Products and services are often the first thing that customers see of a company, so they should
have an impact. And although operations managers may not have direct responsibility for product
and service design, they always have an indirect responsibility to provide the information and
advice upon which successful product or service development depends. But increasingly
operations managers are expected to take a more active part in product and service design. Unless
a product, however well designed, can be produced to a high standard, and unless a service,
however well conceived, can be implemented, the design can never bring its full benefits.
28
To develop new products or services as alternatives to downsizing.
To design products/services that have customer appeal
To increase quality and level of customer satisfaction
NB: Sometimes product or service design is actually redesign for a number of reasons such as
customer complaints, excessive warranty claims, low demand etc.
3.1.3. Product Design
Product design is the process of defining all the features and characteristics of just about
anything you can think of. Consumers respond to a product‘s appearance, color, texture, and
performance. All of its features, summed up, are the product‘s design. Someone came up with the
idea of what this product will look like, taste like, or feel like so that it will appeal to you. This is
the purpose of product design.
Product design is also defined as: ‘a product‘s characteristics, such as its appearance, the
materials it is made of, its dimensions and tolerances, and its performance standards’.
3.1.3.1. Philosophies Towards Product Design and Development
There are three fundamentally different ways to introduce new products.
i. Market pull: the market is the primary basis for determining the products a firm should make
with little regard to the existing technology. Customer’s wants and needs play the primary role
for new product development and design. A firm should make what it can sell. So it is required
to undertake customers’ survey and market research to determine customer’s need.
ii. Technology push philosophy: technology is the primary determinant of the product that the
firm should make with little regard for the market. One should sell what can be produced i.e.
the existing technology determine what kind of product to be produced .The assumption is that
the firm should pursue a technology based advantages by developing superior technology and
products. The products are pushed to the market and the marketing’s job is to create demand
for these superior products.
iii. Inter functional philosophy: stated that product design and development is neither market
pull nor technology push. Rather it is inter functional and interactive process of customers,
marketing, finance, engineering and other related functional areas.
29
3.1.3.2. Product Development Process (Phases)
To get to a final design of a product or service, the design activity must pass through several key
stages. These form an approximate sequence, although in practice designers will often recycle or
backtrack through the stages. The basic stages of product/service design are the following
1. Idea generation 5. Prototype Testing
2. Feasibility analysis 6. Final Product Design
3. Initial (Preliminary) Product 7. Product introduction
Design 8. Follow-up evaluation
4. Prototype development
Let’s discuss each of them
1. Concept (idea) Generation
The ideas for new product or service concepts can come from sources outside the organization,
such as customers or competitors, and from sources within the organization, such as staff (for
example, from sales staff and front-of-house staff) or from the R&D department.
a) Ideas from customers: Marketing, the function generally responsible for identifying new
product or service opportunities, may use many market research tools for gathering data from
customers in a formal and structured way, including questionnaires and interviews. Listening to
the customer, in a less structured way, is sometimes seen as a better means of generating new ideas.
Focus groups, for example, are one formal but unstructured way of collecting ideas and
suggestions from customers.
b) Ideas from competitor activity: All market-aware organizations follow the activities of
their competitors. A new idea may give a competitor an edge in the marketplace, even if it is only
a temporary one, then competing organizations will have to decide whether to imitate or
alternatively to come up with a better or different idea.
Sometimes this involves reverse engineering that is, taking apart a product to understand how a competing
organization has made it.
c) Ideas from staff: The contact staff in a service organization or the salesperson in a product-
oriented organization could meet customers every day. These staff may have good ideas about
what customers like and do not like.
d) Ideas from research and development: One formal function found in some organizations
is research and development. Research usually means attempting to develop new knowledge and
30
ideas in order to solve a particular problem or to grasp an opportunity. Development is the attempt
to utilize and operationalize the ideas that come from research.
2. Concept Screening (Feasibility Analysis)
Not all concepts which are generated will necessarily be capable of further development into
products and services. The purpose of the concept-screening stage is to take the flow of concepts
and evaluate them. Evaluation in design means assessing the worth or value of each design option,
so that a choice can be made between them. This involves assessing each concept or option against
a number of design criteria. Major criteria are the following:
• Market feasibility: evaluate the new ideas in terms of whether the product has market or not,
• Financial (economic) feasibility: how well the product quality performance and costs confirm
to the design objectives and,
• Technical feasibility: availability of technology and skilled labor.
At last, the most feasible and viable product concept is selected for the next stages.
3. Initial (Preliminary) Product Design
This stage of the product-design process is concerned with developing the best design for the new
product ideas. It is the translation of ideas in to products. Preliminary product design must specify
the product completely. At the end of the product design phase, the firm has a set of product
specifications and engineering drawing (or computer image) specified in sufficient detail that
production prototype can be built and tested. In the preliminary design tradeoffs between cost,
quality and product performances are considered.
4. Prototype Construction
If the preliminary product design is approved, a prototype/s may be built for further testing and
analysis. Several prototypes which closely resembles with the final products may be made by hand
from some artificial materials such as plastics, mud, clay, wood etc. For example, the auto industry
regularly makes clay models of new automobiles.
5. Prototype Testing:
A model is tested for its physical properties or uses under actual operating conditions. Testing of
prototypes is aimed at verifying marketing and technical performance. The purpose of a test market
is to gather quantitative data on customer acceptance of the new product. Prototype is also tested
for technical product performance. In general, such testing is important in uncovering any
problems and correcting them prior to full scale production. For example, auto manufacturer
31
perform extensive road tests on new models; similar experiments are performed on tires, airplanes,
and sports equipment.
6. Final Product Design
Prototype testing may indicate certain changes in the preliminary product design. If changes are
made the product may be tested further to ensure final product performance. Market test is used to
determine the extent of consumer acceptance. If this market test is unsuccessful, return to the
design review phase (this phase is handled by marketing). During the final phase these changes
are incorporated in to the design specification. Drawing and specifications for the product are to
be developed at this stage. And go for full scale operations.
7. Product Introduction: this stage is used to promote the product; handled by marketing
8. Follow-up Evaluation: it helps to determines if changes are needed & refine forecasts;
handled by marketing.
3.1.3.3. Issues in Product and Service Design
This sub unit addresses factors (techniques) to be considered while designing the product.
32
Legal and Ethical Considerations
Designers are often under pressure to Speed up the design process and Cut costs. These pressures
force trade-off decisions.
- Product Liability - A manufacturer is liable for any injuries or damages caused by a
faulty product.
- Uniform Commercial Code – Says that products carry an implication of
merchantability and fitness; i.e., a product must be usable for its intended purpose.
Designers Adhere to Guidelines
• Produce designs that are consistent with the goals of the company
• Give customers the value they expect
• Make health and safety a primary concern
• Consider potential harm to the environment
Strategies for product or service life cycle
Another factor in product design is the stage of the life cycle of the product. Most products go
through a series of stages of changing product demand called the product life cycle. There are
typically four stages of the product life cycle: introduction, growth, maturity, and decline.
The product life cycle can be quite short for certain products, as seen in the computer industry.
For other products it can be extremely long, as in the aircraft industry. A few products, such
as paper, pencils, nails, milk, sugar, and flour, do not go through a life cycle. However, almost all
products do, and some may spend a long time in one stage.
Growth
❑ Maturity
▪ Relatively few design changes
34
❑ Decline
▪ Continue or discontinue product or
service
▪ Identify alternative uses for
product or service
▪ Continued emphasis on high
productivity and low cost
35
✓ Opportunities for long production runs and automation
✓ Need for fewer parts justify increased expenditures on perfecting designs and
improving quality control procedures.
Designing for mass customization
A strategy of producing standardized goods or services, but incorporating some degree of
customization. Tactics make it possible are:
• Delayed differentiation: is a postponement tactic; producing but not quite completing a
product or service until customer preferences or specifications are known
• Modular Design: is a form of standardization in which component parts are subdivided into
modules that are easily replaced or interchanged. It allows: Easier diagnosis and remedy of
failures, easier repair and replacement, simplification of manufacturing and assembly. It makes
possible to have relatively high product variety and low component variety at the same time.
The basic idea is to develop a series of basic product components (or modules) which can be
assembled in to a large number of different products..
Reliability
Reliability: The ability of a product, part, or system to perform its intended function under a
prescribed set of conditions
Failure: Situation in which a product, part, or system does not perform as intended.
Normal operating conditions: The set of conditions under which an item’s reliability is specified.
Range of Operating Condition
▪ Robust Design: Design that result in products or services that can function over a broad
range of conditions. Product is designed so that small variations in production or assembly
do not adversely affect the product. Typically results in lower cost and higher quality.
▪ Cultural difference: designer must take into account any differences of different country.
▪ Degree of newness: product design change can range from modification of an existing to
an entirely new product.
