CURRICULUM VITAE

Rahul Suresh Bhisikar


Mob No.:+91 9310738059
Email:[email protected]
___________________________________________________________________

BRIEF PROFILE
A versatile, high-energy professional having more than 17 years of experience with merit of executing
prestigious projects of large magnitude within strict time schedule, cost & quality, targeting challenging
assignments in Process Engineering. Sound experience of Ammonia Plant, Hydrogen generation
Plant and refinery Mixed Feed Case (Vacuum Residue feed from CDU,VDU & Clarified Oil from FCC
UNIT & INDIMAX Unit)

EDUCATIONAL QUALIFICATION

POST GRADUATION

Institution : INDIAN INSTITUTE OF TECHNOLOGY, ROORKEE


Degree program : Master of Technology
Stream : Chemical Engineering (Computer Aided Process Plant Design)
Percentage : 71.4 %
Post Graduation : 2005
Year

GRADUATION

Institution : LAXMI NARAYAN INSTITUTE OF TECHNOLOGY, NAGPUR


Degree Program : Bachelor of Technology
Stream : Chemical
Percentage : 60.23 %
Graduation Year : 2002

TECHNICAL SKILLS

 Detail Engineering Activities:


 Review/verification/preparation of PFD & Mass & Energy Balance
 Development of P&ID’s for AFP, AFD & AFC stages
 Line Sizing/Hydraulics (Liquid/ Vapor/ Gas) for Process lines
 Line Sizing/Hydraulics (Liquid/ Vapor/ Gas) for Utility lines viz. Steam (LP/MP/HP), Cooling
Water, BFW, Fuel Gas, Plant Air, Instrument Air, Service Water, Nitrogen.
 Pump Hydraulics for Process Plant & Utility-Residual Plant.
 Compressor Hydraulics for Process Plant & Utility Plant.
 Pressure safety valve (PSVs) calculations & sizing.
 Flare Header & Flare KOD sizing.
 Control valve sizing and calculations.
 Separator sizing.
 Thermal design of heat exchangers.
 Preparation of steam balance & cooling water balance for the ammonia plant.
 Heat exchanger Design and Rating (using HTRI)
 Cooling water network hydraulics using PIPENET Standard software

 Proposal Engineering Activities:


 Verification of BEDP package.
 Verification of FEED package.
 Preparation of technical queries based on BEDP & FEED verification
 Review of ITB specification, viz. BEDB Part-B, Process SOW, Changes to BEDP, Utility
SOW.
 Preorder Process Engineering:
 P&ID mark-up & Critical Package review.
 PDS Mark-up & Critical Package review.
 Hydraulics of critical loops (Pumps, Compressors & Main Utility Headers).
 Performance Guarantee Sheet for Utilities (Power Consumption & Generation,
LP/MP/HP Steam Consumption/Generation, Cooling Water Consumption, Fuel Gas
Consumption, PA/IA/N2 Consumption).
 Preparation of Risk Register.
 Technical evaluation of vendor offers.

 Codes & Standards:


 Standards: API/NACE
 Codes: ASME/ IBR/ TEMA

SOFTWARE SKILL

 Technical Software: HTRI 7.2, ASPENPLUS 8.8, SynerGEE 4.2, PIPENET Standard
Module & Transient Module.

WORK EXPERIENCE (Total Experience: 17 Years)

 Working as Lead Process Engineer in L&T Chiyoda,(Dec 2019 till date)


L&T is a major technology, Design engineering and LSTK contractor engaged in the growth of
the Hydrocarbon, Power, fertilizer and process industries with associated off site and utility
facilities.

Projects & Assignments Handled:

 EPCM service for Residue Up-gradation Facility (RUF) for M/s Hindustan Petroleum
Corporation Ltd (HPCL)
Residue Up-gradation Facility (RUF) is licensed by Chevron Lummus Global (CLG) with a
capacity up-gradation of 3.55 MMTPA
The selected bottoms upgrading technology is Solvent De-asphalting Unit licensed by Kellong
Brown & Root (KBR) with a downstream Slurry Hydrocracker Unit.
Hot clarified oil from FCC-I&II Blended with Vacuum residue feed from CDU-II &III and
Vacuum residue feeds from FCC-I,II&III.
Objective of the RUFD project is to convert Vacuum Residue feed into naphtha, treated fuel
gas, LPG, Stabilized Sour naphtha, Diesel, VGO

 EPCM service for Residue Hydrocracker unit for M/s Indian Oil Corporation Ltd.
Residue Hydrocracker unit (RHCU) is licensed by Axens with capacity up-gradation of 2.5
MMTPA.
Clarified Oil from FCC & Indimax unit is blended with Vacuum residue feed from VDU.
Objective of the RHCU project is to convert Vacuum Residue feed into naphtha, treated fuel
gas, LPG, Stabilized Sour naphtha, Diesel, VGO

