CADANGAN MEMBINA DAN MENYIAPKAN BEBERAPA TAPAK MESIN STAMPING UNTUK TETUAN

SURIA COMPONENT MANUFACTURING SDN BHD DI LOT 356, JALAN TUDM,


PEKAN BARU SUBANG, SHAH ALAM, SELANGOR DE.
Quotation No: Q06a/SR/23

Item Description Qty Unit U/Price RM Price RM

A PRELIMINARIES
1 Mobilisation and demobilisation of labour, equipment, 1 LS 6,000.00 6,000.00
shop drawing, site marking, protection to surrounding,
clearing and cleaning.

2 Cart away unsuitable material ex. Loose Concrete and soil 1 LS 10,000.00 10,000.00
from excavation to dumping site c/w Pejabat Tanah dan
Galian permit and docket

B PAD FOOTING
Note
Cutting existing slab - separate existing floor using engine
powered concrete cutter
Breaking/Hacking - break/hack existing floor to construct
new pad using hydraulic breaker
Piling - supply and drive 200mm X 200mm concrete pile
c/w PDA pile test report
Excavate to sub-base level - excavate approximately 1.0
mtr depth to lay crusher run and lean con
Cut pile and expose T bars - cut pile to required level and
hack to expose T bar reinforcement
400 mm crusher run - lay 2 in size crusher run at 400mm
thick and compact
50 mm Lean concrete - lay 50mm sand and cement to
cover crusher run surface
DPM cover- Damp Proof Membrane
Y 16 and Y 20 reinforcement - lay Y16 and Y20
reinforcement bar at 175 mm C/C
Expension joint material - 75mm Polyurethane sponge to
separate new pad from existing slab
Grade 30 ready mix concrete - pour, vibrate c/w curing
membrane

1.0 300 TON


1.1 SIZE L5.5 mtr X W 3.3 mtr x D 0.65 mtr
a Cutting existing slab 17.6 mtr 72.00 1,267.20
b Breaking/Hacking 18.15 m2 130.00 2,359.50
c Piling 16 point 16 no 857.00 13,712.00
d Excavate to sub-base level 10.06 m3 37.00 372.22
e Cut pile and expose T bars 12 no 75.00 900.00
f 400 mm crusher run 7.6 m3 48.00 364.80
g 50 mm Lean concrete 0.9 m3 310.00 279.00
h DPM cover 18.15 m2 38.00 689.70
i Y 16 and Y 20 reinforcement 1721.8 kg 11.50 19,800.70
j Expension joint material 17.6 mtr 60.00 1,056.00
k Grade 30 ready mix concrete @ 600mm thk 5.7 m3 370.00 2,109.00
l Formwork for maintenance pit 17 m2 300.00 4,250.00
m Monkey ladder 1 no 1,800.00 1,800.00
n New uncoiler concrete base c/w reinforcement 1 no 5,400.00 5,400.00
2.0 250 TON
2.1 SIZE L 7.3 mtr X W 2.5 mtr X D 0.65 mtr
a Cutting existing slab 19.6 mtr 72.00 1,411.20
b Breaking/Hacking 18.25 m2 130.00 2,372.50
c Piling 8 point 8 no 857.00 6,856.00
d Excavate to sub-base level 19.1 m3 37.00 706.70
e Cut pile and expose T bars 12 no 75.00 900.00
f 400 mm crusher run 7.3 m3 48.00 350.40
g 50 mm Lean concrete 0.91 m3 310.00 282.10
h DPM cover 7.29 m2 38.00 277.02
i Y 16 and Y 20 reinforcement 927.2 kg 11.50 10,662.80
j Expension joint material 10.8 mtr 60.00 648.00
k Grade 30 ready mix concrete @600mm thk 7.3 m3 370.00 2,701.00
l New uncoiler concrete base c/w reinforcement 1 no 5,400.00 5,400.00

3.0 200 TON


3.1 SIZE L 30.7 mtr X W3.1 mtr X D 0.65 mtr
a Cutting existing slab 67.6 mtr 72.00 4,867.20
b Breaking/Hacking 95.17 m2 130.00 12,372.10
c Piling 30 30 no 857.00 25,710.00
d Excavate to sub-base level 96.12 m3 37.00 3,556.44
e Cut pile and expose T bars 30 no 75.00 2,250.00
f 400 mm crusher run 38.06 m3 48.00 1,826.88
g 50 mm Lean concrete 4.75 m3 310.00 1,472.50
h DPM cover 95.17 m2 38.00 3,616.46
i Y 16 and Y 20 reinforcement 4884.5 kg 11.50 56,171.75
j Expension joint material 19.34 mtr 60.00 1,160.40
k Grade 30 ready mix concrete 38.06 m3 370.00 14,082.20

