as of main concrete on top inside to wall finished
with 12 mm thick cement mortar in proportion 1:3
including curing and local carriage, etc, complete as
directed.
********
46
18. CANAL WORK
18. CANAL WORK
Sl No Name of Item Unit Rate
18.1 Providing 50 mm wide expansion joints with bituminous RM Rs. 539.05
compound mixed with coarse sand for canal work at an ( Rupees Five Hundred
interval of 10 M apart including laying, fitting the compound ThirtyNine(Paise Five ) Only
in proper position, etc, complete as directed.
18.2 Soling in foundation at all levels including filling intersides, SqM Rs. 802.20
ramming etc complete as directed and of specified thickness ( Rupees Eight Hundred
with 9 cm brick on flat including sand packing. Two(Paise Twenty ) Only
18.4 CC Work in lined canal in prop 1:2:4 with river shingles of CuM Rs. 8386.85
size 6 mm to 20 mm free from dust, dirt and other foreign ( Rupees Eight Thousand
materials conforming to IS 2116-1965 and 542-1962 as Three Hundred
EightySix(Paise EightyFive )
specified by the department, water used for mixing the
Only
mortar should be free from all impurities including laying
the concrete over the subgrade, moistened thoroughly by
hand placing / mechanical placing in canal of not more than
3 M sides with suitable joints in between including
providing bed sleepers (cast-in-situ or pre cast) under joints
in between including providing all sealing materials as per
design and drawing before laying concrete including
finishing the surface smooth, clean of all impurities with
curing the bed by manual labours and side by sprinkling for
at least 28 days etc, complete as directed.
(Proper arrangement for obtaining clean water should be
made at site).
********
47
19. PVC DISTRIBUTION
SYSTEM
19. PVC DISTRIBUTION SYSTEM
Sl No Name of Item Unit Rate
19.1 Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2 ),
joining pipes with relevant cement, levelling, testing
leakages etc, complete as directed. (Cost of E/W
foundation trenches will be paid separately).
19.2 Supplying, fitting, fixing PVC equal tee joining with pipes
with solvent cement testing leakages etc, complete as
directed.
(i) Size : 110 mm x 110 mm x 110 mm No. Rs. 958.61
( Rupees Nine Hundred
FiftyEight(Paise SixtyOne )
Only
48
Sl No Name of Item Unit Rate
(ii) Size : 200 mm x 200 mm x 160 mm No. Rs. 4625.46
( Rupees Four Thousand
Six Hundred
TwentyFive(Paise
FourtySix ) Only
19.5 Supplying, fitting, fixing PVC bend pipe size joining with
pipes with solvent cement, testing leakages etc,
complete as directed.
49
Sl No Name of Item Unit Rate
(iii) For 200 mm / 900 No. Rs. 2874.38
( Rupees Two Thousand
Eight Hundred
SeventyFour(Paise
ThirtyEight ) Only
19.6 Supplying, fitting, fixing 110 mm dia NTP valve at the No. Rs. 3704.78
top of PVC rising pipe of spout chamber as per ( Rupees Three Thousand
specification including local carriage, complete as Seven Hundred Four(Paise
SeventyEight ) Only
directed.
19.7 Supplying, fitting, fixing 110 mm dia PVC rising pipe No. Rs. 1183.92
from the toe of main line including local carriage, ( Rupees One Thousand
testing leakage etc, complete as directed. One Hundred
EightyThree(Paise
NinetyTwo ) Only
19.8(A) Supplying, fitting, fixing of PVC threaded coupler (FTA) No. Rs. 544.08
of size 110 mm dia fitting with solvent cement as per ( Rupees Five Hundred
specification including local carriage, testing leakage FourtyFour(Paise Eight )
etc, complete as directed. Only
19.8(B) Supplying, fitting, fixing of PVC threaded coupler fitted No. Rs. 835.30
with flange (MTA) of size 110 mm dia fitting with
( Rupees Eight Hundred
solvent cement as per specification including local ThirtyFive(Paise Thirty )
carriage, testing leakage etc, complete as directed. Only
50
Sl No Name of Item Unit Rate
(iii) For 200 mm dia No. Rs. 934.10
( Rupees Nine Hundred
ThirtyFour(Paise Ten )
Only
19.10 Removing of old PVC pipes and relaying, fitting, fixing, RM Rs. 575.79
pipes in position after repairing and clearing debris, ( Rupees Five Hundred
testing leakage including fitting with solvent cement etc, SeventyFive(Paise
SeventyNine ) Only
complete as directed. (Cost of any additional pipes and
accessories will be paid separately).
