TECHNICAL INFORMATION

Useful Information for Civil Engineer

Revision 1: 01 Jan 2006


Revision 2: 20 Feb, 4 Aug 2006

Disclaimer:
-----------
Nathan Madutujuh, ESRC or PT AMCK does not responsible for any damage or loss
due to the use of any information from this program.

A. LOADING

1. Material Weight

Reinforced Concrete = 2500 kg/m3


Plain Concrete = 2100 kg/m3
Steel = 7850 kg/m3
Cement = 1650 kg/m3 (compacted)
Cement = 830 kg/m3 (loose powder at silo)
Sand = 1800 kg/m3
Fill Earth = 2000 kg/m3
Brick wall 15cm = 250 kg/m2
Aerated Concrete Wall = 600 kg/m3
Mortar = 2000 kg/m3
Ceiling = 20 kg/m2
Granite tile = 2600 kg/m3
Aggregate = 1450 kg/m3
Sand stone = 1850 kg/m3
Boulder stone = 1800 kg/m3
Water = 1000 kg/m3
Glass = 2500 kg/m3

Partition wall = 50 kg/m2


Hotmix = 2200 kg/m3
Ceramic tile + purlin = 50 kg/m2
Metal sheet roof tile = 10 kg/m2

In-situ Coal Density (Compacted):


Batubara (Coal) = 1300-1400 kg/m3
Batubara (Coal) = 1250-2200 kg/m3
Batubara (Bituminous) = 1250 kg/m3
Batubara (Lignit) = 1500 kg/m3
Batubara (Antrasit) = 1500 kg/m3
Batubara (Grafit) = 2200 kg/m3

Batubara (Coal), crushed, uncompacted = 1000 kg/m3

2. Dead Load

Warehouse = 2500 kg/m2


Archive = 800 kg/m2
Roof + M&E = 500 kg/m2

3. Live Load

Schools = 200 kg/m2


Library = 300 kg/m2 (Reading)
Library = 600 kg/m2 (Stack Room)
Hospitals Room = 200 kg/m2 (Room)
Hospitals Lab = 500 kg/m2 (Laboratory)
Apartment = 200 kg/m2
Balcony = 300 kg/m2
Corridor, stair = 480 kg/m2 (ASCE-7)
Reviewing Stands = 500 kg/m2
Restroom = 250 kg/m2
Office = 250 kg/m2
Computer Lab = 500 kg/m2
Stores, Retail = 500 kg/m2
Theatre = 250 kg/m2
Theatre = 500 kg/m2 (Moveable seats)
Theatre = 600 kg/m2 (Stage Area, Warehouse)
Toilet = 250 kg/m2
Roof, No Access = 100 kg/m2
Roof Deck = 250 kg/m2
Roof + M/E = 500 kg/m2 (No Roof Tank)
Heavy parking = 800 kg/m2
Light parking = 400 kg/m2
Garages = 400 kg/m2 (Storage, repair)
Garages = 250 kg/m2 (Private cars)
Manufacturing = 400 kg/m2 (Light)
Manufacturing = 600 kg/m2 (Heavy)
Printing Plant = 750 kg/m2 (Machine)
Printing Plant = 500 kg/m2 (Office)
Storage = 200 kg/m2 (Residential)
Storage = 600 kg/m2 (Light)
Storage = 1200 kg/m2 (Heavy)
Pedestrian Bridges / Walkways = 500 kg/m2
Sidewalks and driveways = 1200 kg/m2

Impact Factor = 1.4-2.0

4. Live Load Reduction Factor :

Room Function Beam and Slab Frame and Girder Mass


Calculation
Office, Apartment 1.0 0.9 0.3
Garage, Parking 1.0 0.9 0.5
Warehouse, Library 1.0 1.0 0.8

Beban air hujan: Jakarta, Indonesia

Rata-rata selama 1981-2010, Ekstrim utk thn 2012

Curah Hujan per bulan (Jabar) : Rata-rata = 290 mm/bln, Ekstrim (2012)
= 700 mm/bln
Jumlah hari hujan per bulan : Rata-rata = 7-24 hr/bln, Ekstrim (2012)
= 2-30 hr/bln

5. Column Axial, Live Load Reduction Factor due to Accumulated Floors above

Number of floors above Live Load Reduction (Accumulated)


1 1.0
2 1.0
3 0.90
4 0.80
5 0.70
6 0.60
7 0.50
>= 8 0.40

6. Allowable Deflection

Live Load Only : L/360


DL + LL : L/240

B. CONCRETE STRUCTURES

1. Preliminary Design

Height to width Ratio for Highrise Building

H/B < 5-9

-------------------------------------------
Building Type Material Max Floor
-------------------------------------------
Load Bearing Brick wall 4
-------------------------------------------
Rigid Frame Concrete 20
Shearwall Concrete 35
Frame+Shearwall Concrete 50
Frame Tube Concrete 55
Tube-in-Tube Concrete 60
Modular Tube Concrete 80
-------------------------------------------

-------------------------------------------
Building Type Material Max Floor
-------------------------------------------
Rigid Frame Steel 20
Braced Frame Steel 40
Belt Truss Steel Composite 60
Frame Tube Steel Composite 80
Mega Brace Steel Composite 100
Bundled Tube Steel Composite 110
Mega Truss Tube Steel Composite 140
-------------------------------------------

Main lateral structural system should be at both directions


Load bearing brick wall is only for floor <= 4

a. Floor System

Note: L/Tp = Span/Thickness

===================================================================================
==========
Floor Types L/tp Explanation

===================================================================================
==========
REINFORCED CONCRETE

One-way Slabs on Beams/Walls 37 Solid slab span between two support


lines
Construction: Simple Formwork
Span: 4-8m
Reinforcement: simple, not very
efficient,
good for prestressing
usage: cross-wall, cross-frame
residential
highrise
Example: 0.2m slab for 7.4m span

One-way Pan Joists and Beams A thin mesh-reinforced slab


supported by
closely spaced joists span to
major beams
Span: up to 12.5m
Size: 6cm slab, 15-50cm joists,
spaced 50-75cm, up to 12.5m
span
Construction: sepcial reusable form
Reinforcement: efficient, good for
prestressing
usage: large span

One way slab on Beams and Girders A not very thin slab supported by
closely spaced beams span to major
beams
Span: Up to 14m
Size: 7.5-15cm slab, 30-60cm beam,
spaced 100-200cm, up to 14m
span
Construction: standard beam formwork
Reinforcement: efficient
usage: large span

Two-way Flat Plate Uniformly thick, two-way slab


supported
directly by columns or short
walls
Span: Up to 8m (11m for
posttensioned)
Size: 15-30cm slab for Span 8m to
12m
Construction: standard table
formwork
Reinforcement: not efficient
usage: Residential/Office with
clearance factor
Need additional reinforcement near
void/edge