1. Modification of an existing product/service
2. Expansion of an existing product/service
3. Clone of a competitor‘s product/service
4. New product/service
36
Degree of Design Change
37
maintaining all functions and quality requirements. It does this largely by identifying and
eliminating hidden, invisible, and unnecessary cost. VE & VA should not be treated as a mere
cost reduction techniques or cheapening of the product. It is more comprehensive and the
improvement in value is attained without any sacrifices in quality, reliability, maintainability,
availability, aesthetics etc.
Hence, Value Analysis focuses on design improvement during production, examination of the
function of parts and materials in an effort to reduce cost and/or improve product performance
and seeks improvements leading either to a better product or a product which can be
produced more economically.
Computer Aided Design (CAD) & Computer Aided Manufacturing (CAM)
✓ CAD is an electronic system for designing new parts or products or altering existing ones,
replacing drafting traditionally done by hand. The heart of CAD is a powerful computer and
graphics software that allow a designer to manipulate geometric shapes and create visual
display. Using the design data stored in the computer’s memory, manufacturing engineers and
other users can quickly obtain print outs of plan and specifications for a part or product. CAD
cut the cost of product development and sharply reduces the time to market for new products.
Hence Computer-Aided Design (CAD) will have the following benefits: 1) increases
productivity of designers, 3 to 10 times; 2) creates a database for manufacturing information
on product specifications; 3) provides possibility of engineering and cost analysis on proposed
designs.
✓ CAM is an electronic system which is used to design production process and control machine
tools and material flow through programmable automation. CAM is utilizing specialized
computers and program to control manufacturing equipment. CAM is often driven by the CAD
system.
✓ CAD /CAM integrate the design and manufacturing functions by translating final design
specification in to detailed machine instruction for manufacturing an item. CAD/CAM is
quicker, less error prone than human, eliminate duplications between engineering and
manufacturing, allow engineers to see how the various parts of a design interact with each
other without having to build a prototype.
38
Virtual Reality Technology
Computer technology used to develop an interactive, 3-D model of a product from the basic CAD
data. Allows people to see the finished design before a physical model is built. 3- D is Very
effective in large-scale designs such as plant layout.
Quality Function Deployment (QFD)
The key purpose of quality function deployment is to try to ensure that the eventual design
of a product or service actually meets the needs of its customers. It is a technique that was
developed in Japan at Mitsubishi‘s Kobe shipyard and used extensively by Toyota, the motor
vehicle manufacturer, and its suppliers. It is also known as the house of quality‘ (because of
its shape) and the voice of the customer‘ (because of its purpose).
The technique tries to capture what the customer needs and how it might be achieved. The
QFD matrix is a formal articulation of how the company sees the relationship between the
requirements of the customer (what‘s) and the design characteristics of the new product (the
how‘s).
Defining the relationship is the first step in building a world class production system. To build the
house of quality, we perform seven basic steps:
39
1) Identify customer wants. (What do prospective customers want in this product?)
2) Identify how the good/service will satisfy customer wants. (Identify specific characteristics,
features, or attributes and show how they will satisfy customer wants).
3) Relate customer wants to product how‘s. (Build a matrix as the following figure shows this
relationship.)
4) Identify relationships between the firm‘s how‘s. (How do our how‘s tie together?)
5) Developing importance ratings. (Using the customer‘s importance ratings and weights for the
relationships in the matrix, compute our importance ratings.)
6) Evaluate computing products. (How well do competing products meet customer wants?)
7) Determine the desirable technical attributes, your performance, and the competitor‘s
performance against this attributes.
3.1.4. Service Design
Service refers to an act; something is done to or for a customer. It provided by service delivery
system.
• Service delivery system: the Facilities, Processes, Skills needed to provide a service.
• Product bundle: combination of goods and services provided to a customer.
• Service package: Service design involves development and refinement of the overall
requirement.
- The physical resources needed
- The goods that are purchased or consumed by the customer
- Explicit services (core /essential feature of it )
- Implicit services(extra features e.g. friendliness )
3.1.4.1. Phases in Service Design
1. Conceptualize: Idea generation, assessment of customer wants /needs, assessment of demand potential
2. Identify service package components
3. Determine performance specifications
4. Translate performance specifications into design specifications
5. Translate design specifications into delivery specifications
3.1.4.2. Service Blueprinting
Service blueprinting is a method used in service design to describe and analyze a proposed service.
It is a useful tool for conceptualizing a service delivery system. It provides a visual model of the
process
40
Major Steps in Service Blueprinting
1. Establish boundaries for the process
2. Identify steps involved and describe them
3. Prepare a flowchart of major process steps
4. Identify potential failure points
5. Establish a time frame for service execution & an estimate of variability in process time
requirement
6. Analyze profitability
41
3.2. PROCESS SELECTION AND CAPACITY PLANNING
Introduction
Another major decision for the operation manager is finding the best way to produce. It is clear
that no product can be made and no service provided without a process, and no process can exist
without a product or service. Process selection refers to the way an organization chooses to produce
its goods or provide its service. Essentially it involves choice of technology and related issues, and
it has major implications for capacity planning, layout of facilities, equipment and design of work
systems.
A process strategy is an organization’s approach to transform resources into goods and services.
We use terms, process and transformation, to describe this strategy. The objective of a process
strategy is to find a way to produce goods and services that meet customer requirements and
product specifications within cost and other managerial constraints. The process selected will have
a long term effect on efficiency and production, as well as the flexibility, cost, and quality of goods
produced. This part of the course looks at the ways managers design a process.
3.2.1. Make or Buy Decision
The very first step in process planning is to consider whether to make or buy some or all of a
product or to subcontract some or all of a service. A manufacturer might decide to purchase certain
parts rather than make them; sometimes all parts are purchased, with the manufacturer simply
performing assembly operations. Many firms contract out janitorial services, and some contact for
repair services. If a decision is made to buy or contract, this lessens or eliminates the need for
process selection. In make or buy decisions, a number of factors are usually considered:
42
3.2.2. Process Choice
One of the first decisions a manager makes in designing a well functioning process is to choose a
process type that best achieves the relative importance placed on quality, time flexibility and cost.
The manager has five process types, which form a continuum, to choose from:
1. Project Process
A project process deals with one-of-a kind products that are tailored to the unique requirement of
each customer. Projects are set up to handle complex jobs that involve unique sets of activities.
Examples of a project process are building a shopping center, planning a major event, running a
political campaign, doing management consulting work, or developing a new technology or
product. A project process is characterized by a high degree of job customization, the large scope
of each project, and the release of substantial resources once a project is completed. A project
43
process lies at the high customization low volume end of the process choice continuum. The
sequence of operations and the process involved in each are unique to the project, creating one-of-
a-kind products or services made specifically to customer orders.
2. Job process
Next in the continuum of process choices is the job process. It is appropriate for manufacturers of
small batches of many different products, each of which is custom designed and, consequently,
requires its own unique set of processing steps, or routing, through the production process.
Examples are providing emergency room care, handling special delivery mail or making
customized cabinets. Customization is relatively high and volume for any one product or service
is low. However, volumes are not as low as for a project process, which by definition does not
produce in quantity. The work force and equipment are flexible and handle various tasks.
As with a project process, companies choosing a job process often bid for work. Typically, they
make products to order and do not produce them ahead of time. A job process primarily organizes
all like resources around itself; equipment and workers capable of certain types of work are located
together. These resources process all jobs requiring that type of work. Because customization is
high and most jobs have a different sequence of processing steps, this process choice creates
jumbled flows through the operations rather than a line flow.
44
The primary difference is that volumes are higher because the same or similar products or
services are provided repeatedly.
Another difference is that a narrow range of products and services is provided. Variety is
achieved more through an assemble-to-order strategy than the job process’s make-to-order or
customized services strategy. Some of the components going into the final product or service
may be processed in advance.
A third difference is that production lots or customer groups are handled in larger quantities
(or batches) than they are with job processes. A batch of one product or customer grouping is
processed, and then production is switched to the next one. Eventually, the first product or
service is produced again. A batch process has average or moderate volumes, but variety is
still too great to warrant dedicating a separate process for each product service.
Characteristics of Batch process
45
Characteristics of Line process
• Continuous flow of material • Short manufacturing cycle time
• Special purpose machines and • Easy supervision
product type layout • Limited work-in-progress
• Mechanized materials handling • Lesser flexibility in production
• Low skilled labor schedules
5. Continuous Process
Continuous processes systems are sometimes referred to as flow systems because of the rapid rate
at which items move through the system. This form of processing is used when highly standardized
products are involved. Examples are petroleum refineries, chemical plants, and plants making beer,
steel, and food. Firms with such facilities are also referred to as the process industry. A continuous
process is the extreme end of high volume, standardized production with rigid line flows. Its name
derives from the way materials move through the process.
46
Design Capacity: the maximum output that can possibly attained.
