The document provides instructions for properly positioning, installing, and maintaining a unit. Key steps include using anti-vibration supports on a level cement base, ensuring proper clearances around the unit for ventilation and maintenance, and lifting the unit carefully using designated lifting points.
The document provides instructions for properly positioning, installing, and maintaining a unit. Key steps include using anti-vibration supports on a level cement base, ensuring proper clearances around the unit for ventilation and maintenance, and lifting the unit carefully using designated lifting points.
The document provides instructions for properly positioning, installing, and maintaining a unit. Key steps include using anti-vibration supports on a level cement base, ensuring proper clearances around the unit for ventilation and maintenance, and lifting the unit carefully using designated lifting points.
The document provides instructions for properly positioning, installing, and maintaining a unit. Key steps include using anti-vibration supports on a level cement base, ensuring proper clearances around the unit for ventilation and maintenance, and lifting the unit carefully using designated lifting points.
The unit must be installed on a solid, perfectly level
base. For earthing purposes, a solid cement base, that is wider than the unit, must be made. This base must be able to support the weight of the unit. Anti-vibration supports must be installed between the frame of the unit and the cement base of the steel beams; for such installation follow the dimensional drawing supplied with the unit. The frame of theunit must be perfectly levelled during installation, if necessary using shims to be inserted under the the anti-vibration supports. Before first start-up, the installation must be confirmed as being level and horizontal using a laser level or another suitable instrument. Any error in the level and horizontal position must not be greater than 5 mm per unit up to 7 metres and 10mm per unit over 7 metres. If the unit is installed in places that are easily accessible to people and animals, we recommend that protection grates are fitted all round to prevent access. To ensure optimal performance in installation site, the following precautions and instructions must be respected: - Make sure that there is a strong, solid foundation to reduce noise and vibrations. - Avoid installing the unit in areas that could be dangerous during maintenance operations, such as platforms without handrails, guide rails or in areas that fail to comply with requirements as regards free space around the unit. The installer is responsible for calculating the best position for the unit. It is vital that all minimum distances for all units are complied with to ensure there is adequate ventilation for the condenser racks. When deciding where to position the unit and to ensure Noise proper airflow, the following factors must be taken into The noise generated by the unit is mainly due to the consideration: rotation of compressors. avoid the recirculation of hot air The noise level for each model size is listed in sales avoid insufficient air supply for the air cooling documentation. condenser. If the unit is correctly installed, operated and Both these conditions can cause an increase in maintained, noise emission levels do not require any condenser pressure which can lead to poor energy special protective devices to operate continuously close efficiency and refrigerating capacity. to the unit without any risk. If two or more units are positioned alongside each In case of installation with special noise requirements it other, we recommend leaving a space of at least 3600 may be necessary to install additional noise softening millimetres between condenser racks. Each side of the devices. unit must be accessible for post-installation maintenance work. Handling and lifting It is therefore vital that the minimum access distances in front of the electrical panel are complied with: 1500 mm. The unit must be lifted with the utmost care and The manufacturer cannot be expected to consider all attention, following the lifting instructions shown on the these factors. In the unit design stage, we therefore label applied to the electric panel. Lift the unit very recommend that you consult an authorised slowly, keeping it perfectly level. manufacturer representative for further solutions. Avoid bumping and/or shaking the unit during handling and loading/unloading operations from the transportation vehicle, push or pull the unit only using Figure 3 - Distances to be complied with: the base frame. Secure the unit inside the truck to prevent it from moving and causing damage. Do not allow any part of the unit to fall during loading/unloading. All units have lifting points. Only these points may be used for lifting the unit, as shown in the following figure. Handling and lifting with a fork lift is the only alternative method.
Both the lifting ropes and the spacing bars must
be strong enough to support the unit safely. Check the weight of the unit on its name plate, because