This month, our attempt is once again on the continuation the technical note to abnormal behavior of Power
of the subject on TRANSFORMER’s Abnormal situation. Transformers.
Transformer, the only compact electro-mechanical
We urge all our esteem readers to please share
device helps to connect two different voltage level
your suggestion and feedback, which shall be the
systems. Reliability of the electrical system depends
motivational factor to improve in further.
upon the healthiness of this device, as because, any
eventuality on this device delinks the electrical network
dragging the situation towards instability and possible Mismatch of Oil Level
way to blackout scenario also. At one of AUTO TRANSFORMER, 160 MVA,
First NINE parts of this series had been published 220/132 KV, it was observed with mismatch
during February 2021, March 2021, April 2021, May of oil level between POLG and MOLG during
2021, June 2021, July 2021 August 2021, September service condition.
2021, October 2021, November 2021 and January
2022 with response of readers on this subject being in Observations
exponential trend. 1. This transformer was equipped with AIR CELL in
the conservator tank.
On the basis of the positive response and suggestive
feedback from the readers, we have considered the 2. The POLG (Prismatic Oil Level Gauge) was of
continuation of this series with few other case studies showing FULL OIL through the prismatic glass.
in this month. These studies shall be the continuation (Refer Fig 2.1.1)
of the last month’s technical case study series on 3. But the MOLG (Magnetic Oil Level Gauge) was
70 February 2022
Events and Eventualties
Fig 2.1.1 Empty showing Fig 2.1.2 Full showing Fig 2.1.3 Defective Link )LJ )XOO\ LQÁDWHG
on MOLG on POLG With Rod AIR-CELL
February 2022 71
Events and Eventualties
72 February 2022
cWTaXVWcRW^XRT
30+ years of serving Electrical Industry
Publication Date 1st working day of the month of the issue
Cover Pages 210 GSM Art Paper *
ǁŝƚŚǁŝĚĞƌĂŶŐĞŽĨdŚĞƌŵŽƉůĂƐƟĐƐ
Inside Pages 70 GSM LWC Paper *
Magazine Size A - 4, 297 mm x 210 mm
*XMDUDW*XUJDRQ3XQH%DQJDORUH&RLPEDWRUH
Insert 305 mm x 215 mm 88,000
3K:KDWV$SS
Appointments: Rates for 4 colours
and non bleed &RQWDFWLQIR#IRUPXODWHGSRO\PHUVFRP
Full Page 210 mm x 165 mm 27,500
Half Page 100 mm x 165 mm 13,200
([WUD&KDUJHV
Full Bleed : 20 % Extra
6SHFL¿FSRVLWLRQ ([WUD RWKHUWKDQSDJHQXPEHUV
PHQWLRQHGDERYH
6SHFLDO&RORXU 5VIRUHYHU\VSHFLDOFRORXU
6HULHV'LVFRXQWV
$SSOLFDEOHRQWKHEDVLVRIQXPEHURIDGYHUWLVHPHQWVUHOHDVHGLQ
PRQWKSHULRGFRXQWHGIURP¿UVWUHOHDVH6HULHV'LVFRXQWQRW
DSSOLFDEOHIRUFRYHUSDJHV
)RURUPRUHUHOHDVHVGLVFRXQW
FORMULATE YOUR SUCCESS with FORMULATED POLYMERS™
)RURUPRUHUHOHDVHVGLVFRXQW
ZZZIRUPXODWHGSRO\PHUVFRP
6XEMHFWWRFKDQJHDWWKHVROHGLVFUHWLRQRI3XEOLVKHUZLWKRXWQRWLFH
February 2022 73
Events and Eventualties
74 February 2022
Events and Eventualties
February 2022 75
Events and Eventualties
Rtu Cable Terminal Blowing Of Dcdb Fuses Burning Of Modem Router Box
76 February 2022
Events and Eventualties
1RZ WKH UHÁHFWLRQ RI WKLV YROWDJH RQ WKH /7 VLGH 6WDU Re-Occurrence of the Incident on Same Day
connected) became prominent due to the weak and 'XULQJÀUVWLQFLGHQWRQRIWKH*,(DUWK:LUHVRXW
separate Earth connection. The Individual voltage on of 2 nos from DISCOM DP Structure were being
the healthy R and Y phases became very high causing in damaged condition, not noticed properly as the
the failure and damage of the items as described above. string was damaged at the bottom point as like
The other reason of Failure is also that rushing of fault VKRZQLQÀJXUH
current at different weak elements (Like GPS UNITs, 2. The system was charged from Grid end to avail Aux
MODEMS, Electronics Relay etc..) to Source Ground AC supply from the Station transformer at the grid
premises along with other 2 Nos of Transformers
Recommended Solutions at REMOTE END premises. The LT loads were not
1. Provision at REMOTE ENDTRANSFORMER extended to the system.
PREMISES 3 The incident repeated coincidentally at the time of
a. Provision of Earth Mat with CONTOUR EARTH extension low light load from the ACDB board.
ELECTRODES at 6 mtr inter electrode distance, 4. Accidentally the damaged Earth GI wire slides
considering poor Soil resistivity 6 mtr pipe down touching the same B phase conductor
Electrode with Chemical Earthing is preferable. UHVXOWLQJ ZLWK ÁDVK RYHU DW WKH VSRW DQG WRWDO
E 6SHFLÀF(DUWK3LWIRU7UDQVIRUPHUVDQGRWKHU damage of GI earth wire.
structures used at this premises as per IS. 7KLVWLPHWKHIDXOWFXUUHQWRQ*5,'VLGHZDVUHÁHFWHG
F 5HFWLÀFDWLRQ RI WKH '3 VWUXFWXUHV ZLWK with 8 Kamp, causing with outage of both 33 KV
replacement of insulators, defunct/ non- side of Power Transformers and simultaneously
available LAs. the 33 KV VCB of Station Transformer Bay from
Grid end.
d. Renovation/Replacement of the ACDB with
proper SFU (Switch gear Fusing Unit). 6. But this time only it was found with FLASH OVER of
the MODEM ROUTER BOX at GRID PREMISES.
e. Arrangement protection scheme should also be
done. RE-OCCURRENCE OF THE FAULT was re-analysed
and again it was emphasized on the strengthen of
f. This Mat must be connected to GRID EARTH REMOTE ENDAREA EARTH SYSTEM.
MAT to avoid GPR.
2. Earthing connection to All LT board panels, CRPs, Conclusion
DCDBs, Chargers etc.. must be re-checked Proper Earthing need to be done with Relay gradation
regarding its Earth Connection and connection to and renovation of the Discom Structures At Remote
Mat.
Endtransformer Premises
3. The relay setting and CTR available to be re-visited (Continued to Next Month)
and re-set as per system requirement.
Er. P.K. Pattanaik:
4. Voltage Relay, available at the Battery charger to GM (Elect), at Odisha Power Transmission
be revisited and set with OV of 110 % and UV of 85 Corporation Ltd. – Odisha.
% with time delay of 1 sec.