Opm655 - Individual Assignment
Opm655 - Individual Assignment
COURSE:
PROJECT MANAGEMENT (OPM655)
PREPARED FOR:
MADAM NORRAEFFA BINTI MD TAIB
TOPIC:
INDIVIDUAL ASSIGNMENT 1
PREPARED BY:
SUBMISSION DATE:
5 May 2023
ACKNOWLEDGMENT
In the name of Allah, the most Beneficent and the Most Merciful, I would like to give special
gratitude to Allah SWT.
As students of Bachelor in Office System Management with course code BA232 from
Faculty Business and Management at UiTM Malacca City Campus, for course Project
Management (OPM655). In accomplishment this assignment, I would like to take the
assistance and rule of some regarded people, who merit our most prominent appreciation.
The fulfilment of this assignment gives us much delight. I want to demonstrate appreciation
to Madam Norraeffa Binti Md Taib for giving me a helpful guideline for this assignment all
through various discussions. All the guidance given in completing this project is highly
appreciated.
At last, but not least, thank you to all parties who have helped me directly and
indirectly in the success of this course work. I would like to value the direction given by other
individuals just as the boards particularly in this assignment that has improved my skills and
abilities.
Thank you.
1
TABLE OF CONTENT
ACKNOWLEDGMENT ......................................................................................................... 1
TABLE OF CONTENT .......................................................................................................... 2
1.0 EXECUTIVE SUMMARY ................................................................................................ 3
2.0 PROJECT INFORMATION ........................................................................................ 4
2.1 Project Scopes ................................................................................................... 4-6
2.2 Work Breakdown Structure .................................................................................. 7
2.3 Gantt Chart ............................................................................................................ 8
2.3.1 JUNE 2023 ...................................................................................................... 8
2.3.2 JULY 2023 ...................................................................................................... 8
3.0 CONCLUSION ................................................................................................................ 9
4.0 REFERENCES ............................................................................................................. 10
5.0 APPENDICES .......................................................................................................... 11-26
2
1.0 EXECUTIVE SUMMARY
In this individual assignment, I got a task from my lecturer to do a written report. The
assignment is about Chapter 3 Project Plans. The resource that I must get is from the
website www.eperolehan.gov.my/quotation-tender-notice to get the "sebut harga" tender
notice. The tender that I chose for my assignment is " PERKHIDMATAN MEMOTONG
RUMPUT DAN MENCUCI LONGKANG MARKAS ANGKATAN BERSAMA BAGI BULAN
JUN DAN JULAI 2023". There are three elements that I must accomplish to finish this
assignment.
Firstly, are the project scopes. Project scope is the part of project planning that
involves determining and documenting a list of specific project goals, deliverables, tasks,
costs and deadlines (Lutkevich et al., 2021). It explains the boundaries of the project,
establishes responsibilities for each team member and sets up procedures for how
completed work will be verified and approved. This documentation assists the project team
in staying focused and on task during the project. At Dewan Gabungan Markas Angkatan
Bersama, Markas Angkatan Bersama, Kuantan, Pahang.
Next, there are work breakdown structures (WBS). A Work Breakdown Structure
(WBS) is the tool that utilizes this technique and is one of the most important project
management documents (Roger, 2023). The WBS's primary objective is to plan the project's
timetable. Each task's duration is calculated along with its preceding and following tasks. A
general plan is then provided by the WBS so that the project manager may see how the
project should proceed and effectively manage the workflow. WBS is crucial in this project to
ensure that the tasks can be accomplished and finished in the allocated period. The Gantt
cart is the last option.
Besides, Gantt chart is the most widely used chart in project management. These
charts are useful in planning a project and defining the sequence of tasks that require
completion (Grant, 2023). Typically, it is divided into two sections: a list of chores on the left
and a timetable with scheduling bars on the right. The Gantt chart can show task start and
finish dates, milestones, task dependencies, and assignees. A Gantt chart can assist in
making sure that everyone involved in this project completes their tasks on time and without
slack.
To sum up, the purpose of this assignment is to show that I comprehend the material
covered in Chapter 3 Project Plans. I will gain a better understanding of the project scopes,
WBS function, and Gantt cart objectives with this assignment. These components are crucial
for completing a work in a methodical and controllable manner.
3
2.0 PROJECT INFORMATION
2.1 Project Scopes
● A detailed task schedule that breaks down each task and sub-
task required for the project. It should include timelines and
milestones for each task.
● A quality control plan that outlines the quality standards for the
project, and the methods for ensuring that those standards are
met.
Project Deliverables
● A plan for measuring customer satisfaction with the project, and
the methods for addressing any customer complaints or issues.
4
● The lawn should be mowed to an even height and with no
missed spots or patches.
● The edges of the lawn should be trimmed neatly.
● The clippings should be cleaned up and removed from the
property or properly disposed of.
● The equipment should not cause any damage to the property or
landscaping.
