3. Which of the following is a project scheduling method that can be applied to software
development?
A) Know the cost of the project B) Know the status of the project
C) Know the user expectations D) None of These
7. The project life cycle consists of
A) Objectives of the project B) Understanding the scope of the project
C) Formulation and planning various activities D) All of these
8. The critical path is__________
A) Repeatable B) Design
C) Managed D) Optimised
13. In which of the following continuous process improvement is done?
22. Which of the following serves as metrics for project size estimation?
A. planning B. analysis
C. design D. All of the above
35. Which of the following tool is helpful in all the stages of SDLC?
38. What stores all changes and info related to the project from development through
maintenance in CASE tools?
A. Database B. Repository
C. Register D. Files
39. In reverse engineering, what refers to the level of detail that is provided at an
abstraction level?
A) interactivity B) completeness
C) abstraction level D) directionality
40. The core of reverse engineering is an activity called?
A) restructure code B) directionality
C) extract abstractions D) interactivity
Q2) Attempt any Two of the following:
Long Answer questions each of 8 marks
1. Explain the project development phases
2. Explain project life cycle
3. What is PERT chart? Explain in detail.
4. What is Gantt chart? Explain in detail.
5. What are the different organization types? Explain them.
6. What is CMM? Explain levels of CMM.
7. Explain ISO standards for software organization.
8. Write a note on CASE tools.
9. Explain integrated CASE environment in detail
10. Write a note on classification of CASE tools.
11. Explain work break down structure with example.
12. What is critical path? Explain with diagram.
13. What is project charter?
14. Explain Statement of Work.
15. What is activity graph? Explain with Diagram.
Q3) Attempt any FOUR of the following
Short answer questions each of 4 marks
1. Explain major software quality assurance activities.
2. Explain the tasks in project planning.
3. Write in short need of project management.
4. Write difference between ISO 9001 and CMM.
5. Write a note on Bussiness process re-engineering.
6. Explain software re-engineering process model.
7. Discuss technical problems of re-engineering.
8. Write a note on factors influencing the project management
9. What is charter plan. Explain in short.
10. Discuss different tasks in project monitoring and controlling
11. Write a note on democratic team
12. Write a note on chief programmers’ team
13. Write a note on mixed controlled team
14. Discuss about need of SCM.
15. What is change control? What are the activities done in change control?
16. Explain Configuration Audits and Review activities.
17. Write a note on the different stakeholders in project management.
18. What are the benefits of Software Quality Assurance (SQA).
19. Discuss advantages and disadvantages of CASE tools.
20. Write about any four types of CASE tool.
21. Write the steps involved in software re-engineering.
22. What is statement of work? Explain in short.
23. Write a note on project metrics.
24. Write about goals of SCM.
25. What are Steps for CASE Tool Implementation?
26. What is the activity graph? Explain with diagram.
27. Explain the activities during version controlling.
28. Explain upper CASE tools.
29. Explain the lower CASE tools.
30. What are the advantages of using CASE tools?