1 Procedure
Process Diagram to obtain Consent to Establish
details/document
Submit application
and upload Receive rejection Receive final
SMS alert to
supporting applicant
letter consent order
documents Final Approved
Rejection
SMS alert to Letter SMS alert to Consent Order
applicant applicant
Pay requisite fee
(auto-generated by
system)
SMS alert to
officer SMS alert to
officer
Send query to Forward Rejection
Receives application Satisfactory?
applicant letter to applicant
DEE
Yes Yes No
Forward Inspection
Schedule inspection report with
comments
No
Prepare Inspection
Site inspection
report
Issuing Authority
Approving Authority
Hold Committee
Approve Consent
meeting and draft Forward Consent
Order with Digital
minutes Order to Applicant
Signature
Approved?
Yes
AE/AEE
Legend
Offline
Online- Department
system
Online – Single
Window Portal (SWP)
3
Inspection Authority
Orange
Type of 17- Red - Orange - Orange - Green -
Sl No Red - Large Red - Small Small – and
Application Category Medium Large Medium Large
all Green
1 Consent to Establish Sector JCEE DEE AE/AEE AE/AEE AE/AEE AE/AEE AE/AEE AE/AEE
Approving Authority
Orange
Type of 17- Red - Orange - Orange - Green -
Sl No Red - Large Red - Small Small – and
Application Category Medium Large Medium Large
all Green
1 Consent to Establish TSC CCC CCC ZLCCC ZLCCC ZLCCC ZLCCC DLCCC
Issuing Authority
Orange
Type of 17- Red - Orange - Orange - Green -
Sl No Red - Large Red - Small Small – and
Application Category Medium Large Medium Large
all Green
1 Consent to Establish JCEE JCEE JCEE DEE DEE DEE DEE DEE
4
2 Checklist of supporting documents
# Item
1 A covering requisition letter stating the project status of the industry and activities clearly.
Copy of attested sale Deed /Lease Deed or any other relevant documents as proof to ensure
2
possession of the site/factory for which application is made by the applicant.
Copy of attested Memorandum of Articles in case of Public/Private sectors or registered
3
partnership deed in case of partnership company
Layout plan showing the location of various process equipment, utilities like boiler, generator
4 etc., effluent treatment plant, outlet location, non-hazardous and
hazardous waste storage yard
Topo sketch showing the distance of water bodies, roads, existing/proposed residential areas,
5 agricultural lands, important religious locations, educational institutions, ancient monuments,
archaeological places and other sensitive areas for 1 KM. radius from the units.
6 Detailed manufacturing process for each product along with detailed process flow chart
7 Details of Water Balance and wastewater balance for process
8 Details of Material balance for each products and process.
9 Land use classification certificate as obtained from CMDA/ DTCP/LPA.
Auditor's Certificate with break up details for the proposed Gross fixed Assets duly certified
10
by a Chartered Accountant in the prescribed format.
11 Ground water clearance obtained from the competent Authority (If applicable).
Sewage Treatment Plant(STP) proposal which must contain details of design characteristics of
sewage, treatment methodology, mode of disposal, design criteria for various units, detailed
12
drawing of STP and its layout, diagram showing the hydraulic profile and mode of disposal of
treated sewage and its adequacy(If applicable).
Effluent Treatment Plant (ETP) proposal which must contain details including breakup quantity
of water requirement with sources, breakup quantity of trade effluent, sources of trade
13 effluent, characteristics of wastewater, treatment methodology, mode of disposal, design
criteria for various units, detailed drawing of ETP and its layout, diagram showing the hydraulic
profile and mode of disposal of treated effluent and its adequacy (If applicable).
Air pollution control (APC) measures proposal which must contain the details regarding fuels
used, sources of emission, characteristics, concentration and quality of pollutant, proposal
14 along with design criteria and drawing for the proposed APC measures, adequacy of APC
measures and stack, odour/noise causing operations and its specific odour/noise control
measures(If applicable).