Effective capacity: It is the maximum output rate that can be sustained under normal
conditions. These conditions include realistic work schedules and breaks, regular staff levels,
scheduled machine maintenance, and none of the temporary measures that are used to achieve
design capacity. Note that effective capacity is usually lower than design capacity.
Actual Output: the rate of output actually achieved. It cannot exceed effective capacity and is often
less than effective capacity due to breakdowns, defective output, shortages of materials, and similar
factors.
Capacity utilization: It simply tells us how much of our capacity we are actually using. Capacity
utilization can simply be computed as the ratio of actual output over design capacity:
Designing capacity is the maximum rate of output achieved under ideal conditions. Effective
capacity is usually less than design capacity ( it cannot exceed design capacity) owing to realities of
changing product mix, the need for periodic maintenance of equipment, lunch breaks, coffee breaks,
problems in scheduling and balancing operations, and similar circumstances. Actual output cannot
exceed effective capacity and is often less because of machine breakdowns, absenteeism, and other
problems outside the control of the operations managers. These different measures of capacity are
useful in defining two measures of system effectiveness: efficiency and utilization. Efficiency is the
ratio of actual output to effective capacity. Utilization is the ratio of actual output to design capacity.
It is common for managers to focus exclusively on efficiency, but in many instances, this emphasis
can be misleading. This happens when effective capacity is low compared with design capacity. In
those cases, high efficiency would seem to indicate effective use of resources when it does not.
Example: Given
Design capacity = 50 trucks/day
Effective capacity = 40 trucks/day
Actual output = 36 units/day
Required: Calculate efficiency and capacity utilization and forward your observation on these two
measures of capacity tools?
Solution
𝑨𝒄𝒕𝒖𝒂𝒍 𝑶𝒖𝒕𝒑𝒖𝒕 𝟑𝟔
𝑬𝒇𝒇𝒊𝒄𝒊𝒆𝒏𝒄𝒚 = 𝑬𝒇𝒇𝒆𝒄𝒕𝒊𝒗𝒆 𝒄𝒂𝒑𝒂𝒄𝒊𝒕𝒚=𝟒𝟎= 0.90=90%
47
𝑨𝒄𝒕𝒖𝒂𝒍 𝑶𝒖𝒕𝒑𝒖𝒕 𝟑𝟔
Capacity Utilization=𝑫𝒆𝒔𝒊𝒈𝒏 𝑪𝒂𝒑𝒂𝒄𝒊𝒕𝒚 =𝟓𝟎 = 𝟎. 𝟕𝟐 = 𝟕𝟐%
Hence, utilization is much lower than efficiency implies that mangers need to work on closing the
gap as much as possible.
48
3.4. Facility Location and Layout
3.4.1. Facility location
The selection of location is a key-decision as large investment is made in building plant and
machinery. It is not advisable or not possible to change the location very often. So, an improper
location of plant may lead to waste of all the investments made in building and machinery,
equipment. Facility Location is the process of identifying the best geographic location for a
service or production facility. The purpose of the location study is to find an optimum location
one that will result in the greatest advantage to the organization Importance of Location Decisions:
i) Location Decision
The location decision often depends on the type of business. For industrial location decisions, the
strategy is usually minimizing costs, although innovation and creativity may also be critical. For
retail and professional service organizations, the strategy focuses on maximizing revenue.
Warehouse location strategy, however, may be driven by a combination of cost and speed of
delivery. A poor choice of location might result in excessive transportation costs, a shortage of
qualified labor, loss of competitive advantage, inadequate supplies of raw materials, or some
similar condition that is detrimental to operations. For service, a poor location could result in lack
of customers and/or high operating costs. For both manufacturing and services, location decisions
can have a significant impact on competitive advantage.
ii) Need for Location Decisions
Location decisions arise for a variety of reasons:
• As part of a marketing strategy to expand markets
• Addition of new facilities
• Growth in demand that cannot be satisfied by expanding existing facilities
• Depletion of basic inputs/resources (e.g. mining & fishing)
• Cost advantage
iii) Strategic Importance of Location Decisions
Location decisions are strategically important:
• Are closely tied to an organization’s strategies
• Effect capacity and flexibility
• Represent a long-term commitment of resources/costs
49
• Impact competitive advantage
• Importance to supply chains
• Impact on investments, revenues, and operations
Location and Costs
Location decisions based on low cost require careful consideration
Once in place, location-related costs are fixed in place and difficult to reduce
Determining optimal facility location is a good investment
Location and Innovation
When creativity, innovation, and research and development investments are critical to the
operations strategy, Cost is not always the most important aspect of a strategic decision. Therefore,
there are four key attributes when strategy is based on innovation
• High-quality and specialized inputs
• An environment that encourages investment and local rivalry
• A sophisticated local market
• Local presence of related and supporting industries
iv) General Procedure for Making Location Decisions
The general procedures for making formal approach to location decisions usually consist of the
following steps:
1. Decide The criteria to use for evaluating location alternatives, such as increased revenues or
community service
2. Identify important factors, such as location of markets or raw materials
3. Develop location alternatives
4. Evaluate the alternatives and make a selection
v) Location Options
There are essentially four options that managers can consider in location planning.
1. Expand an existing facility: This option can be attractive if there is adequate room for
expansion, especially if the location has desirable features that are not readily available
elsewhere. Expansion costs are often less than those of other alternatives.
2. Add new locations: while retaining existing ones, as is done in many retail operations. In
such case, it is essential to take into account what the impact will be on the total system.
3. Shut down at one location and move to another: An organization must weigh the costs of
a move and the resulting benefits against the costs and benefits of remaining in an existing
50
location. A shift in markets, exhaustion of raw materials, and the cost of operations often cause
firms to consider this option seriously.
4. Doing nothing: If a detailed analysis of potential locations fails to uncover benefits that make
one of the previous three alternatives attractive, a firm may decide to maintain the status quo,
at least for the time being.
vi) Factors that Affect Location Decisions
Many factors influence location decisions. However, if often happens that one or a few factors are so
important that they dominate the decision. For example, in manufacturing, the potentially dominating
factors usually include availability of an abundant energy and water supply and proximity to raw materials.
In service organizations, possible dominating factors are market related and include traffic patterns,
convenience, and competitors’ locations, as well as proximity to the market. This section presents you a
brief description of some of these important factors.
a) Regional Factors:
The primary regional factors involve raw materials, markets, and labor considerations.
Location of Raw Materials: Firms locate near or at the source of raw materials for three primary
reasons: necessity, perishability, and transportation costs. Mining operations, farming, forestry, and
fishing fall under necessity. Obviously, such operations must locate close to the raw materials. Firms
involved in canning or freezing of fresh fruit and vegetables, processing of dairy products, baking, and
so on must consider perishability when considering location. Transportation costs are important in
industries where processing eliminates much of the bulk connected with a raw material, making it much
less expensive to transport the product or material after processing.
Location of Markets: Profit-oriented firms frequently locate near the markets they intend to serve as
part of their competitive strategy, whereas nonprofit organizations choose locations relative to the needs
of the users of their services. Other factors include distribution costs or the perishability of a finished
product. Retail sales and services are usually found near the center of the markets they serve. Some
firms must locate close to their markets because of the perishability of their products. Examples include
bakeries, flower shops, and fresh seafood stores. Locations of many government services are near the
markets they are designed to serve.
Labor Factors: Primary labor considerations are the cost and availability of labor, wage rates in an
area, labor productivity and attitudes toward work, and whether unions are serious potential problems.
Skills of potential employees may be a factor, although some companies prefer to train new employees
rather than rely solely on previous experience. Workers attitude toward turnover, absenteeism, and
51
similar factors may differ among potential locations- workers in large urban centers may exhibit
different attitudes than workers in small towns and rural areas.
Other Factors: Climate and taxes sometimes play a role in location decisions.
b) Community Considerations
Many communities actively try to attract new businesses because they are viewed as potential sources of
future tax revenues and new job opportunities. However, communities do not, as a rule, want firms that will
create pollution problems or otherwise lessen the quality of life in the community. From a company
standpoint, a number of factors determine the desirability of a community as a place for its workers and
managers to live. They include facilities for education, shopping, recreation, transportation, religious
worship, and entertainment; the quality of police, fire, and medical services; local attitudes toward the
company; and the size of the community. Other community-related factors are the cost and availability of
utilities, environment regulations, taxes (state and local, direct and indirect).
c) Site Related Factors:
The primary considerations related to sites are land, transportation, and zoning or other restrictions. Because
of the long-term commitment usually required, land costs may be secondary to other site-related factors,
such as room for future expansion, current utility and sewer capacities- and any limitations on these that
could hinder future growth- and sufficient parking space for employees and customers. In addition, for
many firm’s access roads for trucks or rail spurs are important.
d) Global Locations:
Factors relating to foreign locations are:
Policies of foreign ownership of production facilities (local content requirements, import
restrictions, currency restrictions, environmental regulations and local product standards.
