0% found this document useful (0 votes)
55 views

Process Flow Chart - Project Planning

Project management document for planning department

Uploaded by

Ravindra Vishe
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
55 views

Process Flow Chart - Project Planning

Project management document for planning department

Uploaded by

Ravindra Vishe
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

DAS OFFSHORE ENGINEERING PVT. LTD.

(OIL & GAS DIVISION)


PROCESS NAME: PROJECT PLANNING, SCHEDULING & SUB CONTRACTING
Doc. No.: PFC.PROJ.01 Rev. No.: 0, Issue No.: 1 Issue Date: 01.10.2011

Prepared by: Mr.Debashish Dewan Approved by: Mr.H.K.Pant

Activities Responsibility

*Reciept of NOA
Project Scheduling as per
*Macroplan in Primavera/MS project Project Coordinator/Project Planning Engineer
Scope & Duration

* Approval of macroplan from client Incorporate


* To attend Kick Off Meeting for Approval of project schedule
requirements/any Project Coordinator/Project Planning Engineer
finalization of the key dates & macro plan from client
corrections
project related issues

Is project schedule
No approved by client

Yes
*Approved schedule to factory for
Forward the approved schedule
preparation of structural/piping
to production planning at factory Document Controller/Base coordinator
fabrication

Finalization of sub-contractor/
*Forward Approved schedule to
outsourcing as per Project coordinator/HOD
subcontractor
(PFC. PROJ.02)

*Marking of isometric drawings


*Despatch of marked drawing at Receipt of Drawings, P&IDs
factory through transmittal in GADs & procedures from Document Controller/Project Planning Engineer
prescribed format client / consultant

Forward the Scope of


work to Quality
Base Coordinator
control department
for WPS/PQR

*Coordination with production planning Estimation of quantity of


for Material Take Off for Onshore materials as per approved Project Planning Engineer/Production Engineer
Fabrication as per scope drawings

Receipt of approved
WPS/PQR from Base Coordinator
Quality Control

* To coordinate with production To keep track record of all


planning onshore fabrication, NDT through
* To monitor the progress of onshore prescribed format of Daily Project Planning Engineer/Base coordinator
fabrication through Daily Progress progress report with Production
report Doc.No Planning

* Categoriwise & quantity wise Estimation of Categoriwise


manpower as per scope in a prescribed manpower, tools/tackles & Project Planning Engineer
format consumables as per scope
Doc.No -FM.PROJ.01

* To forward the list of tools/tackles Forward the tools/tackles &


Rectify the list as per
& consumables to store & production consumables to stores & Project Planning Engineer/Base coordinator
queries
Doc.No - FM.PROJ.02 production for availability

Are there any queries


Yes from stores /
production?

No

*Coordination with stores &


To keep track record for packing
material department
*Finalization of list from site of tools/tackles & Project Planning Engineer/Base coordinator
*Finalization of list
Incharge/Project Incharge consumables for Offshore site

* Correspondance from client for Mobilization of Manpower and


mobilization Approved / Final list of Materials
tools/tackles & consumables and Project Planning Engineer/Base coordinator
*List of approved manpower from HR & Manpower
drawings/documents
department

*To maintain Daily Progress report in


project specific format
Receipt of manpower & materials
at offsfore site & to keep the
*To communicate with offshore To keep record of Offshore
record of manpower by
Planning & client on daily basis activities as per approved macro Base coordinator
administrator and materials by
*To maintain S-curve as per daily plan
material coordinator as per
progress Doc.NoFM.PROJ.03
(PFC.PROJ.03)
* To maintain records of welding
defects Doc.NoFM.PROJ.04

Re-schedule macro Is Offshore execution


schedule as per activities as per macro plan Project Planning Engineer
No
actual start (Refer PFC.PROJ.04

Yes

* Manpower requirement at Admin *Despatch of drawings &


*Project material requirement to client To forward the requirement of documents to offshore through
or material department manpower, materials & drawings transmittal in a project specific Base Coordinator
*Tools/tackles & consumables from Offshore site to specific format
requirement to stores department *Communication with specific
department

To prepare customer complaints


To get Completion certificates &
* Coordination with offshore planning & report Project Planning Engineer/Base coordinator
punch points/balance activities
client to get the certificates (Refer PFC.PROJ.05)
Demobilization of manpower Raise Invoice to client's finance
Base coordinator/Project Planning Engineer
& materials department for Billing
DAS OFFSHORE ENGINEERING PVT. LTD. (OIL & GAS DIVISION)
PROCESS NAME: SUB CONTRACTING & OUTSOURCING
Doc. No.: PFC.PROJ.02 Rev. No.: 0, Issue No.: 1 Issue Date: 01.10.2011