********
51
20. SHEET PILING
20. SHEET PILING
Sl No Name of Item Unit Rate
20.1 Supply of Z-type Sheet Pile of effective width 0.69 M, MT Rs. 142195.00
thickness 8 mm and average weight 68.30 Kg/M ( Rupees One Lakh
including loading and unloading. FourtyTwo Thousand One
Hundred NinetyFive ) Only
20.2 Providing and driving 'Z' type steel sheet pile of 0.69 M : SqM Rs. 24668.87
effective width, 8 mm thick and average weight 68.30 ( Rupees TwentyFour
kg/M to specified level and lines including cutting to Thousand Six Hundred
SixtyEight(Paise
proper size, making holes including painting sheet piles
EightySeven ) Only
with two coats of anticorrosive bitumen paint and
dewatering including necessary tools and plants and all
other accessories, complete as directed. (Portion of : MT Rs. 249460.48
sheet pile are to be embedded in concrete shall not be ( Rupees Two Lakh
painted). FourtyNine Thousand Four
Hundred Sixty(Paise
FourtyEight ) Only
20.3 Driving 'Z' type steel sheet pile of 0.69 M effective : SqM Rs. 10248.30
width, 8 mm thick and average weight 68.30 kg/M to ( Rupees Ten Thousand
specified level and lines including cutting to proper size, Two Hundred
FourtyEight(Paise Thirty )
making holes including painting sheet piles with two
Only
coats of anticorrosive bitumen paint and dewatering
including necessary tools and plants and all other
accessories, complete as directed. (Portion of sheet pile : MT Rs. 103634.52
are to be embedded in concrete shall not be painted). ( Rupees One Lakh Three
Thousand Six Hundred
ThirtyFour(Paise FiftyTwo )
Only
********
52
21. PROTECTION WORK
21. PROTECTION WORK
Sl No Name of Item Unit Rate
21.1 LABOUR CHARGE FOR BANK PITCHING
(A) Labour charge for pitching with one man size boulder CuM Rs. 853.55
including dressing and ramming the seat to proper size ( Rupees Eight Hundred
and slope, pitching etc. with local carriage of boulders FiftyThree(Paise FiftyFive
) Only
from a distance of 60 M with lift upto 3 M, complete as
directed.
(B) Labour charge for spreading of hard river gravel or CuM Rs. 459.19
broken stone of size 13 mm to 38 mm to the required ( Rupees Four Hundred
thickness including dressing and ramming the seat before FiftyNine(Paise Nineteen
) Only
laying the materials as directed with a lead upto 30 M
and lift upto 1.5 M, complete as directed.
(iii) Labour charge for making 1.00 M dia boulder sausage RM Rs. 709.77
( Rupees Seven Hundred
Nine(Paise SeventySeven )
Only
53
Sl No Name of Item Unit Rate
(B) Construction of 1.00 M square boulder sausage including
supplying of materials with 25 cm to 30 cm size boulders
collecting from a lead of 25 KM encased in 15 cm mesh of
8G hexagonal wire netting and filling the voids between
the boulders with stone not exceeding 18 cm in size tied
with 8G galvanized tying wire at 30 cm apart, laid in
position as directed including necessary local carriage of
materials including providing 1 (one) no. of jati bamboo
horizontal runner along the top of the sausage with
vertical bhaluka bamboo post 1.20 M apart driven at
least 0.60 M below ground and tying with sausage etc, all
complete as directed.
54
Sl No Name of Item Unit Rate
(ii) With river boulder RM Rs. 7295.74
( Rupees Seven Thousand
Two Hundred
NinetyFive(Paise
SeventyFour ) Only
55
Sl No Name of Item Unit Rate
(B) A' type bamboo spur with 75 mm to 100 mm dia whole RM Rs. 1035.35
bhaluka bamboo placed at 23 cm c/c driven 90 cm below ( Rupees One Thousand
ground and 120 cm to 150 cm above ground tied with jati ThirtyFive(Paise
bamboo kamies on either sides at 45 cm apart ThirtyFive ) Only
horizontally with galvanized wire etc, complete as
directed.