Stability issues
Cultural differences: living circumstances for foreign workers and their dependents
Customer Preferences: possible buy locally sentiment
Labor: level of training and education of workers, work practices, possible regulations limiting number of
foreign employees and etc…
Resources: availability and quality of raw materials, energy, transportation
vii) Evaluating Location Alternatives:
There are a number of techniques that are helpful in evaluating location alternatives: factor rating method,
center of gravity method, Locational cost-profit-volume analysis and transportation model.
1. Factor Rating Method:
A typical location decision involves both qualitative and quantitative inputs, which tend to vary from
situation depending on the needs of each organization. Factor rating is a general approach that is useful for
52
evaluating a given alternative and comparing alternatives. The process of selecting a new facility location
involves a series of following steps:
Determine which factors are relevant (e.g., location of market, water supply, parking, revenue potential)
Assign a weight to each factor that indicates its relative importance compared with all other factors.
Typically, weights sum to 1.00.
Decide on a common scale for all factors (e.g., 0 to 100)
Score each location alternative
Multiply the factor weight by the score for each factor, and sum the results for each location alternative
Chose the alternative that has the highest composite score
Example: Assume that a small manufacturing firm has recently decided to expand its operations to include
several new lines which it hopes to produce in a separate location because of space limitations in its existing
plant. The following rating sheet illustrates relevant factors and factor weightings for two alternative
locations.
53
∑ 𝐷𝑖𝑥 .𝑊𝑖 ∑ 𝐷𝑖𝑦 .𝑊𝑖
𝑐𝑥 = ∑ 𝑊𝑖
𝑐𝑦 = ∑ 𝑊𝑖
Where:
C x =x-coordinate of the center of gravity Dix = x-coordinate of location i
C y = y-coordinate of the center of gravity Diy = y-coordinate of location i
Example: A small manufacturing facility is being planned that will feed parts to three heavy manufacturing
facilities. The locations of current plants with their coordinates and volume requirements are given in the
following table.
120 –
Adama (90, 110)
60 –
Hawassa (60, 40)
30 –
| | | | | |
30
Arbitrary origin 60 54
90 120 150
3. Location Break Even Analysis:
Break-Even Analysis - is a technique used to compute the amount of goods that must be sold just to
cover costs. The break-even point is precisely the quantity of goods a company needs to sell to
break even. Whatever is sold above that point will bring a profit. At the break-even point, total cost and
total revenue are equal and the equation will use those to solve for Q, which is the break-even quantity:
𝑃𝑄 = 𝐹 + 𝐶𝑄 𝑄 = 𝐹/𝑃 − 𝐶
Step 1: For Each Location, determine Fixed and Variable Costs. Fixed costs are incurred regardless of
how many units are produced and include items such as overhead, taxes, and insurance. Variable costs
are costs that vary directly with the number of units produced and include items such as materials
and labour. Total cost is the sum of fixed and variable costs.
Step 2: Plot the Total Costs for each Location on one Graph. To plot any straight line we need two points.
One point is Q = 0, which is the y intercept. Another point can be selected arbitrarily, but it is best
to use the expected volume of sales in the future.
Step 3: Identify ranges of output for which each location has the lowest total cost.
Step 4: Solve Algebraically for the Break-Even Points over the Identified Ranges. Select the
location that gives the lowest cost for the range of output required by the new facility
Example: Fixed and variable costs for three potential plant locations are shown below:
If the selling price is = Br. 120 Expected volume = 2,000 unit
Location Fixed cost per year Variable cost per unit Total cost
Hawassa Br. 30,000 Br. 75 Br. 180,000
Dredawa 60,000 45 150,000
Addis Ababa 110,000 25 160,000
From the figure 2 we can understand that up to 1,000 units the best alternative is Hawassa; while from
1,000 to 2,500 units the best alternative is Dredawa and beyond 2, 500 is Addis.
55
3.4.2. FACILITY LAYOUT DECISIONS
Layout is defined as the most effective physical arrangement of machines, processing equipment, and
service departments to have the best co-ordination and efficiency of man, machine and material in an
organization. It is the spatial arrangement of physical resources used to create the product. It also means
how the space needed for material movement, storage, indirect labor, etc is arranged in a factory. For a
factory which is already in operation, this may mean the arrangement that is already present. However,
for a new factory this means the plan of how the machines, equipment, etc will be arranged in the different
sections or shops. These should be arranged in such a way that material movement cost, cost of storage
in between processes, the investment on machines and equipment etc should be optimal and the product
is as cheap as possible.
The objective of layout strategy is to develop an economic layout that will meet the firm’s competitive
requirements. In any cases, layout design must consider how to achieve the following:
56
oriented facility). Some ship-buildings are also experimenting with group technology to group
components.
It is a layout that deals with low-volume, high-variety production. In this type, all the machines and
equipment of the same type are grouped together in one section or area or department. For example, all
welding equipment are kept in one section; all drilling machines in other; all lathes in third section, and
so on. It is used in intermittent (discontinuous) type of production. It is most efficient when making
products with different requirements or when handling customers, patients, or clients with different needs.
In this job-shop environment, each product or each small group of products undergoes a different
sequence of operations. When designing a process layout, the most common tactic is to arrange
departments or work centers so that the cost of material handling is minimum. For this, departments with
large flows of parts or people between them should be placed next to one another.
iii. Repetitive or Product-Oriented Layout:
This is also called assembly line layout because it was first used for assembling automobiles in the USA.
This layout is organized around products or families of similar high-volume, low-variety products. In this
type of layout, one product or one type of product is produced in a given area. This is used in case of
repetitive and continuous production or mass production type industries. The machines and equipment
are arranged in the order in which they are needed to perform operations on a product. The raw material
is taken at one end of the line and goes from one operation to the next very rapidly with little material
handling required.
Two types of product layout are fabrication and assembly lines. The fabrication line builds components
on a series of machines. An assembly line puts the fabricated parts together at a series of workstations.
Both are repetitive processes, and in both cases, the line must be ‘balanced’- that is, the time spent to
perform work on one machine must equal or ‘balance’ the time spent to perform work on the next machine
in the fabrication line.
Assembly lines can be balanced by moving tasks from one individual to another. The central problem
then in product layout planning, is to balance the output at each workstation on the production line so that
it is nearly the same, while obtaining the desires amount of output. A well-balanced assembly line has
the advantage of high personnel and facility utilization and equity between employees’ workloads.
57
Assembly-line Balancing
Line-balancing is done to minimize imbalance between machines or personnel while meeting a required
output from the line. For this, the management must know the tools, equipment, and work methods used.
Then the time needed for each assembly task (e.g. drilling a hole, tightening a nut, or painting a part)
must be determined. Management also needs to know the precedence relationship among the activities
(i.e. the sequence in which different tasks must be performed). The steps in balancing an assembly line
are the following:
Step 1: Specify the sequential relationships among tasks using a precedence diagram.
Step 2: Determine the required workstation cycle time(C), using the formula:
Step 4: Select a primary rule by which tasks are to be assigned to workstations, and secondary rule to
break ties.
Step 5: Assign tasks, one at a time, to the first workstation until the sum of the task times is equal to the
work station cycle time
Step 6: Evaluate the efficiency of the balance:
𝑆𝑢𝑚 𝑜𝑓 𝑇𝑎𝑠𝑘 𝑇𝑖𝑚𝑒𝑠 (𝑇)
𝐸𝑓𝑓𝑖𝑐𝑖𝑒𝑛𝑐𝑦 =
𝐴𝑐𝑡𝑢𝑎𝑙 𝑁𝑢𝑚𝑏𝑒𝑟 𝑜𝑓 𝑤𝑜𝑟𝑘 𝑠𝑡𝑎𝑡𝑖𝑜𝑛𝑠(𝑁) 𝑥 𝑊𝑜𝑟𝑘𝑠𝑡𝑎𝑡𝑖𝑜𝑛 𝐶𝑦𝑐𝑙𝑒 𝑇𝑖𝑚𝑒 (𝐶)
v. Office Layout:
58
The main difference between office and factory layouts is the importance placed on information.
However, in some office environments, just in manufacturing, production relies on the flow of material.
Office layout deals with grouping of workers, their equipment, and spaces/offices to provide for comfort,
safety, and movement of information.
59
CHAPTER FOUR
OPERATIONS PLANNING AND CONTROL
Introduction:
Aggregate planning is intermediate range capacity planning that typically covers a time horizon
of 2 to 12 months, although in some companies it may extend to as much as 18 months. It is
particularly useful for organizations that experience seasonal or other fluctuations in demand or
capacity. The goal of aggregate planning is to achieve a production plan that will effectively
utilize the organization’s resources to satisfy expected demand. Planners must make decisions
on output rates, employment levels and changes, inventory levels and changes, back orders, and
subcontracting.
