A PRELIMINARIES
1 Mobilisation and demobilisation of labour, equipment, 1 LS 6,000.00 6,000.00
shop drawing, site marking, protection to surrounding,
clearing and cleaning.
2 Cart away unsuitable material ex. Loose Concrete and soil 1 LS 10,000.00 10,000.00
from excavation to dumping site c/w Pejabat Tanah dan
Galian permit and docket
B PAD FOOTING
Note
Cutting existing slab - separate existing floor using engine
powered concrete cutter
Breaking/Hacking - break/hack existing floor to construct
new pad using hydraulic breaker
Piling - supply and drive 200mm X 200mm concrete pile
c/w PDA pile test report
Excavate to sub-base level - excavate approximately 1.0
mtr depth to lay crusher run and lean con
Cut pile and expose T bars - cut pile to required level and
hack to expose T bar reinforcement
400 mm crusher run - lay 2 in size crusher run at 400mm
thick and compact
50 mm Lean concrete - lay 50mm sand and cement to
cover crusher run surface
DPM cover- Damp Proof Membrane
Y 16 and Y 20 reinforcement - lay Y16 and Y20
reinforcement bar at 175 mm C/C
Expension joint material - 75mm Polyurethane sponge to
separate new pad from existing slab
Grade 30 ready mix concrete - pour, vibrate c/w curing
membrane
Sub-Total 349,307.43
Less: Discount 3% 10,479.22
Add: Tax 0%
Total Value of this Quotation (Ringgit Malaysia)
Three Hundred Thirty-Eight Thousand Eight Hundred Twenty-Eight and Sen
GRAND TOTAL 338,828.21
Twenty-one only
Terms and Conditions
1. Quantities shown are All Provisional and shall be subjected to final measurement on site.
2. Items not priced in this Quotation shall be submitted to Client for budget approval.
3. This Quotation is valid up to thirty (30) days only from the date of Quotation.
4. Payment Term:
4.1) 60% Deposit upon confirmation - Early works including piling
4.2) 35% Progress claim before concreting
4.3) 5% 90 days retention
5. Kindly remit payment to BUILDTEC SDN BHD (MBB 5627 8609 8470) within 14 days from date of our Invoice