In case of hazardous chemicals used as raw materials, the Material Safety Data Sheets (MSDS)
should be enclosed for each and every item. If the quantity of the hazardous chemicals
handled is more than the threshold limit, the unit shall furnish any one or combination of the
15
following documents as required under the Manufacture, Storage, and Import of Hazardous
Chemicals (MSIHC) Rules (If applicable): Risk assessment report/Onsite emergency
preparedness plan/Off site emergency preparedness plan.
In case of transport of hazardous chemicals, details of chemicals transported, method of
16
transport and its safety measures (If applicable).
Industries attracting Environment Impact Assessment (EIA) Notification shall submit
17 Environmental Clearance obtained from the Ministry of Environment & Forest (MOEF)/ State
Environment Impact Assessment Authority (SEIAA) along with the EIA Report (If applicable).
Coastal Regulation Zone (CRZ) clearance obtained from the competent Authority (If
18
applicable).
5
3 Fees
Amount of Consent Fee (Rupees)
S.No Gross Fixed Assets Red Orange Green
Category Category Category
1. Up to Rs. 1 Lakhs 400 300 200
2. Above Rs. 1 Lakhs and up to Rs. 2. Lakhs 700 600 400
3. Above Rs. 2 Lakhs and up to Rs. 3 Lakhs 900 700 600
4. Above Rs. 3 Lakhs and up to Rs. 4 Lakhs 1100 1000 800
5. Above Rs. 4 Lakhs and up to Rs. 5 Lakhs 1300 1100 1000
6. Above Rs. 5 Lakhs and up to Rs. 6 Lakhs 1700 1500 1200
7. Above Rs. 6 Lakhs and up to Rs. 7 Lakhs 2000 1700 1400
8. Above Rs. 7 Lakhs and up to Rs. 8 Lakhs 2200 2000 1600
9. Above Rs. 8 Lakhs and up to Rs.9 Lakhs 2400 2100 1800
10. Above Rs. 9 Lakhs and up to Rs. 10 Lakhs 2600 2400 2000
11. Above Rs. 10 Lakhs and up to Rs. 15 Lakhs 3700 3100 2500
12. Above Rs. 15 Lakhs and up to Rs.20 Lakhs 4400 3600 3000
13. Above Rs. 20 Lakhs and up to Rs.25 Lakhs 5000 4200 3500
14. Above Rs. 25 Lakhs and up to Rs.35 Lakhs 6000 4900 4100
15. Above Rs. 35 Lakhs and up to Rs.45 Lakhs 7400 5600 5100
16. Above Rs. 45 Lakhs and up to Rs.55 Lakhs 8900 7400 6100
17. Above Rs. 55 Lakhs and up to Rs.65 Lakhs 10400 8400 7100
18. Above Rs. 65 Lakhs and up to Rs.75 Lakhs 13100 10500 8100
19. Above Rs. 75 Lakhs and up to Rs. 1 Crore 16300 12600 10100
20. Above Rs. 1 Crore and upto Rs. 5 Crores 21800 17900 14200
Rs.105/- Rs.65/- Rs. 42/-
21. Above Rs. 5 Crores and upto Rs. 10 Crores
Per Lakh Per Lakh Per Lakh
Rs.1050 Rs.6500
Rs.42000/
00/- 0/-
-
22. Above Rs. 10 Crores and upto Rs. 50 Crores +Rs.40/ +Rs.30/
+Rs.12/-
- Per - Per
Per Lakh
Lakh Lakh
Rs.2650 Rs.1850
Rs.
00/- 00/-
90000/-
23. Above Rs. 50 Crores and upto Rs. 100 Crores +Rs. +Rs.15/
+Rs.12/-
23/- Per - Per
Per Lakh
Lakh Lakh
Rs.15000
Rs.3800 Rs.2600
0/-
00/- 00/-
24. Above Rs. 100 Crores and upto Rs. 1000 Crores +Rs.3.00
+Rs.5/- +Rs.4/-
Per
Per Lakh Per Lakh
Lakh
Rs.8300 Rs.6200
Rs.42000
00/- 00/-
0/-
+Rs. 3/- +Rs. 2/-
+Rs.1/ -
25. Above Rs. 1000 Crore Per Lakh Per Lakh
Per Lakh
(Max Rs. (Max
(Max Rs.
31 Rs.23
8 Lakhs)
Lakhs) Lakhs)