Two-way Flat Slab Uniformly thick, two-way slab


supported
by column capitals/drop panels
then
to columns or short walls
Capitals increased shear capacity
Drop panel increased shear
capacity and also
negative moment capacity
Span: 10m - 12m
Size: 18-20cm slab for Span 10m to
12m,
Drop panel thickness 40-50cm
Construction: standard table
formwork
Reinforcement: not efficient
usage: Residential/Office with
clearance factor,
Flat plate with heavy load
Need additional reinforcement near
void/edge

Waffle Flat Slabs A slab supported by square grid of


closely spaced two-way joists with
solid panel
near columns acting as drop panels
Span: 8m to 12m
Construction: need special formwork
Reinforcement: efficient
Appearance: good

Two-way Slab and Beam The slab spans two-way between


orthogonal beams
Span: 4m to 6m
Construction: need standard beam and
slab formwork
Reinforcement: efficient
Good to distribute load to four
directions
Usage: For Length to width ratio <
2.0 (almost Square slab)

===================================================================================
==========
STEEL FRAMING

One-way Slabs on Beams/Walls 37 Solid slab or concrete on metal deck


or
precast slab span between two
support lines
Construction: Simple Formwork
Need Crane for precast concrete
Span: 4-8m
Reinforcement: simple, not very
efficient,
good for prestressing
usage: cross-wall, cross-frame
residential
highrise
Example: 0.2m slab for 7.4m span

Beams can be two-way or three-way


system
Steel metal deck can be made
composite with beams

===================================================================================
==========

RECOMMENDATIONS:
----------------

1. Two-Way Frame System

- Two-way slabs on beams

2. One-Way Beam System

- One way slab


- Precast slab
- Concrete and Metal deck

3. No beams

- Two-way Flat plate or flat slab

b. Beam and Slab Size

Ordinary Concrete Slab L/H Range L (m)


- One way 28-32 3-8
- Two way 30-36 7-12
- Waffle slab 20-24 10-14

Ordinary Concrete Girder L/H


- One way 12-14
- Two Way 14-16
- Cantilevers 4-6
- Arch Beam 30-40 20-50
hr = 8-12

Ordinary Concrete beam 16-20

Prestressed Concrete Girder 20-24


Prestressed Concrete Beam 24-28

Prestressed Concrete Slab L/H Range L (m)


- One way 40-44 7-12
- Two way 44-48 12-15
- Waffle slab 28-32 12-24
- Hollow core slab 36-40 10-20

Steel Wide Flange Girder


- One-way 20 5-20
- Two-way 24 5-20
- Arch beam 40-50 27-68
hr = 8-16

Steel Trussed Girder 20


c. Column Size

Required Concrete Area, Ac = Ptotal/(0.3*fc')


Column Size = Sqrt(Ac)

Approximation column rebar using axial load only design (very rough):

Interior Column: 1.5 ton/m2


Exterior Column: 2.0 ton/m2
Corner Column: 2.5 ton/m2

d. Reinforcement

ASTM A706
ASTM A615M 300,400
Fya <= Fy + 120 MPa
Fu/Fy >= 1.25

Stirrups Diameter:

Minimum Dbv Main Bar


----------------------------
10mm <= 32mm
13mm > 32mm

Spacing of longitudinal bars <= 350 mm


Spacing of side rebars <= 350 mm

Minimum Column Rebar = 1.0 % <= 6.0%

Minimum Beam Rebar = 1.4*bw*d/Fy <= 2.5% (top or bottom rebar)

Splice:

Farther than 2*h from column face


Must be enclosed by stirrups with spacing <= 4/4 or 100mm

Hook: 135 deg, 75mm, 6*db


90 deg, 75mm, 12*db

Beam Rebars:

Rebar Mminor/Mmajor ratio >= 0.5


Rebar Mmin / Mmax ratio >= 0.25

Lo = 2*h, first h -> Vc = 0


---------------------------------------------------------------------------
Notes Standard Seismic Area
---------------------------------------------------------------------------
Section width, b - b >= 250mm
Section height, h - Ln >= 4*d
Section ratio, b/h - b/h >= 0.3
Stirrups, ends d/2, 16*db, 48*dbv, 60cm d/4, 8*db, 24*dbv, 30cm
Stirrups, mid d/2 d/2
---------------------------------------------------------------------------

Column Rebars:
Lo = h, L/6, 450mm (PBI=500mm)
---------------------------------------------------------------------------
Notes Standard Seismic Area
---------------------------------------------------------------------------
Section width, b - bmin >= 300mm
Section ratio, b/h - b/h >= 0.4
Stirrups, ends b/2, 12*db, 48*dbv, 30cm b/4, 6*db, 24*dbv, so
Stirrups, mid b/2, 6*db, 15cm b/2, 6*db, 15cm
---------------------------------------------------------------------------

so = 100 + (350-hx)/3 >= 100, <= 150mm

hx = spacing of stirrups leg, typically 350mm


hx = 350mm -> so = 100mm
hx = 250mm -> so = 100 + 100/3 = 133 mm
hx = 150mm -> so = 100 + 200/3 = 150 mm

Seismic Stirrups Calculation:

Vc = 0 for V > Vmax/2, and N <= Ag*fc'/20


at distance <= h (beam) or Lo/2 (column)

So, for first distance h or Lo/2: Calculate using Vc = 0


and for next h or Lo/2 distance : Calculate using Vc

Special stirrups requirements:

For concentrated load location,


For beam carrying large torsional load,
Stirrups spacings <= 100mm

Torsional Reinforcement:

For beam carrying cantilever beams or large torsional load


Side rebars should use same diameter as main rebar
Side rebar spacing <= 150mm

PEDOMAN PELAKSANAAN STRUKTUR


PEKERJAAN BETON

1.Mutu Aggregat harus memenuhi syarat


2.Test beton dilakukan dengan kubus atau silinder, di Unpar/ITB
3.Ukuran aggregat <= b/5, 0.75*clearspc, tp/3
4.Kadar Fly Ash <= 10-15%
5.Bila dilakukan dengan kubus, faktor konversi dibawah ini digunakan:
fc' cylinder = 0.83 fc' kubus, K <= K-225
fc' cylinder = 0.87 fc' kubus, K >= K-300
6. Trial Mix

Mutu beton target untuk trial mix = 125% x fc'

7.Pengujian kekuatan masing-masing mutu beton yang dicor setiap harinya haruslah
dari :

1. Minimum 1 sample per hari


2. Minimum 1 sample per 20 m3 beton
3. Minimum 1 sample per 5 ready mix truck
8.Setiap sampel diambil sebanyak 4 buah, yang akan diuji pada hari ke-3, ke-14, dan
ke-28 (2 buah).