Prepared by: Mr.Debashish Dewan Approved by: Mr.H.K.Pant

Activities Responsibility

Search Supplier / Vendor on


Internet OR Receive Telephonic, Fax, Email
Project Coordinator/Project Planning Engineer
introduction/ company profile communication to the supplier
for required job/material

Review received details from Email, introduction letter,


Project Coordinator/Project Planning Engineer
supplier / Vendor company profile

Send Supplier / Vendor Supplier registration form


Registration Form (FM.PUR.01)
Base coordinator

Received filled Supplier / Vendor


registration form

Filled in supplier
registration form
(FM.PUR.01)

Send back form for filling Are all required details


Document Controller/Base coordinator
correct details available / filled properly?
No

Yes

1. Check & scrunity form &


corresponding documents
Document Controller/Project Planning Engineer
submitted by supplier / Vendor
2. Check references provided

Forward the form for approval


after scrutiny, to the approving Project Planning Engineer/Production Engineer
authority

Approval of Registration Approved Registration Form Project Coordinator

Approved vendor's Enter name of supplier / vendor


Approved vendor's list Project Coordinator / Project Planning Engineer
registration form in approved vendor's list
DAS OFFSHORE ENGINEERING PVT. LTD. (OIL & GAS DIVISION)
PROCESS NAME: RECEIPT OF MANPOWER & MATERIAL AT OFFSHORE SITE
Doc. No.: PFC.PROJ.03 Rev. No.: 0, Issue No.: 1 Issue Date: 01.10.2011

Prepared by: Mr.Debashish Dewan Approved by: Mr.H.K.Pant

Activities Responsibility

Materials & Manpower sent from


base to location at offshore

Unloading of materials OR
transfering of manpower from Material coordinator / Administrator / Riggers
boat/vessel to barge/platform

Balance materials & Head counting & checking of


Checking of materials as per
manpower again sent from NED passes of manpower as Material coordinator / Administrator
manifest
base per manifest

Send the reminder of the


requirement for balance Are materials / mapower as per
Offshore Planning Engineer
materials & manpower to requirement?
base NO

YES

Offer visual inspection of Safety induction to all incoming


QA/QC Engineer / Safety Officer
incoming project materials to TPI crew onboard barge/platform

Segregation of incoming Allotment of rooms/cabins to


materials for execution activities incoming manpower as per Material coordinator / Administrator
after the visual inspection by TPI accomodation availability

Convey the message for arrival of


manpower & receipt of materials Offshore planning Engineer
to Base
DAS OFFSHORE ENGINEERING PVT. LTD. (OIL & GAS DIVISION)
PROCESS NAME: EXECUTION ACTIVITIES AT OFFSHORE SITE
Doc. No.: PFC.PROJ.04 Rev. No.: 0, Issue No.: 1 Issue Date: 01.10.2011

Prepared by: Mr.Debashish Dewan Approved by: Mr.H.K.Pant

Activities Responsibility

Pre-construction survey as per


AFC Project Incharge / Offshore Planning Engineer / QA-
QC Engineer

Preparation of preconstruction
survey report and to get Offshore Planning Engineer / Project Incharge
approved from TPI

Briefing of scope of work to all


Project Incharge / Supervisors
supervisors & workers

Starting of execution activities as


per scope at all designated Supervisors
location

To send correspondance,
communicate with base
coordinator and to send Daily Offshore Planning Engineer
Progress Report to give day to
day progress status of work

Additional activities to be
Are there any additional work to Offshore planning Engineer /
discussed & approved by client /
be executed out of scope Quality control Engineer
TPI / certifying authority
YES

NO

The additional work to be


executed as per scope decided Offer Fit-up & weld visual to TPI Offshore planning Engineer /
and inspection of fit-up & for the activities as per AFC Quality control Engineer
welding by TPI

As-Bulits drawing to be prepared


which are carried out of scope Inspection of NDT / Radiography
Quality control Engineer / CAD operator
and to be approved by client / to TPI for approval
TPI

Hydrotesting for piping to be


carried out under witnessing of Quality control Engineer / Supervisors
TPI / certifying authority

Certfying of all inspection


reports / NDT reports /
Quality control Engineer
hydrotesting report from TPI OR
certifying authority

Final inspection of work executed


As built to be prepared in case
with TPI / client and preparation Offshore planning Engineer /
of additional work and to get it
of post construction survey report Quality control Engineer
approved from client / TPI
and to get iot approved

Carry out the work as suggested Are there any scope left that to Offshore planning Engineer /
by client / TPI be executed? Quality control Engineer

YES

NO

Preparation of punch point list if


Offshore planning Engineer /
any and to get completion report
Quality control Engineer /
of particular platform from client

Forward the approved punch


point list & approved completion Offshore Planning Engineer
certificate to base
DAS OFFSHORE ENGINEERING PVT. LTD. (OIL & GAS DIVISION)
PROCESS NAME: CUSTOMER COMPLAINTS
Doc. No.: PFC.PROJ.05 Rev. No.: 0, Issue No.: 1 Issue Date: 01.10.2011