56
Sl No Name of Item Unit Rate
21.6 LAYING CEMENT BAGS
(A)(i) Supply and laying of cement bags filled with sand/ earth Bag Rs. 59.17
(as locally available) including stitching the mouth, laying, ( Rupees FiftyNine(Paise
fixing in position as directed complete with supply of Seventeen ) Only
bags, sutlies etc, all complete as directed.
(ii) Labour charge for filling the cement bags with sand / Bag Rs. 33.21
earth (as locally available) including stitching the mouth, ( Rupees
laying the filled bags in position etc, all complete as ThirtyThree(Paise
TwentyOne ) Only
directed.
********
57
22. DISMANTLING
22. DISMANTLING
Sl No Name of Item Unit Rate
(B) Dismantling the CC abutment wall and wing wall of RM Rs. 662.42
upper portion of ground level including removing the ( Rupees Six Hundred
debris from the site of works as directed. SixtyTwo(Paise FourtyTwo )
Only
Labour charge for dismantling / replacing the old No. Rs. 2560.44
damaged hume pipe of 1200 mm dia of canal ( Rupees Two Thousand Five
structure and carriage of the same upto a lead of 30 M Hundred Sixty(Paise
FourtyFour ) Only
and lift of 2.5 M and depositing the same in a safe
distance as directed.
58
Sl No Name of Item Unit Rate
22.4 For Boulder Sausage
Dismantling of old serviciable hexagonal wire netting CuM Rs. 790.96
encased boulder sausage including hammering digging ( Rupees Seven Hundred
carrying, unlifting the boulders including carriage upto Ninety(Paise NinetySix ) Only
60 M lead and upto 3.60 M lift including stacking in
suitable and measurable stacks etc, complete as
directed.
(B) Labour cost for dismantling of old CC canal lining and SqM Rs. 362.16
carriage of the materials and depositing the same in a safe ( Rupees Three Hundred
distance as directed complete. SixtyTwo(Paise Sixteen ) Only
: Carriage up to lead of 30 M and lift upto 1.50 M
(C) Labour charge for dismantling of old CC works of canal CuM Rs. 4683.86
structures and carriage the spoils and depositing the
24.28 ( Rupees Four Thousand Six
same in a safe distance as directed. Hundred EightyThree(Paise
: Carriage up to lead of 60 M and lift upto 9 M. EightySix ) Only
(D) Labour cost for dismantling of old CC canal lining and SqM Rs. 697.06
24.29 carriage of the materials and depositing the same in a ( Rupees Six Hundred
safe distance as directed complete NinetySeven(Paise Six ) Only
: Carriage up to lead of 60 M and lift upto 9 M.
22.6 Labour for dismantling of old CC work and stacking the CuM Rs 5451.65
24.27 spoils at suitable place including local carriage, ( Rupees Five Thousand Four
complete as directed. Hundred FiftyOne(Paise
SixtyFive ) Only
********
59
23. MISCELLANEOUS
23. MISCELLANEOUS
Sl No Name of Item Unit Rate
23.1 Making and maintaining sub-way 3 M wide including RM Rs. 804.78
providing barrier and sign board and lamp etc. ( Rupees Eight Hundred
Four(Paise SeventyEight )
Only
23.2 Providing weep holes with 50 mm dia GI pipes of No. Rs. 7545.65
required length and depth fitted with vertical non ( Rupees Seven Thousand
return valve (50 mm) of brass inside including cost of Five Hundred
FourtyFive(Paise SixtyFive
making filter of size 0.6 M x 0.6 M x 0.6 M fitted with
) Only
graded filter media at back side and covering the back
side with MS wire netting in the abutment, face wall
wall of Head Work including shuttering for providing
space at the time of casting cement concrete including
supplying fitting bend, nipple, etc, complete as directed.
23.3 Providing 75 mm dia. Weep Holes including supplying No. Rs. 363.40
and fixing 75 mm dia PVC pipe in weep holes, complete ( Rupees Three Hundred
SixtyThree(Paise Fourty ) Only
as directed.