Umur beton Kuat Tekan


3 hr 50% fc'
7 hr 80% fc'
14 hr 90% fc'
21 hr 95% fc'
28 hr 100% fc'

9.Beton existing memenuhi syarat bila :

1.fc,average >= fc rencana


2.fc >= fc � 35 kg/cm2

10.Selimut Beton

Fungsi Komponen Cover


Langsung diatas tanah 70 mm
Exterior 50 mm
Balok dan Kolom 40 mm
Pelat dan Wall 20 mm
Shell 15-20 mm

11.Slump Beton

Balok, Kolom, Wall 120 +/- 20 mm Floor 1-5


Balok, Kolom, Wall 140 +/- 20 mm Floor 5-10
Balok, Kolom, Wall 160 +/- 20 mm Floor 10-15
Balok, Kolom, Wall 180 +/- 20 mm > Floor 15 atau FC atau
SCC bila mutu diatas K-400
Perkerasan dan Pelat 100 +/- 20 mm
Bored Pile 160 +/- 20 mm
DPT 140 +/- 20 mm

Slump beton makin tinggi: Biaya makin mahal tapi pekerjaan pengecoran lebih
mudah
Slump beton dapat ditingkatkan namun tidak boleh melanggar persyaratan faktor
air semen
Bila faktor air semen sudah tinggi, slump beton dapat ditingkatkan dengan
tambahan aditif.

Kadar Semen dan Estimasi Perbandingan adukan

Berikut ini daftar Mutu Beton SNI Sesuai Standar Nasional Indonesia untuk 1 m3
beton standar.
(Kadar dibawah ini harus disesuaikan dengan material lokal yang digunakan)

-----------------------------------------------------------------------------------
--------------
Mutu Beton Semen (kg) Pasir (kg) Kerikil (kg) Air (liter) w/c ratio
-----------------------------------------------------------------------------------
--------------
7.4 MPa (K 100) 247 869 999 215 0.87
9.8 MPa (K 125) 276 828 1012 215 0.78
12.2 MPa (K 150) 299 799 1017 215 0.72
14.5 MPa (K 175) 326 760 1029 215 0.66
16.9 MPa (K 200) 352 731 1031 215 0.61
19.3 MPa (K 225) 371 698 1047 215 0.58
21.7 MPa (K 250) 384 692 1039 215 0.56
24.0 MPa (K 275) 406 684 1026 215 0.53
26.4 MPa (K 300) 413 681 1021 215 0.52
28.8 MPa (K 325) 439 670 1006 215 0.49
31.2 MPa (K 350) 448 667 1000 215 0.48
-----------------------------------------------------------------------------------
--------------

Catatan:

1. Konversi: Pasir = 1400 kg/m3, Kerikil = 1350 kg/m3, Bulking factor pasir = 20%
2. W/C ratio maksimal 0.50 untuk mutu K-300 keatas, maksimal 0.40 untuk K-450
keatas

12. FAKTOR AIR SEMEN

SNI-T-15-1990-03:11, Tabel 5
-------------------------------------------------------------------------
No. Kondisi Lingkungan Korosif Jumlah semen FAS (Max)
-------------------------------------------------------------------------
1 Dalam Ruangan No 275 0.6
Korosif 325 0.52
2 Luar Ruangan Tidak Terlindung 325 0.6
Terlindung 275 0.6
3 Dalam Tanah Basah/Kering 325 0.55
Air tanah sulfat 300 0.5
4 Dalam Air Tawar 300 0.5
-------------------------------------------------------------------------
5 Dalam Air Payau Type II, Type V 330 0.5
6 Dalam Air Laut Type II, Type V 370 0.45
-------------------------------------------------------------------------
W/C ratio maksimal 0.50 untuk mutu K-300 keatas, maksimal 0.40 untuk K-450
keatas

13. FLY ASH

Fly Ash dapat ditambahkan dengan akibat:

1. Mutu beton dapat naik


2. Kadar maksimum 15-20%
3. Penambahan Fly Ash akan memperlambat setting, efeknya 0.5-0.8 dari beton
Class F Fly Ash = 0.5
Blast Furnace Fly Ash = 0.65-0.8

14. MASS CONCRETE

Tebal pengecoran > 1.0 m memerlukan penanganan panas akibat pengecoran


Suhu di dalam beton bisa naik sampai 70-80 degC.
Untuk menghindari retak maka perbedaan panas didalam dan di permukaan beton
harus < 21 degC
Bila tebal > 1.0 m maka suhu didalam dan dipermukaan perlu dimonitor untuk
mendapatkan perbedaannya.

Persiapan dilakukan diawal dengan :

1. Menggunakan Fly Ash (untuk memperlambat reaksi kimia / setting, sehingga


produksi panas melambat)
2. Menggunakan air es pada waktu pengecoran (Kurang efektif)
3. Menggunakan selimut berupa lapisan pasir + terpal atau Styrofoam tebal 10cm
sehingga suhu permukaan ikut naik sehingga perbedaannya dengan suhu di dalam
beton menjadi berkurang

Temp awal beton maks sebelum cor = 32 degC


Temp maks pada beton = 71 degC
Perbedaan temp dalam dan permukaan beton <= 21 - 36 degC

Kenaikan temperatur beton : 13 degC per 100 kg/m3 cement

Isolasi untuk menjaga perbedaan temp tidak terlalu besar

- Styrofoam 1"
- Plastic cor
- Pasir 10cm

15. Kekuatan Beton Pasca Kebakaran

Suhu Warna Kuat Tekan Sisa (Pct)


-------------------------------------------------
200 Tetap 85%
300 Merah muda 62%
400 Merah muda 58%
600 Abu-abu hijau 35%
700 Abu-abu hijau 20%
800 Abu-abu hijau 0%
900 Abu-abu
1200 Kuning

PEDOMAN PELAKSANAAN STRUKTUR


PEKERJAAN BESI BETON

1.Besi beton tidak boleh berkarat

2.Penyimpanan besi beton harus dilindungi dari hujan dan tidak boleh bersentuhan
dengan tanah

3.Ukuran diameter harus memenuhi syarat dengan toleransi +/- 0.5mm

4.Test dilakukan setiap 20 ton besi, untuk tiap diameter yang digunakan

5.Test yang dilakukan : Test Tarik dan Test Pembengkokan, yang dlakukan di Lab
Unpar atau ITB

6.Persyaratan Pembengkokan
1.Diameter Pembengkokan Min, D <= 25 = 6 Db
2.Diameter Pembengkokan Min, D > 25 = 8 Db

7.Persyaratan Uji Tarik:


1.Fy,aktual <= Fy,rencana + 20 Mpa
2.Fu/Fy >= 1.25
2. Thermal effects on Podium Floor

3. Flat Slab Design

4. Post-tensioned Flat Slab Design

C. STEEL STRUCTURE

1. General

Direction Convention for kx,ky,Lux,Luy:

kx = Buckling Length Factor for Buckling around X-X (Major of I) Axis


ky = Buckling Length Factor for Buckling around Y-Y (Minor of I) Axis)
Lur = Minimum Lateral Unbraced Length Ratio (Lumin/L)
Lux = Lateral Unbraced Length Ratio in X-X direction (Lux/L)
Luy = Lateral Unbraced Length Ratio in Y-Y direction (Luy/L)

