5c767db189d7d Easikit Operation Maintenance Manual
5c767db189d7d Easikit Operation Maintenance Manual
5c767db189d7d Easikit Operation Maintenance Manual
CONVEYORS
EASIKIT 300 EASIKIT 450
The manufacturer does not accept responsibility for any loss, damage to other equipment, injury to personnel or any other
circumstance resulting from the use of our equipment. All rights reserved. No part of this publication may be reproduced, stored in
a retrieval system, or transmitted in any form or by any means - electronic, mechanical, photocopying, recording or otherwise -
unless the permission of the publisher has been given beforehand. © All specifications are subject to change without notice
2
OPERATING INSTRUCTIONS
WARNING!
ISOLATE AND LOCK-OFF SUPPLY BEFORE INSPECTION
If you cannot lock off the power supply, unplug the conveyor from the
starter or transformer.
Visually inspect all external electrical connections.
Check for materials jammed between the belt and conveyor structure.
Check for material build up on any of the rollers or side guides.
Ensure area under and adjacent to, the loading/tail section is clear of
debris.
Check external belt scraper for tension (if fitted).
Inspect belt & clip joints for damage and wear, also check the tension
of the belt, if you find any damage to the belt or joints, inform our
service department immediately so it can be dealt with ASAP to avoid
unnecessary & expensive damage.
If the conveyor is on stands or scaffolding, check the tightness of all
bolts or scaffold clips. Clear out any debris or build-up of material from
the back and underside of the loading area (under the tail section).
Inspect the condition of the loading boot rubber skirts.
Check E-stops are operating (if fitted).
Check head guard is fitted securely (if applicable).
Check all safety hoarding is in place. (where applicable) Conveyor
must be hoarded/guarded off over any public access for its entire
length; access to any ramps/gantries should be closed during this
operation.
Any hoarding fitted should be cut to give access to the motor and
head tracking points so any necessary maintenance work can be
carried out, the underside of the hoarding should be made removable,
to allow for any clearing of material build up.
Visually check on all nuts & bolts on rollers and feed hoppers
3
Start-up procedure
Switch on electrical supply (Either by switching on the transformer or
by plugging in the power lead).
Give audible warning and check the discharge area of the conveyor
before turning on the conveyor.
Press the green start button.
Observe the operation and tracking of the belt.
(For adjusting points, see diagrams on page 5 for the type of conveyor
you are using)
Load conveyor steadily and commence operations.
REMEMBER!
YOU ARE FEEDING A MOVING BELT, SO FEED
ACCORDINGLY AND THE CONVEYOR WILL WORK
VERY WELL.
OVERLOAD AND YOU WILL CAUSE BREAKDOWNS
WHICH IN TURN WILL COST YOU MONEY.
Loading
Conveyor only to be loaded at the feed hopper or at designated
loading points.
Loading only to commence once the conveyor has been started.
Feed hoppers to be fed evenly and steadily.
When loading steeper conveyors some rollback will incur. Care must
be taken to ensure injury cannot be caused to the operator/loader by
large items coming off the end of the conveyor.
4
GENERAL MAINTENANCE
For more detailed Routine maintenance see Pages 9 – 20
Keep the conveyor clean, particularly under and around the loading section.
Belt
Check belt tension and adjust if necessary by evenly tightening
adjusting nuts situated either side of the conveyor tail section.
(See details below)
The correct tension is the minimum required to maintain drive to
the belt.
Gearbox
Lubricated for life; check oil seals on output shaft for leaks.
If the gearbox starts leaking please contact our service
department immediately.
EK300 TENSIONING &TRACKING POINTS
5
TROUBLE SHOOTING
STOP the conveyor and ISOLATE POWER SUPPLY. Check the head unit
for any build up around the head drum or rollers and clear if found. Loosen
the four locating bolts (see diagrams on page 5, do not completely undo the
nuts) and make the necessary adjustments to centralize the belt (see Fig 1
on page 8), start the conveyor and check the position of the belt and make
any final adjustments, retighten the four locating bolts and lock off the
adjusting stud.
6
Motor cuts out
ISOLATE POWER SUPPLY. Check that nothing has jammed any moving
parts, particularly behind loading back guard. Contact our service
department immediately.
Noise
If the conveyor starts to make any form of noise other than the normal
operational noise, STOP AND ISOLATE the conveyor and check for
something jamming the conveyor. If you find anything, remove it, if the noise
persists, contact our service department for assistance.
7
8
ROUTINE MAINTENANCE
Routine maintenance checks are very important in maintaining the full useful working
life of your Easikit conveyor. A regular maintenance program paying due attention to
all the components itemised in this Routine Maintenance section will reduce the
likelihood of break-down and costly downtime. Frequency of checks will depend on
conveyor usage i.e. material being handled, hours worked per day etc. Checks are
recommended at regular intervals depending on the amount of working hours that
the conveyor is being used for.
A main feature in extending the life of your conveyor is thorough cleaning at regular
intervals to prevent material build-up particularly around the feed and discharge
points (good house-keeping is essential).
WARNING!
DOWN TIME COSTS MONEY,
LOOK AFTER YOUR EASIKIT CONVEYOR!
9
ROUTINE MAINTENANCE CHECK LIST
1.1. MATERIAL HANDLING
It is very important to ensure that your conveyor is operating within its capacity. If you
are in doubt as to the capacity, please consult your conveyor supplier. Overflowing
and excessive quantities of material on the belt will lead to material build up in
unnecessary areas that will in turn cause damage to your conveyor.
1.5. ROLLERS
Intermediate top troughing rollers and return rollers will need to be checked regularly
for free rotation and any excessive wear. These have sealed for life bearings and will
need to be kept free from any material build up. Do not use thin spray lubricants (i.e.