23.4 Preparing / making level the ground surface for layout SqM Rs. 129.32
of Headwork / structures for fixing the required axis line ( Rupees One Hundred
by cutting the high land and filling and levelling the low TwentyNine(Paise
ThirtyTwo ) Only
land where necessary etc, complete as directed.
23.5 Labour charge for spreading of hard river gravel or CuM Rs. 592.78
broken stone of size 13 mm to 38 mm to the required ( Rupees Five Hundred
thickness including dressing and ramming the seat NinetyTwo(Paise
SeventyEight ) Only
before laying the materials as directed with a lead upto
30 M and lift upto 1.5 M, complete as directed.
23.6 Construction of temporary shed with 0.30 M high earth SqM Rs. 3489.36
plinth and floor with bhaluka bamboo post of size 100 ( Rupees Three Thousand
mm to 120 mm dia driven at least 0.75 M below GL and Four Hundred
EightyNine(Paise ThirtySix
2.75 M above plinth split jati bamboo walling tied with 3
) Only
lines of half bamboo (jati) kamies with 0.63 mm thick
GCI sheet roofing over jati bamboo framing with whole
bamboo struts fitted with post plate of bamboo purlins
tied with galvanized wire, coir string including providing
single dharamat jhap doors and windows, complete as
directed.
60
Sl No Name of Item Unit Rate
23.7 Supplying of quick setting concrete admixture of Litre Rs. 292.80
specified brand including loading and unloading, ( Rupees Two Hundred
carriage to the work site, complete as directed. NinetyTwo(Paise Eighty )
Only
23.8 Neat cement finishing 3 mm thick with cement slurry SqM Rs. 244.02
prepared by mixing 27.50 Kg of fresh cement in ( Rupees Two Hundred
appropriate quantity of clean water to cover 10 (ten) FourtyFour(Paise Two )
Only
SqM of work area and to give a smooth and hard
finishing including rounding corners, brooming, curing
etc, complete as directed.
23.9 Supplying 1 1/2" dia GI pipe for hand railing including RM Rs. 978.67
fitting & fixing the same in position etc, complete as ( Rupees Nine Hundred
directed. SeventyEight(Paise
SixtySeven ) Only
23.10 Providing rubber seal in the construction joints as per RM Rs. 5942.37
24.21 required size and shape and as per design and drawing, ( Rupees Five Thousand
16 mm minimum thickness including supplying, fitting Nine Hundred
FourtyTwo(Paise
and fixing complete as directed.
ThirtySeven ) Only
23.11 Supplying and mixing rapidite in concrete works below Litre Rs. 236.01
24.22 ground water level where necessary etc. complete as ( Rupees Two Hundred
directed. ThirtySix(Paise One ) Only
23.12 Supplying, fitting and fixing elastomeric bearing on the No. Rs. 21409.92
24.23 top of the pier caps and abutments and under side of ( Rupees TwentyOne
girder with epoxy resin, mortar etc. as directed Thousand Four Hundred
Nine(Paise NinetyTwo )
complete.
Only
23.13 Suuplying, fitting and fixing ISMB 450 (2 x 1350.70 cm) RM Rs. 7629.06
24.24 including carrying to worksite by crane / truck and ( Rupees Seven Thousand
making plain grooving in RCC works as per design and Six Hundred
TwentyNine(Paise Six )
drawing as directed by the department complete.
Only
61
Sl No Name of Item Unit Rate
23.14 Labour charges for spreading hard river shingles / sand CuM Rs. 452.70
24.25 gravels to required thickness over approach subway etc. ( Rupees Four Hundred
including ramming, dressing the seat before laying the FiftyTwo(Paise Seventy )
materials lead upto 30 M and lift 1.50 M, complete as Only
directed.
