Document No.

: FABS-001-FO-0016
JOB SAFETY AND ENVIRONMENT ANALYSIS Revision : 01
Effective Date : 1 Januari 2018

PROJECT : LOCATION OF WORK : Analysis By : DATE :…………………


WBA PU Project worshop 5-Nov-18
Reviewed By :
JSA NO……………….
Approved By :

SEQUENCE OF BASIC JOB STEPS POTENTIAL HAZARD RECOMMENDED ACTION OR PROCEDURE WHO
List in sequence the main steps required to perform List for each step the specific hazard that could be List for each hazard the specific controls that are required to allow
present when the step is carried out,some steps may the job to be performed to an acceptable level,as low as How control effectiveness will be
the job,from start to finish monitored
have more than one hazard reasonably Practicable (ALARP)
Pemotongan Pipa CIP dengan gerinda Fisik Eliminasi
- Bagian wajah & tubuh terkena percikan gerinda -
- Jari terpotong piringan Gerinda Subtitusi
- Tersengat aliran listrik Menggunalkan alat potong manual Worker, HSE, Mechanical
- Tersandung kabel power gerinda
- Tangan keram akibat getaran dari mesin gerinda Engineering Kontrol
- kebisingan - Memasang guard pada piringan gerinda
- Menggantung kabel power (tidak dilantai) Worker, HSE, Mechanical
Ergonomi - Memasang fire blanket di sekitar lokasi penggerindaan
- Bekerja dengan posisi berdiri terlalu lama - Menyediakan apar di lokasi penggerindaan
- Mengangkat dengan posisi salah KONTROL ADMINISTRASI
- Pemasangan rambu-rambu keselamatan yang sesuai Worker, HSE
- Gerinda telah di taging & layak pakai
Lingkungan
-Paparan debu
-Serpihan gram potongan,sisa mata gerinda Alat Pelindung Diri Worker, HSE
-Kebakaran - Helmet safety -Safety Vest
- Sepatu Safety - Masker
-Sarung tangan - face shield
-Safety apron - Pakaian lengan panjang
-Ear Plug