WD-40) as these will wash out the pre-greased bearings. If external lubrication is
needed, this should be done with a spray lubricant grease (avoid any contact with the
rubber belt).
1
0
1.7. TAIL UNIT
The Tail Unit should be checked as per the maintenance schedule and visually
assessed to ensure that it is functioning correctly and that the drum is clean with no
excessive build-up of material around the drum and that it is running in the bearings
correctly. This can be accessed by removing the tail drum guard (and the hopper if
possible). Ensure that the tensioning stud bars each side are clean and operational
and that the side clamps are tightly secured. The tensioning stud bars will benefit
from a periodic light greasing with a multipurpose grease.
1.11. BEARINGS
All external bearings need to be inspected for any excessive wear and that they are
secure to the conveyor frame and in clean condition. All these bearings will need
grease lubrication regularly. The manufacturer’s recommended lubricant is a high
quality lithium based grease of 2-3 consistency. They will need to be checked as per
the maintenance schedule.
WARNING!
DO NOT OVERGREASE BEARINGS
11
1.13. BOTTOM COVERS
It is important that all bottom covers have been fitted as per the Easikit Instruction Manual
and should be checked periodically as indicated in the maintenance schedule. Remove
the bottom covers following the instructions in the Easikit Instruction Manual in reverse
order; you may not need to remove them completely as it is possible to remove only two
bolts and hinge the covers down on the two remaining bolts at the opposite end. Ensure
that all built up material is removed from the return belt area, paying particular attention to
the return rollers that support the return belt. Ensure that the cage nuts are in good
working order and inspect the covers thoroughly for any damage that may have occurred
and then re-fit the covers back into position in the reverse order. It is important that all
fixings are securely tightened after refitting the covers.
1.16. HOPPER
Inspect regularly as per the maintenance schedule to ensure that there is no material
build up in the hopper and its surrounding area. Check thoroughly that there is no
damage to the hopper. Clean and remove material as necessary. Check hopper rubbers
for wear or damage and replace if required. (These are classed as ‘wear’ items and not
covered by the manufacturer’s warranty). Ensure all fixings are secure and tightened.
1
2
1.18. SUPPORT STANDS
All support stands should be checked periodically that all fixings are tight and secure.
Inspect all supports for any damage. Replace any damaged parts as necessary.
Ensure that no extra weight loadings have been added to the support stands since
the conveyor was originally specified.
13
1.23. RADIAL CONVEYORS
Ensure the conveyor is operating correctly in its radial action and that the radial track
line is clear and free from debris etc. It is important that all linch pins are inspected to
ensure they are correctly positioned and the safety retaining pins are secure.
Remove wheel covers and inspect wheel mounting shafts and bearings for any
damage and wear. Drive shaft bearings should be greased. The manufacturer’s
recommended lubricant is a high quality lithium based grease of 2-3 consistency.
Ensure motor mounting bracket is secure and replace covers and secure fixings.
Inspect hydraulics as per Section 1.24. Radial slewing anchor bearings should be
greased when required. Tightness of Lindaptor fixings should be regularly checked
and tightened to a torque of 147Nm. (recommended every 6 months). Ensure ground
fixing anchors are still secure and tight. Visually inspect electrical wiring and
connections for any signs of damage. Any electrical maintenance work required
should be carried out by a qualified electrician.
WARNING!
ENSURE ALL COVERS & GUARDS HAVE BEEN
REPLACED PRIOR TO RE-STARTING YOUR CONVEYOR
AND THAT ALL FIXINGS ARE TIGHT & SECURE.
1.26. DOCUMENTATION
All maintenance should be documented accordingly in the section at the rear of this
Service & Maintenance Schedule.
1
4
EASIKIT ROUTINE MAINTENANCE SCHEDULE
Frequency
Item Maintenance check Weekly Monthly 3 Monthly Annual
or 60 hours or 250 hours or 750 hours or 3000 hours
1.1 Material Handling 🗸 🗸
1.2 Material Feed Points 🗸 🗸 🗸 🗸
1.3 Rubber Belt 🗸 🗸 🗸 🗸
1.4 Belt Scrapers 🗸 🗸 🗸 🗸
1.5 Rollers 🗸 🗸 🗸
1.6 Head Unit 🗸 🗸
1.7 Tail Unit 🗸 🗸
1.8 Toggle & Joint Check 🗸 🗸
1.9 Motor & Electrics 🗸 🗸 🗸 🗸
1.10 Gearbox Units 🗸
1.11 Bearings 🗸 🗸
1.12 Top Covers 🗸 🗸
1.13 Bottom Covers 🗸 🗸 🗸
1.14 Belt Tracking 🗸 🗸 🗸 🗸
1.15 Belt Tensioning 🗸 🗸
1.16 Hopper 🗸 🗸
1.17 Side Guides 🗸 🗸
1.18 Support Stands 🗸
1.19 Auto Grease Units 🗸 🗸
1.20 Motion Sensor - Visual 🗸 🗸 🗸 🗸
Motion Sensor - Manual 🗸 🗸
1.21 Emergency Grab Wires 🗸 🗸
1.22 Mobile 🗸 🗸
1.23 Radial 🗸 🗸
1.24 Mobile & Radial Hydraulics 🗸 🗸
1.25 Conveyor Washdown 🗸
1.26 Documentation 🗸 🗸 🗸
WARRANTY
It is important that the Maintenance Schedule is adhered to in order to
validate the manufacturer’s warranty.
15
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
16
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
17
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
18
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
19
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
20
SERVICE HISTORY
SERVICE TYPE
MAINTENANCE CARRIED OUT MONTHLY 3 MONTHLY ANNUAL
21