Ultratech Testing Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
152 views1 page

Ultratech Testing Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

JCW - 'Ultratech PPC' Issue Date:01.11.

2023
`

UltraTech Cement
TEST CERTIFICATE
FOR
Customer Details:
DREAMHOME SOLUTIONS Portland Pozzolana Cement
(23-24) AT/PO-BHAGATPUR, (Fly Ash based)
VIA-KOTASAHI(TANGI),
DIST-CUTTACK Tel.:9437128448, Test & Compliance
E-Mail:[email protected]

Particulars Test Results Requirements of


CHEMICAL REQUIREMENTS
IS:1489-2015(Part 1)
4.0(100-X)
32.78 ________ Max
1. Insoluble Residue (% by mass) __________ X+
100
(x = Declared % of Fly Ash)
0.60 X Min
2. Magnesia (% by mass) 1.69
__________ 6.00 Max
3. Sulphuric Anhydride (% by mass) 2.26
__________ 3.50 Max
4. Loss on Ignition (% by mass) 1.52
__________ 5.00 Max
5. Total Chlorides (% by mass) 0.020
__________ 0.10 Max

PHYSICAL REQUIREMENTS
1. Fineness (m2/kg) 341
__________ 300 Min
2. Standard Consistency (%) 31.50
__________
3. Setting Time (minutes)
a.Initial 180
__________ 30 Min
b.Final 260
__________ 600 Max
4. Soundness
a.Le-Chat Expansion (mm) 0.9
__________ 10.0 Max
b.Autoclave Expansion (%) 0.050
__________ 0.8 Max
5. Compressive Strength (MPa)
a.72 +/- 1hr.(3 days) 24.6
__________ 16 Min
b.168 +/- 2 hr.(7 days) UT
__________ 22 Min
c.672 +/- 4 hr.(28 days) UT
__________ 33 Min
6. Drying Shrinkage (%) UT
__________ 0.15 Max
7. % of Fly Ash addition 34.0
__________ 15.0 Min
35.0 Max
The above cement complies with the requirements of
IS:1489-2015(Part 1) for Portland Pozzolana Cement (Fly Ash based)
*Amount of Fly Ash addition in finished cement does not vary
more than +/ - 3% from the declared value.
Date of Dispatch : 01.11.2023
Work Order Ref.: AE/BBS/23-24/BPC/CMNT/0022
HOD(QC)
UltraTech Cement Limited
CIN:L26940MH2000PLC128420
Works:Jharsuguda Cement Works, PO: Arda,District Jharsuguda, Orissa-768202.