Evbms Projects em
Evbms Projects em
Instructions
1. All students must take one project. No Group projects must be submitted.
2. In case there are more than 20 students the rest of the students will use the same list on
rotational basis.
3. The project should be submitted as pdfs or PowerPoint presentations
4. Duration of the project: to be completed in 10 days from date of receipt of the project.
5. The Project holds 75 marks for evaluations.
6. An additional assessment of 25 marks will be an online mcq test.
TABLE 4: LIST OF FINAL PROJECTS (20 PROJECTS THAT COMPREHENSIVELY COVER ALL THE LEARNING OUTCOME)
Assess the current state of EV battery management technologies and identify areas for
LALITHAKUMARI T improvement.
Battery Performance Testing Setup Presentation: Presentation detailing the setup and
methodology for testing battery performance, including parameters measured and data
POOVARASI V analysis techniques used.