Organizations make decisions on three levels: long term, intermediate term, and short term. Long-term
planning is generally done annually focusing on a horizon greater than one year. Long-term decisions
relate to product and service selection (i.e. determining which products or service to offer), facility size
and location, equipment decisions, and layout of facilities. The long term decisions essentially define the
capacity constraints within which intermediate planning must function. Intermediate planning usually
covers a period from 6 to 18 months with time increments that are monthly or sometimes quarterly.
Intermediate decisions relate to general levels of employment, output, and inventories, which in turn
define the boundaries within which short range capacity decisions must be made. Short-term planning
covers a period from one day or less to six months with the time increment usually weekly. Thus, short-
term decisions essentially consist of deciding the best way to achieve desired results within the constraint
resulting from long-term and intermediate term decisions. Short-term decisions involve scheduling jobs,
workers and equipment, and the like.
Aggregate planning begins with a forecast of aggregate demand for the intermediate range. This is
followed by a general plan to meet demand requirements by setting output, employment, and finished
goods inventory levels. Managers might consider a number of plans, each of which must be examined in
light of feasibility and cost. The production plan is essentially the output of aggregate planning. Aggregate
68
planners are concerned with the quantity and the timing of expected demand. If total expected demand
for the planning period is much different from available capacity over that same period, the major
approach of planners will be to try to achieve a balance by altering capacity, demand, or both. On the
other hand, even if capacity and demand are approximately equal for the planning horizon as a whole,
planners may still be faced with the problem of dealing with uneven demand within the planning interval.
In some periods, expected demand may exceed projected capacity, and in some periods the two may be
equal. The task of aggregate planners is to achieve rough equality of demand and capacity over the entire
planning horizon. Moreover, planners are usually concerned with minimizing the cost of the production
plan, although cost is not the only consideration.
In this section, we examine the basic problem addressed by aggregate planning-the balancing of supply
and demand- along with the purpose of aggregate planning, the primary decision variables available to
planners, and associated costs. If supply and demand aren’t in balance, that will cost the organization.
There will be added costs of adjusting the system as well as opportunity costs.
Aggregate planners are concerned with the quantity and the timing of expected demand. If the total
expected demand for the planning period is much different from available capacity over the same period,
the major approach of planners will be to try to achieve a balance by altering capacity, demand, or both.
On the other hand, even if capacity and demand are approximately equal for the planning horizon as a
whole, planners may still be faced with the problem of dealing with uneven demand within the planning
interval. In some periods, expected demand may exceed projected capacity, in others expected demand
may be less than projected capacity, and in some periods the two may be equal. The task of aggregate
planner is to achieve rough equality of demand and capacity over the entire planning horizon. Moreover,
planners are usually concerned with minimizing the cost of the production plan, although cost is not the
only consideration.
There are a number of important informational needs for effective aggregate planning. First, the available
resources over the planning period must be known. Then, a forecast of expected demand must be
available. Finally, planners must take into account any policies regarding changes in employment levels.
69
i. Strategies for Adjusting Capacity
If demand for a company’s products or services is stable over time, then the resources necessary
to meet demand are acquired and maintained over the time horizon of the plan, and minor
variations in demand are handled with overtime or undertime. Aggregate planning becomes more
of a challenge when demand fluctuates over the planning horizon. For example, seasonal demand
patterns can be met by:
When one of these alternatives is selected, a company is said to have a pure strategy for meeting
demand. When two or more are selected, a company has a mixed strategy.
LEVEL PRODUCTION
The level production strategy, sets production at a fixed rate (usually to meet average demand)
and uses inventory to absorb variations in demand. During periods of low demand,
overproduction is stored as inventory, to be depleted in periods of high demand. The cost of this
strategy is the cost of holding inventory, including the cost of obsolete or perishable items that
may have to be discarded.
CHASE DEMAND
The chase demand strategy, matches the production plan to the demand pattern and absorbs
variations in demand by hiring and firing workers. During periods of low demand, production is
cut back and workers are laid off. During periods of high demand, production is increased and
additional workers are hired. The cost of this strategy is the cost of hiring and firing workers.
This approach would not work for industries in which worker skills are scarce or competition for
labor is intense, but it can be quite cost-effective during periods of high unemployment or for
industries with low-skilled workers. A variation of chase demand is chase supply. For some
70
industries, the production planning task revolves around the supply of raw materials, not the
demand pattern.
PEAK DEMAND
Maintaining resources for peak demand levels ensures high levels of customer service but can
be very costly in terms of the investment in extra workers and machines that remain idle during
low-demand periods. This strategy is used when superior customer service is important or when
customers are willing to pay extra for the availability of critical staff or equipment.
Overtime and undertime are common strategies when demand fluctuations are not extreme. A
competent staff is maintained, hiring and firing costs are avoided, and demand is met temporarily
without investing in permanent resources. Disadvantages include the premium paid for overtime
work, a tired and potentially less efficient workforce, and the possibility that overtime alone may
be insufficient to meet peak demand periods. Undertime can be achieved by working fewer hours
during the day or fewer days per week.
SUBCONTRACTING
Subcontracting or outsourcing is a feasible alternative if a supplier can reliably meet quality and
time requirements. This is a common solution for component parts when demand exceeds
expectations for the final product. The subcontracting decision requires maintaining strong ties
with possible subcontractors and first-hand knowledge of their work. Disadvantages of
subcontracting include reduced profits, loss of control over production, long lead times, and the
potential that the subcontractor may become a future competitor.
PART-TIME WORKERS
Using part-time workers is feasible for unskilled jobs or in areas with large temporary labor pools
(such as students, homemakers, or retirees). Part-time workers are less costly than full-time
workers—they receive no health-care or retirement benefits—and are more flexible—their hours
usually vary considerably. Part-time workers have been the mainstay of retail, fast-food, and
other services for some time and are becoming more accepted in manufacturing and government
jobs.
71
INVENTORIES
The use of finished goods inventories allows firms to produce goods in one period and sell or
ship them in another period, although this involves holding or carrying those goods as inventory
until they are needed. The cost includes not only storage costs and the cost of money tied up that
could be invested elsewhere, but also the cost of insurance, obsolescence, deterioration, spoilage,
breakage and so on. In essence, inventories can be built up during periods when production
capacity exceeds demand and drawn down in periods when demand exceeds production capacity.
This method is more amenable to manufacturing than to service industries since manufactured
goods can be stored whereas services generally cannot.
ii. Strategies for Managing Demand
Management has a wide range of decision options at its disposal for purposes of aggregate
planning. These include:
o Pricing: Pricing differentials are commonly used to shift demand from peak periods to off-
peak periods. Some hotels, for example, offer lower rates for weekend stays, and some airlines
offer lower fares for night travel. Movie theaters may offer reduced rates for matinees. An
important factor to consider is the degree of price elasticity for the product or service; the more
the elasticity, the more effective pricing will be in influencing demand patterns.
o Promotion: Advertising and other forms of promotion, such as displays and direct marketing,
can sometimes be very effective in shifting demand so that it conforms more closely to
capacity. Obviously, timing of these efforts and knowledge of response rates and response
patterns will be needed to achieve the desired results. Unlike pricing policy, there is much
control over the timing of demand; there is always the risk that promotion can worsen the
condition it was intended to improve.
o Back orders: An organization can shift demand to other periods by allowing back orders.
Hence, orders are taken in one period and deliveries are promised for a later period. The success
of this approach depends on how willing customers are to wait for delivery. Moreover, the cost
associated with the backorders can be difficult to pin down since it would include lost sales,
annoyed or disappointed customers, and perhaps additional paperwork.
o New demand: Many organizations are faced with the problem of having to provide products
or services for peak demand are very uneven. For instance, demand for bus transportation tends
72
to be more intense during the morning and late afternoon rush hours but much lighter other
times. Creating new demand for buses at other times (e.g., trips by schools, clubs, and etc ….)
would make use of the excess capacity during those slack times. Manufacturing firms that
experience seasonal demands for certain products are sometimes able to develop a demand for
a complementary product that makes use of the same production processes. They thereby
achieve a more consistent use of labor, equipment, and facilities.
iii. Mixing Options to Develop a Plan
Although each of these capacity and demand options might produce an effective aggregate
schedule, some combination of capacity options and demand options may be better. Many
manufacturers assume that the use of the demand options has been fully explored by the
marketing department and those reasonable options incorporated into the demand forecast. The
operations manager then builds the aggregate plan based on that forecast. However, using the
five capacity options at his command, the operations manager still has a multitude of possible
plans. These plans can embody, at one extreme, a chase strategy and, at the other, a level-
scheduling strategy. They may, of course, fall somewhere in between.
73
evaluated in terms of their overall costs. The chief advantage of such techniques is that they do
not necessarily result in the optimal aggregate plan.