3.2 SIZE L 6.0 mtr X W 2.5 mtr X D 0.65


a Cutting existing slab 17 mtr.r 72.00 1,224.00
b Breaking/Hacking 15 m2 130.00 1,950.00
c Piling 6 point 6 no 857.00 5,142.00
d Excavate to sub-base level 15.15 m3 37.00 560.55
e Cut pile and expose T bars 8 no 75.00 600.00
f 400 mm crusher run 6 m3 48.00 288.00
g 50 mm Lean concrete 0.75 m3 310.00 232.50
h DPM cover 15 m2 38.00 570.00
i Y 16 and Y 20 reinforcement 773.4 kg 11.50 8,894.10
j Expension joint material 17 mtr 60.00 1,020.00
k Grade 30 ready mix concrete 6 m3 370.00 2,220.00
4.0 150 TON
4.1 SIZE L 7.8 mtr X W 2.9 mtr X D 0.3 mtr
a Cutting existing slab 21.4 mtr 72.00 1,540.80
b Breaking/Hacking 22.62 m2 130.00 2,940.60
c Piling 10 point 10 no 857.00 8,570.00
d Excavate to sub-base level 16.9 m3 37.00 625.30
e Cut pile and expose T bars 10 no 75.00 750.00
f 400 mm crusher run 9.04 m3 48.00 433.92
g 50 mm Lean concrete 1.13 m3 310.00 350.30
h DPM cover 22.62 m2 38.00 859.56
i Y 16 and Y 20 reinforcement 1127.5 kg 11.50 12,966.25
j Expension joint material 21.4 mtr 60.00 1,284.00
k Grade 30 ready mix concrete 6.78 m3 370.00 2,508.60

5.0 110 TON


5.1 SIZE L 9.4 mtr X W 2.7 mtr X D 0.3
a Cutting existing slab 24.2 mtr 72.00 1,742.40
b Breaking/Hacking 25.38 m2 130.00 3,299.40
c Piling 16 point 16 no 857.00 13,712.00
d Excavate to sub-base level 19.03 m3 37.00 704.11
e Cut pile and expose T bars 16 no 75.00 1,200.00
f 400 mm crusher run 10.15 m3 48.00 487.20
g 50 mm Lean concrete 1.26 m3 310.00 390.60
h DPM cover 25.38 m2 38.00 964.44
i Y 16 and Y 20 reinforcement 1221.6 kg 11.50 14,048.40
j Expension joint material 24.2 mtr 60.00 1,452.00
k Grade 30 ready mix concrete 7.61 m3 370.00 2,815.70

5.2 SIZE L 2.7 mtr X W 2.2mtr X D 0.3 mtr


a Cutting existing slab 9.8 mtr 72.00 705.60
b Breaking/Hacking 5.94 m2 130.00 772.20
c Piling 4 point 4 no 857.00 3,428.00
d Excavate to sub-base level 4.45 m3 37.00 164.65
e Cut pile and expose T bars 4 no 75.00 300.00
f 400 mm crusher run 2.37 m3 48.00 113.76
g 50 mm Lean concrete 0.29 m3 310.00 89.90
h DPM cover 5.94 m2 38.00 225.72
i Y 16 and Y 20 reinforcement 367 kg 11.50 4,220.50
j Expension joint material 9.8 mtr 60.00 588.00
k Grade 30 ready mix concrete 1.78 m3 370.00 658.60

6.0 Die rack roller track 26 no 680.00 17,680.00

Sub-Total 349,307.43
Less: Discount 3% 10,479.22

Add: Tax 0%
Total Value of this Quotation (Ringgit Malaysia)
Three Hundred Thirty-Eight Thousand Eight Hundred Twenty-Eight and Sen
GRAND TOTAL 338,828.21
Twenty-one only
Terms and Conditions
1. Quantities shown are All Provisional and shall be subjected to final measurement on site.
2. Items not priced in this Quotation shall be submitted to Client for budget approval.
3. This Quotation is valid up to thirty (30) days only from the date of Quotation.
4. Payment Term:
4.1) 60% Deposit upon confirmation - Early works including piling
4.2) 35% Progress claim before concreting
4.3) 5% 90 days retention
5. Kindly remit payment to BUILDTEC SDN BHD (MBB 5627 8609 8470) within 14 days from date of our Invoice

Prepared by; Approved by;


for BUILDTEC SDN BHD

NURUL ADILAH M BAKHTIYAR (Client's signature & Company stamp)


Director/ Authorised Signatory