Acceptance Criteria ● The drain is fully unclogged and water flows freely through it.
● Any debris or build-up in the drain is completely removed.
● The drain is checked to ensure there are no remaining clogs or
issues.
● The surrounding area is clean and free of any debris or residue
from the cleaning process.
● The customer is satisfied with the overall appearance and
performance of the lawn and drain after the cleaning service.
5
determine the method and tools needed to clear the drain,
which may impact the timeline and cost of the service.
• Access: The location and accessibility of the drain may
affect the service provider's ability to reach and clear the
blockage.
• Safety: The service provider may need to take extra
precautions to ensure their safety and the safety of others
during the cleaning process.
• Type of drain: Different types of drains require different
cleaning techniques, so the service provider's expertise and
equipment may need to match the specific drain type.
• Environmental considerations: The use of certain cleaning
agents may be restricted in some areas due to
environmental regulations.
• Availability: The service provider's availability may be
limited during peak season or due to scheduling conflicts.
● Lawn mowing and drain cleaning services can be performed in
safe and reasonable weather conditions. If weather conditions
are not suitable, the service provider and the client will agree
Assumptions on a mutually convenient.
● The size of the lawn is within the scope of the service provider's
capabilities and equipment.
6
2.2 Work Breakdown Structure
Figure 1 – WBS
7
2.3 Gantt Chart
2.3.1 Figure 2 - JUNE 2023
ESTIMATED WEEK 1 (JUNE 2023) WEEK 2 (JUNE 2023) WEEK 3 (JUNE 2023) WEEK 4 (JUNE 2023) WEEK 5 (JUNE 2023)
TASK PERSON IN CHARGE DURATION M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
(DAYS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Cleaning and mowing NAIM 5
Mowing guard station FAKHRI 4
Mowing office area FAKHRI 4
Drain cleaning NAIM 5 P
Handling a machinery AMIRUDDIN 1 U
Refueling a petrol-powered lawn mower SENIN 4 B
Lawn mower engine lubricant SENIN 4 L
I
Machine handling EZRA 1
C
Equipment maintenance AIMAN 1
Equipment checklist ZAMRI 1
H
Preparing cleaning chemical SARAH 3
O
Preparing solid chemical TAN HOK SIN 3 L
Preparing liquid chemical SYAFIQ 3 I
Workforce requirement LUQMAN 1 D
Employment safety monitoring HATISH 6 A
Supervise the employees JAMAL 1 Y
Final report RASHID 1
Attendance report ISA 6
Maintenance report SALLEH 1
8
3.0 CONCLUSION
Hence, as for the Gantt chart, it helps the project team to plan work around deadlines
and properly allocate resources. The Gantt chart also makes complex plans easier to
understand, especially when there are multiple teams involved and there are moving
deadlines. The task in the Gantt chart has been taken from level 2 of WBS which includes
mowing and cleaning office and drain, refuelling a petrol and lubricant, equipment
maintenance and many more. Furthermore, the task has been divided into 2 months with 5
weeks in each month from June until July in the Gantt chart. Besides, the task is repeated
for every month in those 2 months.
Therefore, the project manager should always note the project with such information
in order to improve project management. Additionally, effective scope management
demands effective communication, which guarantees that everyone on the project team is
aware of the project's scope and concurs on how its objectives will be met.
9
4.0 REFERENCES
Grant, M. (2023, May 2). Gantt charting: Definition, benefits, and how they're used.
Investopedia. Retrieved May 5, 2023, from
https://www.investopedia.com/terms/g/gantt-chart.asp
Landscape, B. (2019, September 17). What is the difference between lawn care and lawn
maintenance? Borst Landscape & Design. Retrieved May 5, 2023, from
https://www.borstlandscape.com/articles/difference-between-lawn-care-and-lawn-
maintenance/
Lawn Care. (2023). 6 lawn care advertising examples that'll inspire your marketing. Jobber.
Retrieved May 5, 2023, from https://getjobber.com/academy/lawn-care/lawn-care-
advertising-examples/
Lutkevich, B., Pratt, M. K., & Lebeaux, R. (2021, September 30). What is project scope?
CIO. Retrieved May 5, 2023, from
https://www.techtarget.com/searchcio/definition/project-scope
10
5.0 APPENDICES
11
Figure 5: Offer Statement
12
Figure 6: Bidder’s Declaration Letter
13
Figure 7: Bidder’s Declaration Letter
14
Figure 8: Delivery Address
15
Figure 9: Specification
16
Figure 10: Specification
17
Figure 11: Acceptance Letter
18
Figure 12: Acceptance Letter
19
Figure 13: Acceptance Letter
20
Figure 14: Acceptance Letter
21
Figure 15: Acceptance Letter
22
Figure 16: Acceptance Letter
23
Figure 17: Contract Details
24
Figure 18: Contract Details
25
Figure 18: Contract Details
26