Example:
Planners for a company that makes several models of skateboards are about to prepare the
aggregate plan that will cover six periods. They have assembled the following information:
Month Jan. Feb. Mar. Apr. May June Total
Forecast 200 200 300 400 500 200 1,800
Cost Information:
Regular time = $2 per skateboard
Overtime = $3 per skateboard
Subcontract = $6 per skateboard
Inventory = $1 per skateboard per period on average inventory
Back orders = $5 per skateboard per period
They now want to evaluate a plan that calls for a steady rate of regular-time output, mainly using
inventory to absorb the uneven demand but allowing some backlog. Overtime and subcontracting
are not used because they want steady output. They intend to start with zero inventory on hand
in the first period. Prepare an aggregate plan and determine its cost using the preceding
information. Assume a level output rate of 300 units (skateboards) per period with regular time
(i.e., 1,800/6 = 300). Note that the planned ending inventory is zero. There are 15 workers, and
each can produce 20 skateboards per period.
Solution:
Plan1: constant workforce (regular – time )
Month Jan. Feb. Mar. Apr. May June Total
Forecast 200 200 300 400 500 200 1,800
Output
Regular time 300 300 300 300 300 300 1,800
Overtime - - - - - -
Subcontracting - - - - - -
Output - Forecasting 100 100 0 (100) (200) 100 0
74
Inventory
Beginning 0 100 200 200 100 0
Ending 100 200 200 100 0 0
Average 50 150 200 150 50 0 600
Backlog 0 0 0 0 100 0 100
Based on the given input and forecasting information above, the cost is calculated as follows:
Cost
Month Jan. Feb. Mar. Apr. May June Total
Output
Regular time $600 600 600 600 600 600 $3,600
Overtime - - - - - -
Subcontracting - - - - - -
Inventory $50 150 200 150 50 0 $600
Back orders $0 0 0 0 500 0 $500
Total $650 750 800 750 1,150 600 $4,700
Note that the total regular-time output of 1,800 units equals the total expected demand. If
insufficient inventory exists, a backlog equal to the shortage amount appears, as in May. This is
taken care of using the excess output in June. The total cost for this plan is $4,700.
very often, graphs can be used to guide the development of alternatives. Some planners prefer
cumulative graphs while others prefer to see a period-by-period breakdown of a plan.
Example:
Plan 2: using overtime
after reviewing the plan developed in the preceding example, planners have decided to develop
an alternative plan. They have learned that one person is about to retire from the company. Rather
than replace that person, they would like to stay with the smaller workforce and use overtime to
make up for the lost output. The reduced regular-time output is 280 units per period. The
maximum amount of overtime output per period is 40 units. Develop a plan and compare it to
the previous one.
75
Solution
overall, the total cost for this plan is $4,640, which is $60 less than the previous plan. Regular-
time production cost and inventory cost are down, but there is overtime cost. However, this plan
achieves savings in backorder cost, making it somewhat less costly overall than the plan in
Example 1.
ii. Mathematical Techniques:
A number of mathematical techniques have been developed to handle aggregate planning. They
range from mathematical programming models to heuristics and computer search models. The
followings are the best-known techniques:
Linear Programming: linear programming models are methods for obtaining optimal solutions
to problems involving the allocation of scarce resources in terms of cost minimization and profit
maximization. With aggregate [planning, the goal is usually to minimize the sum of costs related
76
to regular labor time, overtime, subcontracting, inventory holding costs, and costs associated
with changing the size of the workforce. Constraints involve the capacities of the workforce,
inventories, and subcontracting.
Linear Decision Rule: seeks to minimize the combined costs of regular payroll, hiring and
layoffs, overtime, and inventory using a set of cost-approximating functions.
Simulation Models: computerized models that can be tested under different scenarios to identify
acceptable solution to problems.
Aggregate planning for manufacturing and aggregate planning for services share similarities in
some respects, but there are some important differences- related in general to the differences
between manufacturing and services:
Scheduling deals with the timing of operations. Scheduling begins with capacity planning, which
involves facility and equipment acquisition. In the aggregate planning stage, decisions regarding
the use of facilities, inventory, people, and outside contractors are made. Then the master
schedule breaks down the aggregate plan and develops an overall schedule for outputs. Short-
term schedules then translate capacity decisions, intermediate planning, and master schedules
into job sequences and specific assignment of personnel, materials, and machinery.
Scheduling Criteria
The correct scheduling technique depends on the volume of orders, the nature of operations, and
the overall complexity of jobs, as well as the importance placed on each of four criteria. Those
four criteria are:
77
i. Minimize completion time: this criterion is evaluated by determining the average
completion time per job.
ii. Maximize utilization: this is evaluated by determining the percent of the time the facility
is utilized.
iii. Minimize work in process (WIP) inventory: this is evaluated by determining the average
number of jobs in the system.
iv. Minimize customer waiting time: this is evaluated by determining the average number of
late days.
Good scheduling approaches should be simple, clear, easily understood, easy to carry out,
flexible and realistic. Given these considerations, the objective of scheduling is to optimize the
use of resources so that production objectives are met. In this part, we examine scheduling in
process-focused (intermittent) production.
Process-focused facilities (also known as intermittent or job shop facilities) are high-variety,
low-volume systems commonly found in manufacturing and service organizations. It is a
production systems in which products are made to order. Items made under this system usually
differ considerably in terms of materials used, order of processing, processing requirements, time
of processing, and set up requirements. Because of these differences, scheduling can be complex.
To run a facility in a balanced and efficient manner, the manager needs a production planning
and control system.
Loading means the assignment of jobs to work or processing centers. Operations manager assign
jobs to work centers so that costs, idle time, or completion time are kept to a minimum. Loading
work centers takes two forms. One is oriented capacity; the second is related to assigning specific
jobs to work centers. First, we examine loading from the perspective of capacity via a technique
known as input-output control.
a) Input-output control is a technique that allows operations personnel to manage facility work
flows. If the work is arriving faster than it is being processed, we are overloading the facility
and a backlog develops. Overloading causes crowding in the facility, leading to inefficiencies
78
and quality problems. If the work is arriving at a slower rate than jobs are being performed, we
are under loading the facility and the work center may run out of work. Underloading the facility
results in idle capacity and wasted resources. The options available to operations personnel to
manage facility work flow include:
A Gantt schedule chart is used to monitor jobs in progress. It indicates which jobs are on
schedule and which are ahead of or behind schedule
The Assignment Method: involves assigning tasks or jobs to resources. Examples include
assigning jobs to machines, contractors to bidders, people to projects, and salespeople to
territories. The objective is to minimize total costs or time required to perform the task at hand.
79
One important characteristic of assignment problems is that only one job (or work) is assigned
to one machine (or project).
Hungarian method is the method of assigning jobs by a one for one matching to identify the
lowest cost solution.
1. Acquire the relevant cost information and arrange it in tabular form
2. Obtain the Row Reduction; this is obtained by subtracting the smallest number in each row
from every number in the row. Enter the results in a new table.
3. Obtain the Column Reduction by subtracting the smallest number in each column of the
new table from every number in the column.
4. Test whether an optimum assignment can be made. You do this by determining the
minimum number of lines needed to cover ( i.e.) cross out all zeros. If the number of lines
equal the numbers of row, an optimum assignment is possible. In this case move to final
step.
5. If the numbers of lines are less than the number of rows, modify the table in the following
manner
➢ Subtract the smallest uncovered number from every uncovered number in the table.
➢ Add the smallest uncovered number to the numbers at the intersections of covering lines
➢ Numbers crossed out but not at intersections of cross out lines carry over unchanged to the next
table.
6. Repeat steps fourth and fifth unless an Optimal table is obtained
7. Make the assignments. Begin with rows or columns with only one zero. Match items that
have zeros, using only one match for each row and each column. Cross out both the row and
column for each row.
Example: Determine the optimal assignment of jobs to machines for the following data.
MACHINE
JOB A B C D
1 8 6 2 4
2 6 7 11 10
3 3 5 7 6
4 5 10 12 9
80
Solution:
1. Select the Raw minimum and Subtract in each row,
MACHINE MACHINE
MACHINE MACHINE
JOB A B C D JOB A B C D
1 6 3 0 0 1 6 3 0 0
2 0 0 5 4 2 0 0 5 2
3 0 2 4 3 3 0 1 4 1
4 0 5 7 4 4 0 4 7 2
Determine the minimum number of lines
Subtract the smallest value that has not been crossed out needed to cross Out all 0 ( 4), since this
from every number that has not been crossed out (1 here) equals the number of rows , we obtain the
and add this to numbers that are at intersections of optimum assignment.
covering lines
MACHINE
MACHINE
JOB A B C D Job A B C D
1 6+1=7 3 0 0 1 7 3 0 0
2 1 0 5 2
2 0+1=1 0 5 2
3 0 0 3 0
3 0 0 3 0 4 0 3 6 1
4 0 3 6 1
81
Step-7 Make the assignments, start with rows and columns with Only one 0.