23.16 Supplying and laying of filter materials consisting of CuM Rs. 2161.71
24.16 sand and river shingles free from dust dirt and other ( Rupees Two Thousand
foreign materials and laying in three layers in position as One Hundred
per drawing and specification as directed by the SixtyOne(Paise
department. SeventyOne ) Only
********
62
CHART
OF
REQUIREMENT OF
MATERIALS
CHART OF REQUIREMENT OF MATERIALS (CEMENT / SAND / COARSE AGGREGATE)
4. WEIGHT OF MS / TS ROD
MS rod TS rod
Size
(Kg/RM) (Kg/RM)
1 2 3
6 mm 0.22 0.242
8 mm 0.39 0.43
10 mm 0.62 0.682
12 mm 0.89 0.98
14 mm 1.20 1.33
16 mm 1.58 1.74
20 mm 2.47 2.62
25 mm 3.85 4.24
63
HIRE CHARGES
DAILY WAGES OF LABOUR
&
RATES OF
MISCELLANEOUS ITEMS
RATES OF ROYALTY ON FOREST PRODUCE
Sl
Item Unit Rate Amount in Words
No
1 2 3 4 5
4% has to be added to the Estimate on overall items as per latest Gazette Notification.
Sl
Item Unit Rate Amount in Words
No
1 2 3 4 5
Truck with driver and handyman ( Rupees Six Thousand Five Hundred
1 Day Rs. 6500.00 ) Only
(without fuel)
2 Hand Cart (Thela) Day Rs. 900.00 ( Rupees Nine Hundred ) Only
6 Pump (7.5 HP) Hour Rs. 300.00 ( Rupees Three Hundred ) Only
10 Dumper with driver (without fuel) Day Rs. 7000.00 ( Rupees Seven Thousand ) Only
64
BASIC DAILY WAGES OF LABOURS
65
RATES OF MISCELLANEOUS ITEMS
Sl
Item Unit Rate Amount in Words
No
1 2 3 4 5
1 Compensation for removed earth CuM Rs. 120.00 ( Rupees One Hundred Twenty ) Only
pump
3 Minor repair and maintenace of pump Rs. 200.00 ( Rupees Two Hundred ) Only
/day
/pump/
(ii) 10 HP pump@ Rs. 350.00 ( Rupees Three Hundred Fifty ) Only
hr
5 Earth for filling in plinth CuM Rs. 490.00 ( Rupees Four Hundred Ninety ) Only
66
RATES OF
HumE pipES
pvc iTEmS
&
BASic RATES OF
mATERiAlS
RATES OF HUME PIPES
1 2 3 4 5
67
RATES OF PVC ITEMS
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
68
BASIC RATES OF MATERIALS
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
1 Cement Bag (50 kg) Rs. 360.00
2 MS Rod
(i) 6 mm dia Qntl Rs. 7585.00
(ii) 16 mm dia Qntl Rs. 7095.00
(iii) 20 mm dia Qntl Rs. 7210.00
3 Tor Steel Rod
(i) TATA Qntl Rs. 8400.00
(ii) Others (Shyam steel, Saiji steel, JSW steel, etc.) Qntl Rs. 7900.00
4 (i) GCI sheet (Dyna Roof 0.55 mm) SqM Rs. 650.00
(ii) GCI sheet (0.63 mm) SqM Rs. 455.00
(iii) GCI sheet --- 24 G (0.63 mm) Qntl Rs. 7700.00
5 (i) Galvanized plain sheet --- 24 G (0.50 mm) MT Rs. 76000.00
(ii) Galvanized plain sheet (0.63 mm thick) SqM Rs. 395.00
6 (i) Galvanized ridging (0.50 mm thick, 3.00 M long) Each Rs. 620.00
(ii) Galvanized ridging (0.63 mm thick, 3.00 M long) Each Rs. 780.00
7 AC ridging (1.00 M X 0.40 mm) Pair Rs. 280.00
8 AC building board (1.2 M X 1.2 M) 4 mm thick SqM Rs. 220.00
9 AC building board (12 M X 12 M) 6 mm thick SqM Rs. 320.00
10 GI wire (black) Kg Rs. 110.00
11 Ply Board
(i) 4 mm thick (medium) SqM Rs. 950.00
(ii) 6 mm thick (medium) SqM Rs. 1160.00
(iii) 8 mm thick (medium) SqM Rs. 1580.00