Prepared by: Mr.Debashish Dewan Approved by: Mr.H.K.Pant

Activities Responsibility

To prepare complaints reports


Project Coordinator / Project Planning Engineer
from client / customer

Feed back form


Forward the feed back form to
Doc.No- Base coordinator / Project Planning Engineer
client / customer
FM.PROJ.05

To take action according to the


Project Coordinator / Project Planning Engineer
feed back given by customer

In case of positive In case of negative feed


feed back back / complaints

To forward the requirement


to the respective
To maintain the
departments for
quality & procedures Base coordinator / Project Planning Engineer
implementation of the
of work
revised pattern, duties &
responsibilities

To fulfill the requirement of


the customers as per the
Project Planning Engineer / All Departments
project specific standards &
procedures
NO

Are all complaints / requirements


attended OR rectified by
respective departments?

YES

To work according to the revised


procedures and to get positive All Departments
feed back from customer / client
DAS OFFSHORE ENGG.PVT.LTD
ORGANIZATION CHART
DEPARTMENT - PROJECT / PLANNING

MR.CHANCHAL SAHA
(GGM)
PROJECT MANAGER

MR.H.K.PANT
(DGM-PLNG)
PROJECT COORDINATOR

PIPING MODIFICATION MAINTENANCE OF PIGGING CLEANING & HYDROTESTING OF 26


AT SHG/SHP FACILITIES SEPERATORS & SURGE TANKS

ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE

MR.ADITYA PAWAR MR.SREEJITH.S MR.DEBASHISH DEWAN PRODUCTION I/C MR.B.MOHAPATRA MR.DEBASHISH DEWAN PRODUCTION I/C MR.S.K.UPADHAYA
OFFSHORE I/C
PLANNING ENGR PRODUCTION I/C PLANNING ENGR (NR) OFFSHORE I/C PLANNING ENGR (NR) OFFSHORE I/C

MR.DINESH PATRE MR.TYAGI NAIDU MR.RAVINDRA VISHE PLANNING ENGR PLANNING ENGR MR.RAVINDRA VISHE PLANNING ENGR PLANNING ENGR
PLANNING ENGR
PLANNING ENGR PLANNING ENGR PLANNING ENGR (NR) (NR) PLANNING ENGR (NR) (NR)

MR.VINAYAK JADHAV SUPERVISORS SUPERVISORS MR.SAMEER BANE SUPERVISOR SUPERVISOR MR.ANANT PANGUL SUPERVISOR MR.YATHARTH JOSHI
PLANNING ENGR (AS REQD) (AS REQD) CAD OPTR (NR) (NR) JR.ENGINEER (NR) SUPERVISOR

MR.ANANT PANGUL MR.ANANT PANGUL WORKMEN MS DIPTI KOTANGLE WORKMEN


WORKMEN WORKMEN WORKMEN WORKMEN
JR.ENGINEER JR.ENGINEER (NR) BASE COORDINATOR (NR)

MS DIPTI KOTANGLE MS DIPTI KOTANGLE MR.SAMEER BANE


BASE COORDINATOR BASE COORDINATOR CAD OPTR

MR.DEEPAK PATIL
CAD OPTR
DAS OFFSHORE ENGG.PVT.LTD
ORGANIZATION CHART
DEPARTMENT - PROJECT / PLANNING

GGM
PROJECT MANAGER

DGM-PLNG
PROJECT COORDINATOR

PIPING MODIFICATION MAINTENANCE OF PIGGING CLEANING & HYDROTESTING OF 26


AT SHG/SHP FACILITIES SEPERATORS & SURGE TANKS

ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE ONSHORE (H.O) ONSHORE (FACTORY) OFFSHORE

PRODUCTION I/C PRODUCTION I/C


OFFSHORE I/C
PLANNING ENGR PRODUCTION I/C PLANNING ENGR (NR) OFFSHORE I/C PLANNING ENGR (NR) OFFSHORE I/C

PLANNING ENGR PLANNING ENGR PLANNING ENGR PLANNING ENGR


PLANNING ENGR
PLANNING ENGR PLANNING ENGR PLANNING ENGR (NR) (NR) PLANNING ENGR (NR) (NR)

SUPERVISORS SUPERVISORS SUPERVISOR SUPERVISOR SUPERVISOR


PLANNING ENGR (AS REQD) (AS REQD) CAD OPTR (NR) (NR) JR.ENGINEER (NR) SUPERVISOR

WORKMEN WORKMEN
WORKMEN WORKMEN WORKMEN WORKMEN
JR.ENGINEER JR.ENGINEER (NR) BASE COORDINATOR (NR)

BASE COORDINATOR BASE COORDINATOR CAD OPTR

CAD OPTR