2. Torque for Bolt Installation

Selecting Bolt

Bolt Fu (MPa) Fy (MPa)


-----------------------------
A307 420 340
A325 830 660
A490
4.8 420 340
8.8 830 660
8.8s 830 660

Use Bolt Diameter : 3/4", 7/8", 1" (20, 22, 24 mm)


Hole diameter : Dh = Db + 1/16" = Db + 1.5mm
Plate Thickness : >= 10 mm
Slip-Critical connections : for Reversal, fatique, large impact, vibration
load

Bolt Usage
-----------------------------------
M12 Stairways, small purlin, cold-formed
M16 Light steel, towers, platform, canopy, purlins, small beams
M20 Medium and heavy structures, buildings
M24 Large and heavy structures

Bolt A307
--------------------------------------------------
D (in.) D (mm) Torque (ft-lb) Torque (N-m)
--------------------------------------------------
1/4 6.35 5.0 6.8
3/8 9.525 14.0 19.0
1/2 12.7 40.0 54.2
5/8 15.875 50.0 67.8
3/4 19.05 110.0 149.2
1 25.4 250.0 339.0
--------------------------------------------------

Bolt A325
--------------------------------------------------
D (in.) D (mm) Torque (ft-lb) Torque (N-m)
--------------------------------------------------
1/4 6.35 11.0 14.9
3/8 9.525 37.5 50.9
1/2 12.7 95.0 128.8
5/8 15.875 190.0 257.6
3/4 19.05 335.0 454.3
1 25.4 750.0 1017.0
--------------------------------------------------

Ukuran Bolt Standard: D19, D22, D25 mm (Paling banyak alat pengencang
yang sesuai)
Usahakan menggunakan ukuran bolt D19-D25, agar tebal
pelat buhul
tidak terlalu besar

3. Gable Frame (Factory) Design

Rafter and Column size estimation (rough):

Light Metal Roof : WF depth = (L + 5) in mm, L in meter


Medium Metal Roof : WF depth = (L*1.2 + 5) in mm, L in meter

4. Tower Design and Construction

If Designing tower with height more than 100m, please consider:

1. Construction method
2. Allowable wind speed during construction
3. Allowable wind speed for unfinished module
4. Exposure Category
5. Important Factor
6. Base plate bolts must use double nuts

Some Failures Causes:

1. Chemical anchor pulled out


2. Unstable unfinished module during erection
3. Erection equipment
4. Anchor bolts failed
5. Broken of horizontal bracings

5. Cold Formed Steel Truss

If using truss with both supports modeled as hinges, horizontal reactions must
be transferred to beams or columns or resisted by a horizontal tie rod.

D. GEOTECHNICAL DESIGN

0. Soil Stiffness Modulus (Es)


(Used for spring stiffness for raft foundation)

Es = c.Nspt (in kPa unit)


Es = c*qc (in qc unit)

Soil Type SPT CPT


=========================================================
Sand (NC) 500(N+15) 2 to 4 qc
Sand (Saturated) 250(N+15)
Sand (OC) 18000 + 750 N 6 to 30 qc
gravelly sand 1200(N+6)
and Gravel 600(N+6), N <= 15
600(N+6)+2000, N>15
Clayey Sand 320(N+15) 3 to 6 qc
Silty Sand 300(N+6) 1 to 2 qc
Soft Clay 3 to 8 qc
Clay IP > 30, Organic 100 to 500 Su
IP < 30, Stiff 500 to 1500 Su
=========================================================

1. Pile Driving Criteria

Pile Driving Criteria:

1. Desired Length
2. Maximum Blows (400..2300 blows, depends on pile size and site condition)
3. Blows per set (1.0 s/d 2.5mm) per blows, or 10mm - 25mm per 10 blows
4. Hammer Weight Wr : 1.5, 3, 5, 7, 9 ton, Max Ratio Wr/Wp = 0.5 - 1.0
5. Drop of hammer : 500mm to 1500mm

Driving Method:

1. Drop Hammer
2. Diesel Hammer
3. Hydraulic Hammer

1. Drop Hammer

2. Diesel Hammer

Source: Kobe Diesel Pile Hammmer, K 13 : Weight of ram = 13 KN

Spun Pile Type of Diesel Hammer


(mm) Single Pile Jointed Pile
-----------------------------------------------------------
300 K 13 K 13
350 K 13 K 13 / K 25
400 K 25 K 25 / K 35
450 K 25 / K 35 K 35
500 K 35 K 35 / K 45 / KB 45
600 K 45 / KB 45 K 45 / KB 45 / KB 60

Hiley Formula for Diesel Hammer:

f. En (Wr + e^2*Wp)
Rd = -------------------- * ---------------
S + 0.5*(C1+C2+c3) (Wr + Wp)

Where:

Rd = Ultimate bearing capacity of pile (ton)


f = Relative efficiency of hammer (1.0 for diesel, 0.75 for drop
hammer)
En = Hammer Energy from Manufacturer
En = 2 * Wr * H for Diesel hammer
En = Wr * H for Drop Hammer
Wr = Ram Mass (ton)
H = Drop Height (m)
e = Coeficient of Restitution
e = 0.5 for concrete pile
e = 0.5 for steel pile
e = 0.25 for wodden pile
Wp = Pile mass (ton)
S = Set (Pile Penetration) per blow (m)
C1 = Elastic Compression of Cushion and cap (m)
C2 = Elastic Compression of Pile (m)
C3 = Elastic Compression of Soil (m)

p1 = Pressure on cushion of pile butt


p2 = Pressure on concrete pile
p3 = pressure on soil

Values of C1,C2,C3 for Diesel Hammer:

Item Easy Medium Hard Very Hard

-----------------------------------------------------------------------------
p1,2,3 35 kg/cm2 70 kg/cm2 105 kg/cm2 140 kg/cm2
C1 0.003 0.006 0.01 0.013
C2 0.002 * L 0.004 * L 0.006 * L 0.008 * L
C3 0 - 0.0025 0.0025 0.0025 0.0025

3. Hydraulic Hammer

Source: IHC HYDROHAMMER Manual, S = Striking energy in KJ

Spun Pile Type of Diesel Hammer


(mm) Single Pile Jointed Pile
-----------------------------------------------------------
300 S 35 S 35
350 S 35 S 35
400 S 35 S 35 / S 60 / S 70
450 S35 / S60 / S70 S 60 / S 70
500 S 60 / S 70 S 60 / S 70 / S 90
600 S 60 / S 70 S 60 / S 70 / S 90

Hiley Formula for Hydraulic Hammer:

f. En f.En
Rd = -------------------- = --------------------------------
S + 0.5*(C1+C2+c3) S + 0.5*((C1 + C*Sqrt(En + C3))

Where:

Rd = Ultimate bearing capacity of pile (ton)


f = Relative efficiency of hammer (2.5)
En = Energy readout on Hydrohammer control panel (KJ)
S = Set (Pile Penetration) per blow (mm)
C = Factor depending on type of Hydrohammer and pile cross section area

Hammer Weight = 0.5 - 1.0% of Pile Weight

Stopping the Driving of Pile (Set = mm/blow for last 30cm)


Pile Type Max Blow/25mm Set (mm/Blow) set (mm/10
Blows)

------------------------------------------------------------------------------
Timber Pile 4-5 Blows / 25mm 5 50
Concrete Pile 6-8 Blows / 25mm 4 40
Steel Pile 12-15 Blows / 25mm 2 20

To achieve end bearing : Set = 25.4mm / 10 Blows = 2.5mm / Blow

Number of strokes = 500 - 3000 strokes (depend on pile size, depth,


soil condition)
To avoid damage = 500 - 2000 strokes (depend on pile size, depth,
soil condition)

Kobe Diesel Hammer

Type Wr (kN) Stroke (m)


-------------------------------
K150 147 2.59
K45 44.0 2.80
K42 41.2 2.59
K32 31.4 2.59
K25 24.5 2.80
K13 12.7 2.59

2. Pile Test

PDA Test can give also Pile Integrity (PIT) and Pile Length Info
PDA Test cost 10 times more than PIT Test
PDA Test depend on hammer weight (2.5 ton to 7 ton)
PDA Test should reach ultimate load of pile (not rebound)

Axial Test load should be 200% of allowable axial load and stop if reaching
more than 1" or the pile concrete capacity is reached.

Lateral Test Load should be 2xHe and stop if reaching 1/4" for first cycle
and 1/2" for second cycle. The test load also depends on the desired lateral
resistance and lateral capacity of pile. It is good to have simulation analysis
using soil spring to determine maximum load that can be accepted by pile.

Typical Values for several Pile size:

Pile Type Size Lateral Test Load


==========================================
Precast Pile PC28 2 x 3.5 ton
Precast Pile PC32 2 x 5 ton
Precast Pile 45X45 2 x 7.5 ton
Spun Pile D50 2 x 10 ton
Bored Pile D60 2 x 12.5-15 ton

Final Set

Penurunan tiang setiap N pukulan.


Untuk menentukan berhentinya pemancangan, biasanya ditentukan batas nilai set

Final Rebound
Total rebound, kenaikan kepala tiang setelah sejumlah pukulan tertentu

LOADING TEST UNTUK BORED PILE

Pengujian tiang dapat dilakukan pada used dan unused pile

Pengujian Aksial Tekan :

1. Jumlah Pengujian Aksial = 1 % dari per Jenis tiang

2. Pengujian Statik = 75%, Pengujian Dinamik = 25% dgn PDA


Tiang yang diuji statik dapat diuji PDA juga untuk korelasi pada
pengujian PDA lainnya

3. Bila pengujian tidak di C.O.L maka selimut tiang dari permukaan hingga
C.O.L perlu diloose
thdp tanah keliling dengan :

a. Double Casing
b. Goegandel (semacam Geomembrane) minimal 2 lapis
c. Metode lainnya

4. Bila pengujian tidak di C.O.L maka harus dipasang telltale yaitu pada
elevasi COL,
elevasi bottom tulanggan tiang bor dan 1/2 panjang efektif tiang

5. Tiang uji tekan pertama disarankan untuk dipasang sepasang VWSG pada 5
elevasi

Pengujian Aksial Tarik :

Hanya diperlukan bila gaya tarik atau uplift akibat gempa atau tekanan air
tanah

Pengujian Lateral:

1. Dilakukan 1x per tiap jenis tiang


2. Uji Lateral harus dilakukan pada COL

Quality Test:

Untuk kontrol kualitas pekerjaan dapat dilakukan pengujian tambahan berupa:

1. PIT Test untuk mengecek kualitas pengecoran, keutuhan tiang, panjang


tiang
Jumlahnya 10% dari tiap jenis tiang, harga sekitar 500rb/test

2. PDA Test untuk mengetahui daya dukung tiang dan kebersihan ujung
tiang
Harga sekitar 4-5jt/test
Jumlahnya terserah.

3. Pile Load Capacity

Type Size (cm) T (cm) Axial (ton) Lateral (ton.m) Mcr


(t.m) Mult (t.m)
-----------------------------------------------------------------------------
----------------

Bored Pile 30 35 1.45


(KETIRA) 40 60 6.80
50 90 16.20
60 120 31.70

Large Bored Pile


80 150-250
100 250-400

Mini Pile T28 20-30 1.1-1.5


(KETIRA) T32 30-40 1.8-2.4
S20 30-35 1.7
S25 45-50 3.4

Mini Pile T28, 3 D13 23 1.1-1.5


(PT BEP) T32, 3 D16 37 1.8-2.4
K-450, U-39

Rectangular 45 150

Spun Pile 30 6.0 65-70 2.5-4.0 3.75-


8.0
(Wika, K-600) 35 6.5 85-93 4.83-13.25 3.5-6.0
5.25-12.0
40 7.5 111-121 7.89-21.30 5.5-9.0
8.25-18.0
45 8.0 135-150 8.87-27.95 7.5-12.5
11.25-25.0
50 9.0 170-185 13.80-39.93 10.5-
17.0 15.75-34.0
60 10.0 230-252 21.30-63.83 17.0-
29.0 25.5-58.0

3. Soil Parameters

4. Basement Floor Design for Expansive Soil

Expansive soil is soil that expands when the water content changes, and shrinks
otherwise.
If the water content kept constant, no expansion will occur.
Expansive soil can cause heavy uplift load on basement floor, from 0.5-20 ton/m2

Alternative design for expansive soil:

1. Using thick slab


2. Using thin slab + tension pile
3. Using thin suspended slab + Continous watering to keep water level
constant
4. Replacing top soil with non-expansive soil

If Suspended slab used, consider also how to construct the basement slab.
To avoid costly formwork, one can use 10cm polystyrene compressible for
formwork.
5. Differential Settlement Between Tower and Podium

1. If the differential settlement is less than 1" or L/250


no special treatment
2. If more, and soil permeability is high (sandy, sand), then use
delayed strip (delay casting concrete at one strip between tower
and podium slab) at least 6 months to one year.
3. If diff settlement is less than 100mm and and soil permeability is
low (clay with high plasticity), then use slab with gradual thickness
change from tower to podium. Use spring to model pile and to get
more even load distribution at the border of tower and podium.
4. If differential settlement is more than 100mm for point 3,
use dilatation or separation between poidum and tower.