(iv) 19 mm thick SqM Rs. 2625.00
12 Common Burnt Brick
(i) 1st class brick Thousand Rs. 12500.00
(ii) Jhama brick Thousand Rs. 12000.00
13 (i) 1st class wooden scantling CuM Rs. 87500.00
(ii) 1st class local timber scantling (Hollock, Bonsum, Korai) CuM Rs. 49000.00
(iii) 2 nd class wooden pegs of size 0.60 M x 0.045 M x 0.045 M CuM Rs. 42000.00
(iv) 2nd class local wood peg of size 50 mm x 50 mm x 600 mm CuM Rs. 49000.00
(v) Local wood chainage peg of size 1½" x 1½" x 3' No. Rs. 190.00
14 (i) Teak timber plank CuM Rs. 122500.00
(ii) Sal wood plank CuM Rs. 140000.00
(iii) Azar/Nahar/Planks CuM Rs. 52500.00
69
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
15 Azar/Nahar log RM Rs. 4500.00
16 (A) Azar/Nahar beam CuM Rs. 63000.00
16 (B) Sal wood beam 25 cm to 30 cm dia
(i) Per RM Rate RM Rs. 3000.00
(ii) Per CuM Rate CuM Rs. 87500.00
17 Shuttering Timber (2nd Class Wood)
(i) Plank CuM Rs. 15050.00
(ii) Batten CuM Rs. 15750.00
18 Pile
(i) Sal pile 25 cm to 30 cm dia RM Rs. 4000.00
(ii) Azar / Nahar pile 25 cm to 30 cm dia RM Rs. 3200.00
(iii) Jungle wood pile 20 cm to 15 cm RM Rs. 1200.00
19 Bamboo
(i) Bhaluka bamboo No. Rs. 180.00
(ii) Jati bamboo No. Rs. 120.00
20 (i) Unchalked lime Kg Rs. 50.00
(ii) Unchalked lime Tin Rs. 850.00
21 Stainer for mixiing with lime Litre Rs. 40.00
22 Red oxide paint (berger) Litre Rs. 240.00
23 Enamel paint Litre Rs. 310.00
24 Goat proof wire netting (12 M length) Roll Rs. 1630.00
25 Anti corrosive & oxide paint Litre Rs. 330.00
26 Patent nail etc. Kg Rs. 150.00
27 Wire nail Kg Rs. 130.00
28 (i) Nuts & bolts Kg Rs. 130.00
(ii) Bolts and nuts full Each Rs. 88.00
29 (i) Screw Dozen Rs. 18.00
(ii) Screw 38 mm long Packet Rs. 90.00
30 Putty Kg Rs. 75.00
31 Varnish Litre Rs. 375.00
32 Distemper Kg Rs. 220.00
33 Barbed wire 12 mm Gauge Kg Rs. 125.00
34 Sealing compound Litre Rs. 365.00
35 Jute sutli Kg Rs. 135.00
36 Jute rope Kg Rs. 125.00
37 Coir string Kg Rs. 145.00
38 Coir rope Kg Rs. 110.00
70
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
39 Manila rope Kg Rs. 255.00
40 Nylon rope Kg Rs. 280.00
41 (i) Galvanized wire 22/20/08 gauge Kg Rs. 145.00
(ii) Galvanized wire 18/20 gauge Kg Rs. 155.00
(iii) Galvanized screw and limpet washer Kg Rs. 135.00
(iv) Launching wire Kg Rs. 150.00
42 Black wire 18/20 gauge Kg Rs. 145.00
43 Expanded metal SqM Rs. 160.00
44 Coal tar Litre Rs. 85.00
45 Earth oil Litre Rs. 45.00
46 Kiricide oil Litre Rs. 340.00
47 Kerosine oil Litre Rs. 90.00
48 Linseed oil Litre Rs. 135.00
49 Wood oil Litre Rs. 55.00
50 (i) Lime Kg Rs. 50.00
(ii) Lime (Rajasthan) Tin Rs. 330.00
51 M seal 100 gm Rs. 90.00
52 Chalk Kg Rs. 225.00
53 Cow dung Kg Rs. 35.00
54 Tarpin oil Litre Rs. 280.00
55 Spirit (mentholated) Litre Rs. 150.00
56 Gum Kg Rs. 125.00
57 Fevicol Kg Rs. 320.00
58 Lime colour of different shade Kg Rs. 110.00
59 Water proof compound Kg Rs. 145.00
60 Indigo Kg Rs. 210.00
