Test Plan Template

Test Plan for


[Project Name]
Date

Changelog

Version Change Date By Description

Version No. Date of Change PiC of the change Description of the


changes made
1 INTRODUCTION
1.1 SCOPE
1.1.1 In Scope
1.1.2 Out of Scope
1.2 QUALITY OBJECTIVE
1.3 ROLES AND RESPONSIBILITIES
2 TEST METHODOLOGY
2.1 OVERVIEW
2.2 TEST LEVELS
2.3 BUG TRIAGE
2.4 SUSPENSION CRITERIA AND RESUMPTION REQUIREMENTS
2.5 TEST COMPLETENESS
3 TEST DELIVERABLES
4 RESOURCE & ENVIRONMENT NEEDS
4.1 TESTING TOOLS
4.2 TEST ENVIRONMENT
5 TERMS/ACRONYMS
3

1. Introduction
Brief introduction of the test strategies, process, workflow and methodologies used for
the projec
1.1. Scope
1.1.1. In Scope
Scope defines the features, functional or non-functional requirements of the
software that will be tested
1.1.2. Out of Scope
Out of Scope defines the features, functional or non-functional requirements of
the software that will NOT be tested.
1.2. Quality Objective
Here make a mention of the overall objective that you plan to achieve without your
testing.
 Some objectives of your testing project could be
 Ensure the Application Under Test (AUT) conforms to functional and
nonfunctional requirements
 Ensure the AUT meets the quality specifications defined by the client
 Bugs/issues are identified and fixed before go live
1.3. Roles and Responsibilities
Detail description of the Roles and responsibilities of different team members like
 QA Analyst
 Test Manager
 Configuration Manager
 Developers
 Installation Team
 Amongst others
2. Test Methodology
2.1. Overview
Mention the reason for adopting a particular test methodology for the project.
The methodology selected depends on multiple factors.
 WaterFall
 Iterative
 Agile
2.2. Test Levels
Test Levels define the Types of Testing to be executed on the Application Under
Test (AUT). The Testing Levels primarily depends on the scope of the project,
time and budget constraints.
2.3. Bug Triage
The goal of the triage is to
 To define the type of resolution for each bug
 To prioritize bugs and determine a schedule for all “To Be Fixed Bugs’.
2.4. Suspension Criteria and Resumption Requirements
Suspension criteria define the criteria to be used to suspend all or part of the
testing procedure while Resumption criteria determine when testing can resume
after it has been suspended
2.5. Test Completeness
Here you define the criterias that will deem your testing complete.
For instance, a few criteria to check Test Completeness would be
 100% test coverage
 All Manual & Automated Test cases executed
 All open bugs are fixed or will be fixed in next release
3. Test Deliverables
Here mention all the Test Artifacts that will be delivered during different phases of
the testing lifecycle.
Here are the sample deliverables
 Test Plan
 Test Cases
 Requirement Traceability Matrix
 Bug Reports
 Test Strategy
 Test Metrics
 Customer Sign Off
5

4. Resource & Environment Needs


4.1. Testing Tools
Make a list of Tools like
 Requirements Tracking Tool
 Bug Tracking Tool
 Automation Tools
Required to test the project
4.2. Test Environment
It mentions the minimum hardware requirements that will be used to test the Application.
Following software is required in addition to client-specific software.
● Windows 8 and above
● Office 2013 and above
● MS Exchange, etc.

5. Terms/Acronyms
Make a mention of any terms or acronyms used in the project
Term/ Acronym Definition

API Application Program Interface

AUT Application Under Test