6. Earth Pressure on Basement Wall due to Earthquake

1. Use Mononobe Theory to get Kae (Active Soil Pressure Coefficient)


at earthquake
2. Reference: Soil Dynamics, Brajas

7. Liquefaction Potential of Soil

1. Earthquake Magnitude > 6.0


2. High Ground Water Level (near coastal or beach)
3. Fine sand layer depth <= 15m
4. Fine sand layer Nspt <= 30 or 22, qc <= 157 tsf (15 MPA)
5. Particle smaller than 0.005mm <= 15%
6. Liquid Limit < 35%
7. Water content > 0.9 LL
8. Saturation 80-85%

Foundation for liquifaction:


1. Thick Raft Foundation
2. Deep Sloof for stiffener
3. Good pile to pilecap connection (50 D embedded length + 75mm + Sengkang
masuk kedalam pilecap)
4. Pile rebar extend passing the liquifieable layer

Methods of Soil Improvement:

1. Soil Dynamic Compaction


2. Stone column, vibro compacted
3. Deep Vibro Compacted until 20-30m
4. Cement based pressurized grouting

E. PAVEMENT DESIGN

SOIL TYPE CBR Values


-------------------------------------
Silty Sandy Clay 4%
Laterrite Clay 8%
Fine Laterrite 12%
Coarse Laterrite 25%
River Sand and Gravel 25%
Laterrite, Sand + Gravel 35%

SIMPLIFIED DESIGN:
------------------
h = f sqrt(P/CBR)

h = tebal perkerasan (cm)


P = Beban as maksimum (ton)
f = Koefisien sbb:

Lalu lintas / Kelas f


------------------------------
Sangat Padat 28
Padat 25
Sedang 20
ringan 16

Type beban Tebal Rigid Pavement (cm)


Dengan rebar Tanpa rebar
---------------------------------------------
Garasi 15 20
Gudang ringan 20 25
Gudang sedang 25 30
Gudang berat 30 40

Kemiringan Jalan

Ruas panjang Maksimum 7%


Ruas pendek Maksimum 20% untuk 150m
Pegunungan 8-10%
Perbukitan 6-7%
Dataran 5%
Jalur sepeda 5-6%

Jari-jari busur tikungan

R >= +/- 2.5 W, dimana W = jarak roda

dan

R >= v*v/(g(f + TanB)

dimana:
v = Kecepatan kendaraan maksimum
g = gravitasi
f = koefisien friksi
B = sudut miring melintang jalan

F. JEMBATAN DESA

a. Jembatan Gantung Bambu untuk Pejalan Kaki

b. Jembatan Gantung Kayu untuk Pejalan Kaki

c. Jembatan Gantung Kayu untuk Jalan Arteri

G. COST ASPECTS
1. Generally concrete structure cost less than steel structure, except for
span > 15m and for roof structure (light load)

2. Concrete Equivalent Thickness for typical structure

Range from 0.25-0.35 m3 / m2 (Upper structure)

3. Concrete Rebar density

Range from :

120-150 kg/m2 Medium Rise Residential/Office/Hotel


150-180 kg/m2 Highrise Residential/Office/Hotel
180-250 kg/m2 Mall, Exhibition Hall

4. To get optimum concrete rebar density, use optimum beam depth:

Larger beam depth


- Low rebar density
- More weight
- More lateral earthquake load

Lower Beam depth


- Higher rebar density
- Less weight

5. Reducing Beam Reinforcement:

- Use Rigid End Zone with alpha = 0.5 for beams


- Use Cracked Inertia factor = 0.7-1.0
- Use Slab Thickness for calculating mid-span moment
(Cracked Inertia factor = 0.70 if slab thickness included)

- Use Moment redistribution factor:


Reduce top/negative moment by 10-15%
Increase Positive moment by 15-20%

- Use right concrete cover:


Beam < 15x20 2.5cm
Beam < 30x50 3.0cm
Beam >= 30x50 4.0cm
Slab 2.0-2.5cm

6. Use Concrete Biaxial Columns

- Use Rigid End Zone with alpha = 0.5 for columns


- Use Cracked Inertia factor = 0.7
- Use right concrete cover:
Column < 20x20 2.5cm
Column < 40x40 3.0cm
Column >= 40x40 4.0cm

7. Use Uniaxial Concrete Column

- If possible, use Uniaxial Column placed at direction of major


moment

H. TOP DOWN DAN SEMI-TOP DOWN CONSTRUCTION


Top Down Construction adalah metode pekerjaan basement dimana Basement
dikerjakan dari lantai
GF atau BS1 ke arah bawah sampai dasar, terbalik dengan metode Bottom-Up yang
biasa digunakan.

Dengan menggunakan metode Top Down ini maka :

1. Lantai GF atau BS1 akan selesai duluan dan dapat digunakan


2. Tidak diperlukan lagi Ground Anchor
3. Pelat lantai akan berfungsi sebagai Ground Anchor atau Strut
4. Dinding DPT akan berperilaku sebagai DPT dengan Anchor atau Strut
5. Tanah dibawah pelat lantai akan digali belakangan
6. Walaupun dibutuhkan waktu yang lebih lama dalam penyelesaian basement,
namun upper structure
dapat dikerjakan sekaligus (overlap) dengan basement (Metode Up-Down)
sehingga total waktu yang
diperlukan bisa lebih singkat atau minimal sama

Top Down Construction digunakan bila:

1. Terdapat basement dalam


2. Muka air tanah dalam
3. Sulit menggunakan Ground Anchor
4. Lantai BS1 atau GF akan digunakan untuk Konstruksi (Lahan sempit)
Beban konstruksi sekitar 2 ton/m2
5. Dinding DPT terlalu tebal bila didisain secara kantilever

Bila tidak semua area menggunakan metode Top-Down maka disebut Semi-Top Down.
Biasanya Semi-Top Down melakukan metode Top Down hanya pada area keliling
bangunan
yang berhubungan dengan DPT (1-2 as ke arah dalam gedung).
Metode Semi-Top Down ini bila memungkinkan akan memberikan hasil yang lebih
cepat
(karena sebagian besar gedung dibangun dengan metode biasa / Bottom-up) namun
tetap mendapatkan keuntungan dari metode Top-Down untuk dinding DPT nya.

Dalam kenyataannya, metode Top-Down juga akan meninggalkan sebagian area


dibangun
dengan cara Bottom-Up, terutama area Core wall, yang akan sangat sulit dan mahal
jika
dibangun dengan metode Top Down juga.

Untuk menghemat biaya Top-Down dapat dimulai dari lantai BS1:

1. Open Cut sampai BS1


2. DPT dari BS1 ke GF berperilaku sebagai kantilever
3. Lakukan metode Top-Down sampai Basement terbawah
4. Dari BS1 ke atas dengan metode biasa

Untuk menghemat biaya dan mempercepat konstruksi Top-Down, maka metode Top Down
juga
dapat dilakukan dengan per dua lantai (melompat 1 lantai atau skipped floor).
Konsekuensinya:

1. Dinding DPT akan lebih tebal karena pada masa konstruksi akan menahan
tekanan dua level
lantai
2. Kolom Kingpost akan lebih besar karena panjang tekuk menjadi 2x nya
Pelat lantai teratas ini dicor diatas lantai kerja (kalau tanah cukup keras)
atau diatas Scaffolding
yang menumpu pada concrete slab atau pondasi minipile/mini bored pile (kalau
tanah lunak).
Penggunaan Scaffolding dianjurkan supaya didapat pelat yang lebih rata.
Tebal pelat beton teratas ini bisa antara 25cm s/d 100cm tergantung jarak kolom
dan beban kerja.

