Solar PV Modules Loading On Roof Top: Project: Seaworld Abu Dhabi - 8.368Mwp Solar PV Project Operation

The document provides a safe operating procedure for loading solar PV modules onto a roof. It describes potential hazards, required personal protective equipment, and safety steps to take before, during, and after the loading process. The procedure involves using a mobile crane or forklift and outlines numerous safety precautions for the lifting and loading activities.

Uploaded by

Karimo Kilani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views3 pages

Solar PV Modules Loading On Roof Top: Project: Seaworld Abu Dhabi - 8.368Mwp Solar PV Project Operation

The document provides a safe operating procedure for loading solar PV modules onto a roof. It describes potential hazards, required personal protective equipment, and safety steps to take before, during, and after the loading process. The procedure involves using a mobile crane or forklift and outlines numerous safety precautions for the lifting and loading activities.

Uploaded by

Karimo Kilani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Project: SEAWORLD ABU DHABI –8.

368MWp SOLAR PV PROJECT


SOP- Safe Operating Procedure
NOTE: DO NOT use this machine/equipment unless you have been trained in its safe use and
operation

Description of Work: SOLAR PV MODULES LOADING ON ROOF TOP


Potential Hazards Hazard
• Unloading of material from vehicles
• Reversing vehicles
• Walking/working under suspended load.
• Unauthorized entry to exclusion zone around
crane and swing radius.
• Unsafe lifting technique.
• Material falling from height.
Consequences
• Fatality or serious injury
• Property damage

Personal Protective Equipment (PPE) Required (Check the box for required PPE):

Gloves Face Masks Eye Welding Appropriate Hearing Protective


Protection Mask Footwear Protection Clothing

Safe Work Procedure Checklist:


1. PRE-Operation/Task: • Operatives must complete project HSE +WW inductions
• All should have their medical insurance cards & Emirates ID with them.
• All should enter to the site with the Mandatory & Job specific PPEs. Refer their Mandatory PPE &
Job specific PPE in the Method statement.
• DSTI to be conducted by supervisor near to the work spot prior to start any activity.
• Supervisor & workers should visually inspect their work area, equipment, plants, materials etc. prior
to start their activity.
• Ensure that all tools have been inspected and color coded/tagged to ensure that the plant
department inspected them prior to issue
• Guide the movement of delivery vehicles and control operatives.
• Unauthorized persons not allowed in work area
• Barricade the work area, communicate to the nearby activities and watch for any moving
machineries at the work spot.
• Ensure safe access/egress into & out of the area
• Ensure effective lighting requirements installed. Min 50 Lux

Last Updated: 31 January 2023



2. Operation/Task Loading/Unloading using mobile crane (if the units do not come with wooden pallets)
• Necessary legal documents must be obtained and in place prior to lifting.
• Ensure that the trailer is parked on a flat surface before starting to offload
• Material should not be dropped on the ground strongly which may lead to material damage
• A proper lifting plan must be designed and communicated to all personnel engaged in the lifting
operation.
• Lifting shall be done through the lifting eyes on top side of the SOLAR PV MODULES.
• Ensure suitable straps to hold the load are available and these should be hanged through the lifting
eye on the top side of the SOLAR PV MODULES.
• All the employees must attend site safety induction prior to enter the site.
• Ensure Valid PTW is available from Contractor prior to start the work.
• Approved MSRA Should be communicated to the workforce.
• All the artisans must be wearing mandatory Personal Protective Equipment’s.
• Ensure all third-party certificates for the Equipment’s/operator & lifting gears are valid.
• Ensure testing agency used for lifting equipment must be certified by the EIAC
• Rigging should be done by competent Rigger only.
• The load(s) must be inspected by the operator/rigger to confirm that the load is evenly distribute on
the spreader bar and adequately secured.
• Ensure vehicles and equipment’s are inspected prior to use.
• Assign flagman for vehicles & machineries.
• Make sure lifting area is properly barricaded with signages to avoid unauthorized entry and
monitored by concerned person.
• position the trailer in a location that is as level as possible and chock the wheels.
• Ensure the ground condition is sound enough prior to fix the crane outrigger.
• Ensure specific training on manual handling methods given to the employees and advise to follow
the manual lifting procedures.
• Provide and ensure Mandatory PPE being used by the involved employees
• Spreader bars should be inspected and certified by 3rd party approved by EIAC.
• No person will place themselves between the load and the trailer/lifting equipment or any other
pinch point locations that may arise while loading/offloading.
• Work must be performed in presence of concerned Supervision staffs/Appointed lifting in charge.
• Ensure offloading area is level and clear and well lit
• Access should be free from obstruction
• Ensure adequate illumination, signage and barricading in the storage area.
• Ensure barricading is in place around the lifting zone and the loading area.
• Placement of banksman to deter workers and unessential personnel from entering the lifting zone,
the loading and unloading area and/or walking under suspended load.
• Maintain proper housekeeping in the material storage area and in the offloading area.
• Never stand under the suspended load.
• Ensure Enough taglines shall be used to control the movement of the load.

Form name goes here


• Always follow the instructions from the rigger during the lifting.
• The straps should be utilized to keep the remaining load secure in place, as well as, a means to
support the pipe/cylindrical stock to prevent rolling.

Using forklift (if materials come with pallets)


• Competent operators to be engaged with 3rd party test certificate to operate boom loader Operators
not to exceed safe operating speeds.
• Loads must never obstruct the view of the operator.
• Forklift operator must be third party certified.
• Forklift operator and drivers to follow site safety requirements, i.e. adhering to site speed limits.
• Trained flagman to be engaged for directing the operator. All persons to stand clear of loads being
loaded or unloaded.
• Daily pre-start and weekly inspections of forklift. Planned maintenance schedules implemented and
adhered too.
• All persons to stand clear of loads being loaded or unloaded.
• Mobile plant and vehicles to be fitted with acoustic reverse alarms.
• No persons to stand underneath or close to suspended loads.
• SWL needs to be displayed.
• Proper communication between banksman/operator by means of radios or hand signals.

3. POST-Operation/Task:

 Waste to be regularly removed from site.

Competent Person(s)-The following persons are authorised to operate, supervise and test students on the equipment
/process)

Name: Title: Contact Details:


KARIM KILANI HSE MANGER OO971562788713

Form name goes here