Pactoranan Assignment-3
Pactoranan Assignment-3
Instruction(s):
1. Still refer to Rizal Earthquake Scenario and the accomplished ICS Form 201 from
Assignment 1. Also, read the scenario update in page 2.
2. Based on the information provided, plan for your tactical resources using ICS Form 215 in
page 3. Also, plan for the safety using ICS Form 215A in page 4. Accomplish both ICS
forms in the said pages. Use the Operational Period: 17 September 20xx, 0600H – 1800H.
3. Once accomplished, save the file using the filename template <Surname>_<Assignment
Number> (example: Dela Cruz_Assignment 3).
It is now 1500H in the afternoon on September 16. It has been over 24 hours since the
earthquake struck. Numerous aftershocks have occurred in the area and people in Rizal and
Bonifacio Province are uneasy and worried about the ongoing situation. The weather is fair, winds
17 kmh out of the southwest and temperature 28 degrees C.
Your IMT is now running and you have established an Incident Command Post (ICP) to oversee
and prioritize activities in the area. You continue to manage emergency response operations at the
Ridge School and in the barangays in the eastern part of Rizal.
There are 10 reported dead in the barangays and several missing persons in collapsed buildings
near the school.
At least 200 families have already been displaced. They require essential needs such as shelter,
medical care, and protection. Continuing education for the displaced children is required as well.
Electrical power is still out and utility crews have been requested to work to reestablish power and
communications.
Damage seems to be moderate to severe in the southern and eastern portions of Rizal.
Engineers have assessed the Central Highway Bridge over the Roaring River; it seems to be
structurally undamaged. However, the bridge at Main Street is damaged and out of service.
2
2. OPERATIONAL PERIOD
OPERATIONAL PLANNING WORKSHEET 1. INCIDENT/EVENT NAME From (Date and Time): Sept. 17, 20XX
RIZAL EARTHQUAKE 0600H
ICS 215 To (Date and Time): Sept. 17, 20XX 1800H
E
3. a Fr
rt 7. 9.
BRANC 4. 6. POLI SER Dum on 10.
Engi M h Volu OVERHE 8. SPECIAL REPORT
H DIVISION 5. WORK RESO AM RELIEF CE VICE Te Gen R p t REQUESTE
SAR EMS TEA
neer E m nteer AD EQPT. AND ING
/ GROUP / ASSIGNMENT URCE B TEAM VEHI
ing
nts Set ET
T
Truc
o Lo D ARRIVAL
M CLE k s POSITIO SUPPLIES LOCATI
OTHERS S v ad TIME
N ON
e er
r
Requi Mr. Power
red 20
Division Conduct Juan Tools,
A SRR on the Have 3 Ibarra/ Extricatio
(affected affected SAR n Eqpt.,
area) areas Need 17 team collapsed
leader structure ICP 0500H
Provide Requi 1 1 0500H
red 6
Medical 0
Assistance Have 4 2 1
for the 0
victims near
ridge school Need 2 8 Ms. ALS,
& eastern Narda TLS,ACL
part of rizal Darna S Eqpt. ICP
Provide Requi 0500H
red 10
safety and
security on Have 2 Mr.
the affected Need 8 Polly
area pocket
Requi 1 1 Mr. 0500H
red 1 3 5
0 0 Leopol Jackham
Clearing of
Have 1 3 1 1 1 do mer,
debris
DeGrac Chainsa
Need 0 0 4 9 9 ia w, Shovel ICP
Division Conduct Requi 1 Ms. Relief ICP 0500H
red 3 10 5 4 5
B relief and Cheng Trucks,
operations Have 3 2 2 1 2 1 Big
and medical Need 0 8 3 3 3 0 laude
care to the
3
affected
Requi 1 Radio, 0500H
red 2
Restoration 0 Generato
of power Have 2 2 rset,
and Mr. Telco
communicati Manny Eqpt,
ons
Need 0 8 Pangili solar
nan panel ICP
Provide Requi
red 1 5
continuing Ms.
education for Have 1 2 Eddie
the displaced Need 0 3 De Boards
children Turo and pens ICP 0500H
10 2
11.TOTAL Single Resource 1 1
RESOURCES 20 6 3 10 15 5 3 6 2 0 5 5 5
REQUIRED ST or TF 14. PREPARED BY OSC
Name and Signature:
12. TOTAL Single Resource 1 2
RESOURCES ON 3 4 3 2 4 2 3 5 2 2 2 1 1 Ms. Geenie Duarte
HAND ST or TF
13. TOTAL Single Resource 1 9 0 Date Prepared: Time Prepared:
RESOURCES 17 2 0 8 11 3 0 1 0 8 3 4 4
NEEDED TO ST or TF 09/16/20XX 1400H
REQUEST
4
INCIDENT/EVENT SAFETY, RISK AND HEALTH ANALYSIS
ICS 215-A
1. INCIDENT/EVENT NAME 2. OPERATIONAL PERIOD
RIZAL EARTHQUAKE From (Date and Time): Sept. 17, 20XX 0600H
To (Date and Time): Sept. 17, 20XX 1800H
7. Prepared by OSC Name and Signature: Ms. Geenie Duarte Date Prepared: 09/16/20XX Time Prepared:1600H
5
6