JOB A B C D 1-C $2
2-B 7
1 7 3 0 0 3-D 6
2 1 0 5 2 4-A 5
$20
3 0 0 3 0 If the objective is maximization instead of minimization
4 0 3 6 1 subtract the largest value from all values in the table and
continue as usual
82
Performance Measures
The effectiveness of any given sequence is frequently judged in terms of one or more
performance measures:
Job Flow Time: The length of time a job is in the shop at a particular workstation or
work center (cumulative value of processing time).
Total flow time
Average flow time (completion time) =
Number of Jobs
Job Lateness: This is the length of time the job completion date is expected to exceed
the date the job was due or promised to a customer.
𝐭𝐨𝐭𝐚𝐥 𝐥𝐚𝐭𝐞 𝐝𝐚𝐲𝐬
Average job tardiness =
Number of Jobs
Makespan (total processing time): This is the total time needed to complete a group
of jobs. It is the length of time between the start of the first job in the group and the
completion of the last job in the group.
Average Number of Jobs: Jobs that are in a shop are considered to be work-in-process
inventory. The average work-in-process for a group of jobs can be computed as:
Total flow time
Average Number of Jobs=
Makespan
makespan
Utilization of facility =
sum of job flow time
The objective of the scheduler to minimize processing time, job lateness, number of work in
process , while maximizing utilization of facilities
Example: Processing times (including setup times*) and due dates for six jobs waiting to be processed
at a work center are given in the following table. Determine the sequence of jobs, the average flow time,
average tardiness, and average number of jobs at the work center, for each of these rules: FCFS, SPT,
EDD. Assume jobs arrived in the order shown
A 2 7
B 8 16
C 4 4
D 10 17
E 5 15
F 12 18
83
Solution:
a) (FCFS) sequence A-B-C-D-E-F Total flow time 120
𝐴𝑣𝑒𝑟𝑎𝑔𝑒 𝐹𝑙𝑜𝑤 𝑡𝑖𝑚𝑒 = =
Job Processing Flow Time Due Days Tardy Number of Jobs 6
Sequence Time (days) (cumulative Date (0 if negative) = 20days
(1) processing time) (2) (3) (2)-(3)
A 2 2 7 0 Average Tardiness=54/6=9 days
B 8 10 16 0
C 4 14 4 10 The makespan =41 days
D 10 24 17 7 Average Number of Jobs at workstation=
E 5 29 15 14
F 12 41 18 23 120/41=2.93 jobs per workstation
41 120 54 Utilization = 41/120= 0.34 0r 34 %
Job Processing Flow Time Due Days Tardy Average Flow time =
Sequence Time(days) (cumulative Date (0 if
(1) processing (3) negative) Total Flow Time/Number of Jobs =108/6 =18
time) (2) (2)-(3) days
A 2 2 7 0
C 4 6 4 2 Average Tardiness = 40/6 = 6.67days
E 5 11 15 0 The makespan = 41 days
B 8 19 16 3
Average Number of Jobs at workstation
D 10 29 17 12
F 12 41 18 23 =108/41=2.63 jobs per workstation
41 108 40
Utilization = 41/ 108 = 0.379 0r 38%
84
CHAPTER FIVE
5 QUALITY MANAGEMENT AND CONTROL
5.1. Meaning and Nature of Quality
Different meaning could be attached to the word quality under different circumstances. The word quality
does not mean the quality of manufactured product only. It may refer to the quality of the process (i.e.,
men, material, and machines) and even that of management. Where the quality manufactured product
referred as or defined as “Quality of product as the degree in which it fulfils the requirement of the
customer. It is not absolute but it judged or realized by comparing it with some standards”.
Quality begins with the design of a product in accordance with the customer specification further it
involved the established measurement standards, the use of proper material, selection of suitable
manufacturing process etc., quality is a relative term and it is generally used with reference to the end use
of the product.
85
• Safety: Assurance that the customer will not suffer injury or harm from a product; an especially
important consideration for automobiles.
• Other perceptions: Subjective perceptions based on brand name, advertising and the like.
These quality characteristics are weighed by the customer relative to the cost of the product. In general,
consumers will pay for the level of quality they can afford. If they feel they are getting what they paid
for, then they tend to be satisfied with the quality of the product.
The dimensions of quality for a service differ somewhat from those of a manufactured product. Service
quality is more directly related to time, and the interaction between employees and the customer. Evans
and Lindsay identify the following dimensions of service quality.
• Time and timeliness: How long a customer must wait for service, and if it is completed in time. For
example, is an overnight package delivered overnight?
• Completeness: Is everything the customer asked for provided? For example, is a mail order from a
catalogue company complete when delivered?
• Courtesy: How customers are treated by employees. For example, are catalogue phone operators nice
and are their voices pleasant?
• Consistency: Is the same level of service provided to each customer each time? Is your newspaper
delivered on time every morning?
• Accessibility and convenience: How easy it is to obtain the service. For example, when you call BPL
Mobile, does the service representative answer quickly?
• Accuracy: Is the service performed right every time? Is your bank or credit card statement correct
every month?
• Responsiveness: How well the company reacts to unusual situations, which can happen frequently in
a service company. For example, how well a telephone operator at a catalogue company is able to
respond to a customer’s questions about a catalogue item not fully described in the catalogue.
All the product and service characteristics mentioned previously must be considered in the design process
to meet the consumer’s expectations for quality. This requires that a company accurately assess what the
consumer wants and needs.
5.1.2. The Costs of Quality
Any serious attempt to deal with quality issues must take into account the cost associated with quality.
Those costs can be classified into four categories:
Failure costs: are incurred by defective parts or products, or faulty services. Internal failures are those
discovered during the production process; external failures are those discovered after delivery to the
86
customers. Internal failures occur for a variety of reasons, including defective material from vendors,
incorrect machine settings, faulty equipment, incorrect methods, and etc..the cost of internal failures
include lost production time, scrap and rework, investigation costs, possible equipment damage, and
possible employee injury. External failures are defective or poor services that go undetected by the
producer. Resulting costs include warranty work, handling of complaints, replacements,
liability/litigation, payment to customers or discount used to offset the inferior quality, loss of customer
goodwill, and opportunity costs related to lost sales.
Appraisal Costs: relate to inspection, testing, and other activities intended to uncover defective products
or services, or to assure that there are no defectives. They include the cost of inspectors, testing, test
equipment, labs, quality audits, and field testing.
Prevention Costs: relate to attempts to prevent defects from occurring. They include costs such as
planning and administration systems, working with vendors, training, quality control procedures, and
extra attention in both the design and production phases to decrease the probability of defective
workmanship.
5.1.3. International Quality Standards
Quality is so important globally that a number of quality standards have been developed. Japan, the
European Community, and the United States have each developed their own quality standards.
Japan’s Industrial Standard: the Japanese specification for quality management is published as
industrial Standard Z8101 – 1981. It emphasizes continuous improvement and stresses the role of
organization-wide coordination and commitment.
Europe’s ISO Standard: the European community has developed quality standards called ISO 9000,
9001, 9003, and 9004. The focuses of the EC standard are to force the establishment of quality
management procedure, through detailed documentation, on firms doing business in EC.
ISO 9000: The purpose of the International Organization for Standardization (ISO) is to promote
worldwide standards that will improve operating efficiency, improve productivity, and reduce costs. The
ISO is composed of the national standards bodies of 91 countries. The work of the ISO is conducted by
some 180 technical committees. ISO 9000 is the work of the Quality Management and Quality Assurance
Committee. The ISO series is a set of international standards on quality management and quality
assurance. These standards are critical to doing business internationally, particularly in Europe. They
must go through a process that involves documenting quality procedures and on-site assessment. A key
requirement for registration is that a company review, refine, and map functions such as process control,
inspection, purchasing, training, packaging, and delivery.
87
5.2. TOTAL QUALITY MANAGEMENT
As the 20th century ends, business organizations are involved in what has become a “quality revolution.”
It began in Japan and has now spread to North America and other parts of the world. It involves an entirely
new way of thinking about, and dealing with, quality that encompasses the entire organization. This new
approach has been given a variety of names, but the one we shall use is total quality management, or
TQM.
The term TQM refers to a quest for quality that involves everyone in an organization. There are two key
philosophies in this approach. One is a never-ending push to improve, which is referred to as continuous
improvement; the other is a goal of customer satisfaction, which involves meeting or exceeding customer
expectations. We can describe the TQM approaches as follows:
✓ Find out what customers want
✓ Design a product or service that will meet or exceed what customer want
✓ Design a production process that facilitates doing the job right the first time. Determine where
mistakes are likely to occur and try to prevent them. Strive to make the process “mistake-proof”
✓ Keep track of results, and use those to guide improvement in the system. Never stop trying to
improve.
✓ Extend these concepts to suppliers and to distribution
✓ Successful TQM programs are built through the dedication and combined efforts of everyone in the
organization. As noted, top management must be committed and involved.