61 Asbestos corrugated sheet SqM Rs. 360.00
62 Iron angles of different size MT Rs. 84000.00
63 (i) MS flat (ordinary) Qntl. Rs. 6000.00
(ii) MS flat Qntl. Rs. 6700.00
64 Flat iron (size : 50 mm x 10 mm) Kg Rs. 88.00
65 RS joist MT Rs. 85000.00
66 White cement 50 kg Bag Rs. 1750.00
67 Marble powder 25 kg Bag Rs. 650.00
68 Red oxide powder Kg Rs. 150.00
69 Thinner Litre Rs. 170.00
70 (i) Empty cement bag (Plastic) Each Rs. 20.00
(ii) Empty cement bag (Gunny) Each Rs. 28.00
71 Dharamat 1.50 M x 1.20 M SqM Rs. 150.00
72 Diesel Litre Rs. 85.00
73 Mobil Litre Rs. 390.00
71
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
74 Grease Kg Rs. 495.00
75 Bitumen Kg Rs. 180.00
76 Detonator Each Rs. 95.00
77 Gelatine Kg Rs. 220.00
78 Waste cotton Kg Rs. 50.00
79 (i) Hexagonal wire net 8 G/18 G SqM Rs. 300.00
(ii) Hexagonal wire net 10 G/13 G SqM Rs. 280.00
80 Tree branches 100 mm dia 2.50 M to 3.00 M long No. Rs. 60.00
81 Fuse wire Coil Rs. 135.00
82 Iron ring No. Rs. 40.00
83 Iron clamp Each Rs. 35.00
84 GI pipe (1 1/2 inch dia) RM Rs. 720.00
85 GI pipe (50 mm dia) RM Rs. 985.00
86 GI bend (50 mm dia) Each Rs. 160.00
87 GI nipple (50 mm dia) Each Rs. 200.00
88 Non return valve (50 mm dia) Each Rs. 3185.00
89 MS round pipe Kg Rs. 72.00
90 MS patti Kg Rs. 67.00
91 MS square bar Kg Rs. 67.00
92 MS angle of different size Kg Rs. 68.00
93 Wire net SqM Rs. 320.00
94 Filter materials CuM Rs. 1950.00
95 Rubber seal of minimum 16 mm thick RM Rs. 1900.00
96 Primer Litre Rs. 220.00
97 Quick setting admixure Litre Rs. 175.00
98 Rasin Kg Rs. 90.00
99 Hessian cloth SqM Rs. 55.00
100 Staples Kg Rs. 160.00
101 PVC pipe (75 mm dia) RM Rs. 225.00
102 Oxygen gas Kg Rs. 1450.00
103 Dissolved acetylene gas Kg Rs. 300.00
104 Brush No. Rs. 45.00
105 Painting brush No. Rs. 75.00
106 Power Brush No. Rs. 60.00
107 Washing Soap No. Rs. 60.00
108 River sand CuM Rs. 1200.00
109 Sign Board SqFt Rs. 280.00
72
Rate
Sl No Particulars Unit
(excluding GST)
1 2 3 4
110 Cemseal Kg Rs. 130.00
111 Soling stone CuM Rs. 2100.00
112 Hydraulic / Engine oil Litre Rs. 480.00
113 Rapidite Litre Rs. 170.00
114 ISMB 450 MT Rs. 68000.00
115 Chisel No. Rs. 280.00
116 Hammer No. Rs. 780.00
117 Heckshaw with blade No. Rs. 150.00
118 Elastomeric bearing CuM Rs. 1.35
119 (i) Hinge 150 mm long Each Rs. 50.00
(ii) Hinge 100 mm long Each Rs. 33.00
(iii) Hinge 75 mm long Each Rs. 28.00
(iv) Butt hinge Each Rs. 45.00
120 Lock No. Rs. 132.00
121 Iron handle Each Rs. 55.00
122 Kerosine lamp No. Rs. 450.00
123 Aluminium paint Litre Rs. 380.00
124 Pump
(i) 5 HP Pump No. Rs. 50000.00
(ii) 10 HP Pump No. Rs. 70000.00
Sheet Pile
125 Cost of sheet pile MT Rs. 104000.00
126 Transportation charge of sheet pile MT Rs. 7000.00
127 Unloading of sheet pile MT Rs. 1250.00
128 Hire charge of sheet pile driving rig Day Rs. 2000.00
129 Hire charge of welding machineries Day Rs. 250.00
130 Rental charge of gas cyliders Day Rs. 80.00
********
73