 Proposal Engineering for INDMAX Fluid catalytic cracking unit (FCC) for M/s Chennai
Petroleum Corporation Ltd with up-gradation capacity of 2.67 MMTPA

Roles & Responsibilities


 Plan and monitor process engineering activities.
 Review and approval of all Process Deliverables (i.e. Design basis, PFDs, P&IDs,
Philosophies and Narratives, Equipment and Instrument Datasheets, List & Summaries,
Hydraulic and Flare Analysis Report, etc.)
 Suggest value engineering options for cost optimizations.
 Interface with PMC (EIL) and Licensor (CLG/AXENS) as well as package vendors for critical
technical issues.
 Review of Process Licensor Package for inconsistencies, missing information and compliance
to Project Standards/Philosophies
 Monitoring project progress & outstanding issues and ensuring the quality & timeliness of the
deliverables; extending support to team members by proper guidance and sharing technical
know-how.
 Implementing EPC project plans within preset budgets & deadlines; performing site related
tasks including the design, specification & integration of specific works in various
environments
 Engaged in checking and approval of all process documents and providing process input to
other functional departments.
 Interfacing with all functional disciplines and responsible for planning / monitoring of Process
Engineering activities.
 Participated in HAZOP Review, Model Review, Design Review, SIL study etc. for package
item and close-outs for these study recommendations
 Vendor Documents Review for package item.

 Worked as Addl Chief Engineer (Process) in PROJECTS AND DEVELOPMENT INDIA


LIMITED (NOIDA) (Nov 2005-Dec 2019).

Projects and Development India Limited (NOIDA) is a premier design engineering and
consultancy organization engaged in the growth of the fertilizer and allied chemical industries
with associated off site and utility facilities, Oil & Gas Sector viz. Product pipelines, LPG
terminals, Oil terminals, LPG bottling plants, LPG mounded Storages, CGD, Methanol Plants,
Hydrogen plants and various acid plants.

Projects & Assignments Handled

 PMC & Detailed Engineering Service for Ammonia & Urea fertilizer complex HURL Gorakhpur,
Sindri & Barauni.
 Preparation of NIT & selection of LSTK Contractor for Coal Gasification & Ammonia Urea
fertilizer complex Talcher (TFL)
 Preparation of BEDP for Hybrid technology based Heavy water plant HWB Mumbai.
 Preparation of NIT and selection of LSTK Contractor for ammonia urea fertilizer complex HURL
Gorakhpur, Sindri &Barauni
 Augmentation of Offsite & Utilities Fertilizer project, IEPL Nigeria
 Detailed Engineering Service for Energy saving project ammonia & Urea fertilizer complex
IFFCO Phulpur I &II
 Detailed Engineering Service for Energy saving project ammonia & Urea fertiliser complex
IFFCO Aonla I &II
 Selection of process licensor for MFL energy saving project.
 Detailed Engineering service for Energy Saving Schemes in ammonia & Urea TCL Babrala
 Detailed Engineering Service for Feedstock Changeover Project MFL Chennai
 Super Revamp Project Ammonia Urea Casale
 Detailed Engineering Service of Energy Saving Project Ammonia-I , M/s National Fertilizer Ltd.
Vijaipur
 DEC of Capacity enhancement project of Ammonia-II of, M/s National Fertilizer Ltd. Vijaipur
 PMC Services for feedstock changeover project of National Fertilizers Ltd, NFL Nangal
 DFR for the feedstock change over project, capacity enhancement and integration of NMP-I
with Methanol plants & Ammonia plants of M/s National Fertilizer Ltd. Nangal
 Pre-Commissioning and Commissioning of HGU plant CPCL Chennai
 Pre-Commissioning and Commissioning of Ammonia plant NFL Vijaipur line-I
 Implementation of CNG station at Panvel, Kovruu & Mathura for Gail Gas Ltd.
 Detailed Engineering for Delhi City Gas Distribution Project.
 Detailed Engineering services for city gas distribution project Lucknow GA, Green Gas Ltd
Roles & Responsibilities

 Pressure safety valve (PSVs) calculations & sizing


 Pump hydraulics
 Separator sizing
 Control valve sizing and calculations
 Thermal design of heat exchangers
 Preparation of process flow diagram (PFD) .
 Preparation of P&ID for the revamped section
 Preparation of steam balance & cooling water balance for the ammonia plant
 Line sizing, Line Hydraulics.
 Plant simulation using Aspen Plus Software.
 Heat exchanger Design and Rating (using HTRI)
 Cooling water network hydraulics using PIPENET Standard software

Declaration

I hereby declare that the above mentioned information is true to the best of my knowledge and