Pelat lantai BS1 atau GF dapat digunakan untuk beban konstruksi (2 ton/m2),
sedangkan untuk
pelat lantai dibawahnya mungkin juga digunakan untuk jalur forklift atau mini
excavator (1-2 ton/m2).
Pelat lantai ini perlu dicheck terhadap pons akibat gaya kolom karena pelat akan
berfungsi sebelum
balok dipasang. Pelat juga perlu dicheck terhadap tegangan aksial akibat tekanan
tanah, karena mungkin
ada perlubangan pada pelat akibat lubang ekskavasi dan area yang ditinggalkan
(Core wall area).
Kalau diperlukan lubang pelat diperkuat dengan strutting baja arah horizontal.

Untuk menopang lantai BS1 atau GF ini digunakan :

1. Kolom sementara (KingPost) dari Profil Baja yang masuk kedalam Bored Pile
diameter besar
(Lebih mudah bila menggunakan Single Bored Pile)

2. Kolom sementara dari Bored Pile Diameter kecil/sedang untuk menahan balok
bentang besar

Kolom Kingpost

1. Bila digunakan kolom Kingpost maka biasanya terdiri dari kolom baja High
Strength dengan
perkuatan Kingcross (bentuk +)
2. Kolom dimasukkan dengan bantuan Guide frame agar terpasang vertikal dan
tidak miring
3. Elevasi kolom dijaga agar posisi sambungan tulangan balok tepat
4. Untuk sambungan tulangan balok, kolom dapat dilubangi untuk dilewati
tulangan balok
atau dipasang mechanical coupler yang dilas pada flens kolom
5. Setelah kolom dicor di dalam Bored pile, beton bored pile dapat dibobok dan
kolom kingpost
dapat dipasang stek tulangan baja dan pelat collar untuk sambungan ke
tulangan baja.
6. Collar plate dilubangi dan dipasang pipa grouting untuk pengecoran kolom
7. Tulangan Kolom kemudian dipasang menembus collar plate dan dicor dengan
beton baru

Sistem Pondasi Top-Down

Metode Top Down menggunakan Sistem Pondasi Large Bored Pile.


Tepat dibawah kolom harus ada Large Bored Pile sehingga Kingpost dapat dipasang
dengan mudah.
Contoh : Bored Pile D 1.8m, L=70m, Kapasitas 1800 ton

Sistem DPT

Digunakan Soldier Pile atau Tanpa Soldier Pile, tergantung kedalaman Basement.
Bila digunakan soldier pile, diberikan stek bentuk U (D13-300) dengan metode
chemset.
Bisa juga digunakan metode embedded, dimana stek U ditekuk ke sisi Soldier pile,
namun biasanya
hasilnya kurang rapih.
Soldier Pile dapat dicor sekaligus sepanjang kedalaman Soldier Pile.
Sedangkan dinding DPT dicor sebagian-sebagian dari atas kebawah, dengan
memberikan stek tulangan ke
bawah.

I. EARTHQUAKE DESIGN

Struktur yang dirancang untuk kategori desain seismik E atau F dan memiliki
ketidakberaturan horisontal Tipe 1b atau ketidakberaturan vertikal Tipe 1b, 5a,
atau 5b tidak
boleh digunakan. Struktur yang dirancang untuk kategori desain seismik D dan
memiliki ketidakberaturan vertikal Tipe 5b tidak boleh digunakan.

1. Ketidakteraturan Horizontal

1.a. Ketidakteraturan Torsi


- Hanya untuk struktur dengan diafragma kaku atau setengah kaku
- Hitung simpangan antar lantai tingkat maksimumn di satu ujung struktur,
terasuk torsi tak terduga = a
- Hitung simpangan antar lantai tingkat rata-rata di kedua ujung struktur =
b
- Ketidakteraturan Torsi adalah jika a > 1.2 * b
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Perbesaran eksentrisitas (5%) dan perbesaran torsi
- Kategori Disain Seismik : B,C,D,E,F

1.b. Ketidakteraturan Torsi Berlebihan


- Hanya untuk struktur dengan diafragma kaku atau setengah kaku
- Hitung simpangan antar lantai tingkat maksimumn di satu ujung struktur,
terasuk torsi tak terduga = a
- Hitung simpangan antar lantai tingkat rata-rata di kedua ujung struktur =
b
- Ketidakteraturan Torsi Berlebihan adalah jika a > 1.4 * b
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Perbesaran eksentrisitas (5%) dan perbesaran torsi
- Tidak boleh untuk E,F
- Kategori Disain Seismik : B,C,D,E,F

2. Ketidakberaturan sudut dalam


- Jika ada kedua proyeksi denah struktur dari sudut dalam lebih besar dari
15% dimensi struktur dalam
suatu arah (Tonjolan denah dengan panjang > 0.15*L)
- Denah L, T, U, dan C termasuk dalam kategori ini
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Kategori Disain Seismik : D,E,F

3. Ketidakberaturan diskontunitas diafragma


- Jika terdapat diafragma dengan diskontinuitas atau variasi kekakuan
mendadak, dengan daerah terpotong atau
terbuka > 50% daerah gross (Ada lubang > 50% luas lantai)
- Jika ada perubahan kekakuan diafragma efektif lebih dari 50% dari suatu
tingkat ke tingkat selanjutnya
(Diafragma mengecil/membesar > 50%)
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Kategori Disain Seismik : D,E,F

4. Ketidakberaturan pergeseran melintang terhadap bidang


- Jika ada diskontinuitas dalam lintasan tahanan gaya lateral
(Kolom/shearwall transfer)
Balok, Kolom dan shearwall pemikul harus direncanakan dengan menambahkan
faktor Omega
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Kategori Disain Seismik : B,C,D,E,F

5. Ketidakberaturan sistem nonparalel


- Jika ada elemen penahan gaya lateral vertikal tidak paralel atau simetris
terhadap sumbu-sumbu orthogonal utama
sistem penahan gaya gempa (Kolom portal tidak sejajar shearwall atau
corewall)
- Kategori Disain Seismik : B,C,D,E,F

2. Ketidakberaturan Vertikal

1.a. Ketidakberaturan Kekakuan Tingkat Lunak (Soft Story)