5.2.1. The Major Elements of TQM
Continual Improvement: the philosophy that seeks to make never ending improvements to the
process of converting inputs into outputs. The Japanese use the term kaizen to refer to continuous
improvement.
Competitive Benchmarking: this involves identifying companies or other organizations that are the
best at something and studying how they do it to learn how to improve your operation. The company
need not be the same line of business.
Employee Empowerment: giving workers the responsibility for improvements and the authority to
make changes to accomplish them provides strong motivation for employees.
Team Approach: the use of teams for problem solving and to achieve consensus takes advantage of
group synergy, gets people involved, and promotes a spirit of cooperation and shared values among
employees.
Decisions based on facts rather than opinion: management gathers and analyzes data as a basis for
decision making.
88
Knowledge of Tools: employees and managers are trained in the use of quality tools.
Supplier Quality: suppliers must be included in quality assurance and quality improvements efforts
so that their processes are capable of delivering quality parts and materials in a timely manner.
QUALITY TOOLS
A major cornerstone of the commitment to quality improvement prescribed by Deming and the
other early quality gurus is the need to identify and prevent the causes of quality problems, or
defects. These individuals prescribed a number of “tools” to identify the causes of quality
problems that are still widely used today. These are :
1. Check Sheets: is a fact-finding tool used to collect data about quality problems. A typical
check sheet for quality defects tallies the number of defects for a variety of previously
identified problem causes. When the check sheet is completed, the total tally of defects for
each cause can be used to create a histogram or a Pareto chart.
2. Flowchart: is a visual representation of a process. It helps investigators in identifying
possible points in a process where problems occur.
3. Scatter Diagram: a graph that shows the degree and direction of relationship between two
variables.
4. Histogram: a chart of an empirical frequency distribution. It can be useful in getting a sense
of the distribution of observed values.
5. Pareto Analysis: technique for classifying problem areas according to degree of importance,
and focusing on the most important.
6. Control Chart: a statistical chart of time-ordered values of a sample statistic. It can help
detect the presence of correctable causes of variation. It can also indicate when a problem
occurred and give insight into what caused the problem.
7. Cause-and-Effect Diagram: offers a structured approach to the search for the possible
cause(s) of a problem. It is also known as a fishbone diagram.
5.3. STATISTICAL PROCESS CONTROL
Quality control is concerned with the quality of conformance of a process: Does the output of a
process conform to the intent of design? Variations in characteristics of process output provide the
rationale for process control. Statistical process control (SPC) is used to evaluate process output to
decide if a process is “in control” or if corrective action is needed.
89
The best companies emphasize designing quality into the process, thereby greatly reducing the need for
inspection or control efforts. Quality assurance that relies primarily on inspection after production is
referred to as acceptance sampling. Quality control efforts that occur during production are referred to as
statistical process control.
Process Control
Quality control is concerned with the quality of conformance of a process of a process: Does the output
of a process conform to the intent of design? Toward that end, managers use statistical process control to
evaluate the output of a process to determine its acceptability. To do this, they take periodic samples from
the process and compare them with a predetermined standard. If the samples results are not acceptable,
they stop the process and take corrective action. If the samples results are acceptable, they allow the
process to continue. Two statistical tools are used for quality control: control charts and run tests.
Control Charts:
There are two basic categories of variation in output: Common Causes and Assignable Causes
Common causes of variation are purely random, unpredictable sources of variation that are unavoidable
with the current process. For example, a machine that fills cereal boxes will not put exactly the same
amount of cereal in each box.
The second category of variation, assignable causes of variation, also known as special causes, includes
any variation –causing factors that can be identified and eliminated. Assignable causes of variation
include an employee needing training, or a machine needing repair.
Control charts are used to control in-process quality. Acceptance sampling plans are aimed to control the
quality of incoming raw material, semi-finished products and finished products.
Above figure shows the generalized representation of control chart. The x-axis shows the observation
number in sequence. The y-axis shows the sample values of the observations.
There are three lines, namely upper control limit (UCL), lower control limit (LCL) and central line. The
central line is with respect to the average of the observations.
90
The UCL and LCL jointly specify the range over which each sample observation can lie. After plotting
all the sample observations on the chart, we should look for the pattern of those plots. If any sample
observation is outside of these two limits, then we can conclude that the process is out of control and
definitely requires corrective action.
Control limits are the boundaries within which sample statistic can be expected to vary due simply to the
randomness of the sample used. They are computed from the relatively tight sampling distributions and
are typically set at 3 (or possibly 2) standard errors away from the process average. When a process is “in
control,” 99.7 % of the sample average should be within ±3 standard errors of the centre line. If the sample
average fall outside the control limit limits, some assignable cause is probably responsible and corrective
action should be taken.
Control Charts for Variables:
As the name indicates, these charts will use the variable data of a process. 𝑋̅ Chart gives an idea of the
central tendency of the observations. These charts will reveal the variations between sample observations.
R chart gives an idea about the spread (dispersion) of the observations. This chart shows the variations
within the samples.
Mean Chart: A mean control chart, sometimes referred to as an 𝑋̅ (“x-bar”) chart, can be constructed in
one of two ways. The choice depends on what information is available. Although the value of the standard
deviation of a process, , is often unknown, if a reasonable estimate is available, one can compute control
limits using these formulas:
Upper control limit (UCL): = 𝑋̅ + z 𝑋̅
Where:
𝑋̅ = / n
𝑋̅ = standard deviation of distribution of sample means
= Process standard deviation
n = Sample size
z = Standard normal deviate
𝑋̅ = Average of sample means
The following example illustrates the use of these formulas.
Example: A quality inspector took five samples, each with four observations, of the length of time to
process a loan application at a credit union. The analyst computed the mean of each sample and then
computed the grand mean. All values are in minutes. Use this information to obtain three-sigma (i.e. z =
3) control limits for means of future times. It is known from previous experience that the standard
deviation of the process is 0.02 minutes.
91
Observati Sample
on 1 2 3 4 5
1 12.11 12.15 12.09 12.12 12.09
2 12.10 12.12 12.09 12.10 12.14
3 12.11 12.10 12.11 12.08 12.13
4 12.08 12.11 12.15 12.10 12.12
Mean 12.10 12.12 12.11 12.10 12.12
Solution:
X = (12.10 + 12.12 + 12.11 + 12.10 + 12.12)/5 = 12.11
With z = 3, n = 4 observations per sample, and = 0.02, we find
UCL: 12.11 + 3(0.02/√4) = 12.14
LCL: 12.11 - 3(0.02/√4) = 12.08
If one applied these control limits to this data, one would judge the process to be in control because the
entire sample means have values that fall within the control limits. The fact that some of the individual
measurements fall outside of the control limits is irrelevant.
A second approach is to use the sample range as a measure of process variability. The appropriate
formulas for control limits are:
UCL = X = A2R
LCL = X – A2R
Where:
R = Average of sample ranges
Example: Twenty samples of n = 8 have been taken from a cleaning operation. The average sample range
for the 20 samples was 0.016 minutes, and the average mean was 3 minutes. Determine three-sigma
control limits for this process.
Solution:
X = 3 cm R = 0.016 A2 = 0.37 for n = 8
UCL = 3 + 0.37(0.016) = 3.006 minutes
LCL = 3 + 0.37(0.016) = 2.994 minutes
Note that this approach assumes that the range is in control.
Range Charts: Range control charts (R- Charts) are used to monitor process dispersion; they are sensitive
to changes in process dispersion. Although the underlying sampling distribution is not normal, the
concepts for use of range charts are much the same as those for use of mean charts. Control limits for
range charts are found using the average sample range in conjunction with these formulas:
UCLR = D4R
LCLR = D3R
92
Example: Twenty-five samples of n = 10 observations have been taken from a milling process. The
average sample range was 0.01 centimeter. Determine upper and lower control limits for sample ranges.
Solution:
R = 0.01 cm, n = 10
UCLR = 1.78(0.01) = 0.0178 or 0.018
LCLR = 0.22(0.01) = 0.0022 or 0.002
Mean control charts and range control charts provide different perspective on a process. As we have
seen, mean charts are sensitive to shifts in the process mean, whereas range charts are sensitive to changes
in process dispersion. Because of this difference in perspective, both types of charts might be used to
monitor the same process. Once control charts have been set up, they can serve as a basis for deciding
when to interrupt a process and search for assignable causes of variation. To determine initial control
limits, one can use the following procedure.
✓ Obtain 20 to 25 samples. Compute the appropriate sample statistics for each sample.
✓ Establish preliminary control limits using the formulas, and graph them.
✓ Plot the sample statistics on the control chart(s)
✓ If you find no out-of-control signals, assume that the process is in control. If not, investigate and
correct assignable causes of variation. Then resume the process and collect another set of
observations upon which control limits can be based.