0% found this document useful (0 votes)
23 views15 pages

RAHIEL

Uploaded by

tekileeyasu7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views15 pages

RAHIEL

Uploaded by

tekileeyasu7
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 15

NAME EYASU TEKLE

ID NO.
CVE/WE/034/11
COLLEGE
PROJECT OF
NAME
QUANTITY
ENGINEERING
SURVEYING

1
DEPARTMENT OF
CIVIL ENGINEERING

2
SITE PLAN

3
FLOOR PLAN

4
FRONT ELEVATION

5
RARE ELEVATION

6
RIGHT SIDE

LEFT SIDE

7
8
Project Name: Residential House

Client: Eyasu Tekile

Contractor: Endale Libyos

Consultant: Grum Desta

Take off sheet of the project


LWH Description
A Sub Structure
1. Earth Work
*Site Excavation

Total area of site excavated to an average depth of 25


cm
*Trench Excavation
[3/3.4+5.4+3/2.5]+[8.5+3/2.2+2+2/2.5]
7.5m =45.2m 3
8.5m *Back fill
63.75m 2

Total Volume Of Backfill including The Column


0.40 *Cart Away
1.50 C.A=T.S-T.F
15 1.20 =(45.2-10.8)
10.8 M 3 C.A=34.4m 3
Total Volume Of Soil To Be Disposed Off

2 Stone Work
34.4m 3 *Hard Core

9
B- Super structure
*Concrete Work

#Column
0.20m
0.20m
15 3.00m Total Volume Of Concrete For Columns
1.8m 3 *Tie Beams
#Length of the Tie Beam
L=4.9+3/2.1 + 2/3.4
L=18m

18m
0.20m Total Volume Of Concrete For The Tie Beam.
0.20m 2. Masonry Work
0.72m 3 2.1 20cm HCB Wall

28.2m
3.00m
84.6m 2 Area Of Boundary wall

1.20m
2.00m
2.4m 2 Ddt. for door.1(Main entrance door).

0.8m
2.00m
Ddt.for door-2 (Rare door).
1.6m 2
1.00m
1.00m
1.0m 2 Ddt.for Left side window.

0.8m
1.0m
0.8m 2 Ddt.for front side window

2 0.60m
0.60m
0.72m 2

10
Ddt.for right side window

0.6m
1.00m
2 1.2m 2 Ddt.for rare side window.
76.88m 2 Total area of 20cm HCB.
2.1 15cm HCB wall.
L=length of 15 cm HCB
L=2.2x2+2+2.5+2.5+1.3+2+1.2+1.1+1.1
L=18.1m

18.10m
3.00m
54.3m 2
1Total Area of wall(partition wall).
0.60m
0.80m
0.48m 2 Ddt.for Toilet door.

1.00m
1.50m
4
6m 2 Total Ddt.for partition door.
47.82m 2 Total area of 15cm HCB for partition wall
3-Roof work

0.80m L

9.00m
L=actual length of the roof
L=√ 92 +0.82
L=9.04m
9.04m
7.50m
67.7m 2
62.64m 2 Total area of roof covering.
4- Floor Finish
2.40m
2.20m
5.28m 2 Area of floor finish for bed room.

2.40m
2.00m

11
4.8m 2 Area of floor finish for kitchen.

3.50m
5.10m
17.85m 2
Area of floor finish for living room.
3.17m
2.90m
9.20m 2 Area of floor finish for master bedroom
2.17m
1.20m
2.6m 2
Area of floor finish for toilet
2.17m
1.80m
3.9m 2
5.30m
1.20m

6.36m 2 Area of floor finish for corridor .
49.9m 2 Total area of floor finish for rooms .
5−ceiling

7.10m
8.10m Areaof ceiling .
57.51m 2
2.05m
2.50m
5.13m 2 Ddt.ceiling for partition walls.
2.47m 2 Total area of ceiling.
49.91m 2 6-Plastering
6.1-Internal plastering
L=Internal perimeter of the room
=60.36m

60.32m
3.00m Internal area of the wall.
2
180.96m
0.60m
0.80m Ddt.for toilet door.
0.48m 2
1.00m
4
1.50m
Total Ddt.for partition door.
6m 2 Total area of internal plastering.
174.48m 2

12
6.2- External Plastering
A. Columns
L=10/0.2+6/0.2
L=3.2m
3.20m
3.00m
Area of plastering to columns
9.60m 2
B. Tie beams
L=18m, L-length of tea beam

18m
0.30m

5.40m 2
Ddt. But to tea beams.
7.72m 2
Ddt. For four side window and door

28.20m
3.00m
84.6m 2 Area of external plastering
2
61.88m
Total area of external plastering

Bar schedule of residential house project


Item position Diameter(mm) shape Numbe Number Length 6 8 10 12 14 16
r of of
bars members

Column 12 C 12 6 6 3 150.00

12 stirrup 6 6 6 1.00 560

6 C 14 4 2 3 - - - - 45

6 stirrup 6 13 0.90 - - - - - - -

13
BOQ of the residential house of the project

Item Description Unit QYT Rate Amount

A – Sub structure
1. Excavation and Earth work
1

1.1 *Clearing of the site to remove m


2
63.75m 2 45 2868.75
and other rubbish materials to an
average depth of 25cm
1.2 *Trench excavation m
3
45.20m 3 60 2712
1.3 *Cart away excavated material m
3
34.40m 3 62.50 2150
1.1 B. super structure m
3
1.80m 3 985.00 1773
1. Concrete work
*. Column
1.2 * Tie Beam m
3
0.72m 3 980.00 705.6
2.1 2. Masonry Work m
2
84.60m 2 60.00 60912
20cm HCB wall
2.2 Ddt for doors windows m
2
7.72m 2 38 293.36
2.3 1cm HCB wall m
2
54.30m 2 58.50 3176.55
2.4 Ddt for partition door m
2
6.48m 2 36.50 236.52
3 . Roof work
3.1 Roof cover in GGA-500,0.5mm m
2
62.64m 2 750 46980
thick fixed
4 . Finishing
4.1 *Total area of floor finish m
2
49.90m 2 828.00 41317.2
5 . Ceiling
5.1 * Total area of ceiling m
2
57.51m 2 680 39106.8
6- Plastering
6.1 *Total area of external and m
2
236.36m 2 280 66,180.8
internal plastering
7. Metal work
7.1 a- D1 size . 1.20x2.00m m
2
2.40m 2 3500 8400.00
Main entrance door
7.2 b- D2,D3,D4, 1.20x1.00 m
2
3.60m 2 3500 12600.00
7.3 c- D5 size 0.8x2.00 m
2
1.60m 2 3500 5600.00
Left side door
7.4 d- D6 size 0.6x0.8 m
2
0.48m 2 3500 1680.00
Toilet door
7.5 e- D1 1.00x0.800 front side m
2
0.80m 2 3250 2600.00
window
7.6 f- D2,D3,D4,D5 size 0.600m m
2
1.92m 2 3500 6720.00
x0.800m
7.7 g- D6 size 1.00x1.00m Left side m
2
1.00m 2 3500 3500.00 14
window
Total carried to summary birr=309,511.78 birr