- Jika terdapat suatu tingkat dimana kekakuan lateralnya < 70% dari
kekakuan lateral tingkat diatasnya
(Contoh: Bila ukuran kolom sama dan H1 >= 1.13*H2)
- Jika terdapat suatu tingkat dimana kekakuan lateralnya < 80% dari rata-
rata kekakuan lateral 3 tingkat diatasnya
- Tidak berlaku untuk gedung 1 tingkat atau gedung 2 tingkat (B,C,D)
- Kategori Disain Seismik : D,E,F

1.b. Ketidakberaturan Kekakuan Tingkat Lunak berlebihan (Severe Soft Story)


- Jika terdapat suatu tingkat dimana kekakuan lateralnya < 60% dari
kekakuan lateral tingkat diatasnya
(Contoh: Bila ukuran kolom sama dan H1 >= 1.18*H2)
- Jika terdapat suatu tingkat dimana kekakuan lateralnya < 70% dari rata-
rata kekakuan lateral 3 tingkat diatasnya
- Tidak berlaku untuk gedung 1 tingkat atau gedung 2 tingkat (B,C,D)
- Tidak boleh untk E,F
- Kategori Disain Seismik : D,E,F

2. Ketidakberaturan Berat (Massa)


- Jika ada masa efektif suatu tingkat lebih dari 150% massa efektif tingkat
didekatnya.
(Jika luas lantai tingkat diatas suatu lantai > 150% luas lantai tingkat
tersebut)
- Kecuali rangka atap yang lebih ringan di lantai teratas
- Tidak berlaku untuk gedung 1 tingkat atau gedung 2 tingkat (B,C,D)
- Kategori Disain Seismik : D,E,F

3. Ketidakberaturan Geometri vertikal


- Jika dimenis horizontal sistem penahan gaya gempa di semua tingkat > 130%
dimensi horizontal sistem penahan
gaya gempa tingkat didekatnya (Ukuran kolom di stau tingkat > 1.3 ukuran
kolom di tingkat di dekatnya)
- Kategori Disain Seismik : D,E,F

4. Diskontinuitas Arah Bidang dalam Ketidakberaturan Elemen Penahan Gaya


Lateral Vertikal
- Jika ada pergeseran pada arah bidang elemen penahan gaya lateral yang
lebih besar dari panjang elemen tersebut
(Kolom yang bergeser > ukuran kolom, shearwall yang tidak menumpu ke
shearewall dibawahnya)
Balok, Kolom dan shearwall pemikul harus direncanakan dengan menambahkan
faktor Omega
- Jika terdapat reduksi kekakuan elemen penahan di tingkat dibawahnya
- Gaya untuk Disain sambungan antara diafragma dan disain elemen kolektor
harus dikalikan 1.25 untuk D,E,F
- Kategori Disain Seismik : B,C,D,E,F

5.a. Diskontinuitas dalam Ketidakberaturan Kuat lateral Tingkat


- Jika ada kuat lateral tingkat < 80% kuat lateral tingkat diatasnya
(Contoh: Bila ukuran kolom sama dan H1 >= 1.08*H2)
- Kuat lateral tingkat adalah jumlah kuat lateral semua elemen pada tingkat
tersebut
- Tidak boleh untk E,F
- Kategori Disain Seismik : D,E,F

5.b. Diskontinuitas dalam Ketidakberaturan Kuat Lateral Tingkat yang Berlebihan


- Jika kuat lateral tingkat < 65% kuat lateral tingkat diatasnya
(Contoh: Bila ukuran kolom sama dan H1 >= 1.15*H2)
- Kuat lateral tingkat adalah jumlah kuat lateral semua elemen pada tingkat
tersebu
- Struktur type 5b ini hanya boleh untuk gedung 2 tingkat atau tinggi total
9m kecuali
didisain secara elastik dengan faktor Omega
- Tidak boleh untk D,E,F
- Kategori Disain Seismik : B,C,D,E,F

3. Metode Analisis

Statik Ekivalen : Untuk Gedung rangka ringan 3 tingkat dengan Kategori B,C
Untuk Gedung 2 tingkat dengan Kategori B,C
Struktur tidak beraturan dengan T< 3,5Ts dan mempunyai hanya
ketidakteraturan horisontal Tipe
2, 3, 4, atau 5 dari Tabel 10 atau
ketidakteraturan vertikal Tipe 4, 5a, atau 5b dari Tabel 11

Respons Spektrum: Untuk Gedung rangka ringan 3 tingkat dengan Kategori D,E,F
Untuk Gedung 2 tingkat dengan Kategori D,E,F
Semua struktur lainnya

Analisis Riwayat Waktu : Semua struktur

Opsi yang wajib: Inersia retak, P-delta, Koreksi Eksentrisitas

Faktor Redundansi: Kategori D,E,F rho = 1.3, others = 1.0

Reduksi LL : 0.25

Untuk struktur yang dirancang untuk kategori desain seismik D, E, atau F, rho harus
sama
dengan 1,3 kecuali jika satu dari dua kondisi berikut dipenuhi, di mana rho
diijinkan diambil
sebesar 1,0:
a. Masing-masing tingkat yang menahan lebih dari 35 persen geser dasar dalam arah
yang
ditinjau harus sesuai dengan Tabel 12;
b. Struktur dengan denah beraturan di semua tingkat dengan sistem penahan gaya
gempa
terdiri dari paling sedikit dua bentang perimeter penahan gaya gempa yang merangka
pada masing-masing sisi struktur dalam masing-masing arah ortogonal di setiap
tingkat
yang menahan lebih dari 35 persen geser dasar. Jumlah bentang untuk dinding geser
harus dihitung sebagai panjang dinding geser dibagi dengan tinggi tingkat atau dua
kali
panjang dinding geser dibagi dengan tinggi tingkat, sx h , untuk konstruksi rangka
ringan.

Kategori Beban Gempa


B EQX, EQZ tanpa kontribusi gempa pada arah orthogonal
C EQX +/- 0.3*EQZ
D,E,F EQX +/- 0.3*EQZ and Aksial Kolom * 1.2

J. ROAD DESIGN

--------------------------------------------------------------------------
Road Load Asphalt Hotmix Base 1 (Split) Base 2 (Sand/Sirtu)
Class (ton) (cm) (cm) (cm)
--------------------------------------------------------------------------
A 15 10 40 50
B 12.5 7.5 35 40
C 10 5 30 35
D 7.5 3 20 25
--------------------------------------------------------------------------

Simple Village Road


Alt. 1 3 layer of split stone (4-6 cm) mixed with split 2.5cm and sand
Alt. 2 13 cm Split stone + 4 cm coarse sand + 3 cm fine sand

K. WOOD DESIGN

Class Ydry Fb,ult Fcomp,ult


t/m3 kg/cm2 kg/cm2
------------------------------------------
I >= 0.9 >= 1100 >= 650
II 0.9 - 0.6 1100-725 650-425
III 0.6 - 0.4 725-500 425-300
IV 0.4 - 0.3 500-360 300-215
V <= 0.3 <= 360 <= 215