Engineering Division Pest Management / Supplies & Disinfection Services Division
Engineering Division Pest Management / Supplies & Disinfection Services Division
Engineering Division Pest Management / Supplies & Disinfection Services Division
INSTRUMENTATION AND
CONTROL SUPPLY DIVISION
About Us
ISK TECH Supplies and General Services, Inc., an
established business corporation, duly registered with the Secu-
rity and Exchange Commission in 2018, is a subsidiary of
IDEAL SYSTEM KOMPONENTS, with three divisions created
to focus on the supply of instruments for analytical and process
control instrumentation under its Instrumentation and Control
Division, its Pest Management and DisinfectionServices Divi-
sion to cater to the needs of communities by offering safe
and effective solutions for their pest problems and protecting
and preserving health and property backed by our highly-trained
and experienced technicians. And third, our Engineering Divi-
sion which focuses on electro-mechanical projects and fire sup-
pression alarm system installation.
At ISK TECH, we continue to diversify, expand and ex-
cel in other fields of supply and service, further enhance its
dedication to meet the demand of its growing number of cus-
tomers to include the residential, commercial and industrial
sectors.
Our products and services exceed our customer’s re-
quirements and expectations for value, quality and service. We
create confidence in our customers by being a fair and reliable
partner. We are at the advent of a new industrial era. We will
anticipate changing market needs, adapting our processes
through modern tools and innovative technologies.
simplifying IT
INSTRUMENTATION &
SUPPLIES & GENERAL SERVICES, INC. CONTROL DIVISION
General Information
Company Name : ISK TECH Supplies and General Services, Inc.
Types of Business : Sales/Distributor of Industrial Supplies and General Services
Pest Control Services
Main Office Address : Ground Floor, ISK Building, Burgos Ave.Sunshine Valley
Brgy. Estefania, Bacolod City, Negros Occidental 6100
Manila Branch Address : Paseo de Roces Bldg., Chino Roces Avenue, Makati City
: Block 2, Lot 2A, Rosal Street, Adelina 2 Village, Brgy. Maharlika,
San Pedro, Laguna
Tel./Fax Numbers : (034) 476-5204 / (034) 708 6183
(034) 213 1338/ 0917 300 6939
E-mail Address : For Pest Management Division [email protected]
[email protected]
For Instrumentation & Control Division [email protected]
[email protected]
For Engineering Projects [email protected]
Bank References:
Metropolitan Bank and Trust Company (Metrobank)
Account Name : ISK Tech Supplies and General Services, Inc.
Checking Account : 251-7-25152063-8
Dollar Account Number: 251-2251003089
Savings Account Number: 251-325151234-6
simplifying IT
flexible solutions for you
INSTRUMENTATION &
SUPPLIES & GENERAL SERVICES, INC. CONTROL DIVISION
Organizational Chart
BOARD OF DIRECTORS
NOEL B. VIÑAS
PRESIDENT & CHIEF EXECUTIVE OFFICER
EVIJANE T. VIÑAS
CHIEF OPERATING OFFICER
Services offered:
A.Engineering, Procurement and Constructing (ERC) of the
following:
1. Fire Detection and Alarm System
2. Fire Sprinkler/ Suppression System
3. CCTV System
4.Public Address and Voice Alarm System (PAVA)
5. SCADA and Automation
6. Plans and Design
7. Sewage Treatment Plant (STP)
8. Exhaust and Fresh Air Blower System
9. Ducting Fabrication
10. Piping Works
11. Air Grilles and Diffuser
12. Stainless Tank Fabricator
13. Storage Tank/Pressure Tank Installation
simplifying IT
flexible solutions for you
ENGINEERING DIVISION
SUPPLIES & GENERAL SERVICES, INC.
Services offered:
B. SUPPLY OF ELECTRICAL, MECHANICAL
& INSTRUMENTATION
1. Motors
2. VFD and Spare Parts
3. Industrial Valves
4. Flow Meter
5. Fire Pump
6. Jockey Pump
7. Industrial Pumps ( metering pump, centrifugal pump, rotary pumps,
Reciprocating pumps)
8. Plate Heat Exchangers and Spare Parts
simplifying IT
flexible solutions for you
LISTS OF ENGINEERS
SUPPLIES & GENERAL SERVICES, INC. FOR PROJECTS DIVISION
1. Noel B. Viñas, REE
Project Manager/Authorized Managing Officer
2. Noel R. Angeles, PEE
Project Management Consultant (ELECTRICAL)
3. Ramonito Gestosani Alejandro, PME, MBA
Project Management Consultant (MECHANICAL)
4. Dennis Blancia, ECE, MA
Project Consultant/Instrumentation & Controls
5. Kenneth E. Bayot, ME
Project Technical Manager
6. Arnel G. Ballon, ME
Designs and Plans Engr./ Safety Officer
7. Eric B. Viñas, ECE
Project Planning and Estimates Engr.
8. Kathleen L. Miravalles, ECE
Technical Support Engr. / Safety Officer
9. Romeo R. Galanza, REE
Technical Repair and Maintenance Engr
TEAM AVAILABILITY
1. ELECTRO-MECHANICAL PROJECTS TEAM
2. FIRE SUPPRESSION ALARM SYSTEM PROJECTS TEAM
3.
INSTRUMENTATION AND CONTROL PROJECTS TEAM
4. RETICULATION PROJECT TEAM
MAYORS’ PERMIT
MAYORS’ PERMIT
SEC CERTIFICATE
PCAB LICENSE
PHILGEPS CERTIFICATE
PHILGEPS CERTIFICATE
PHILGEPS CERTIFICATE
Project
Status : COMPLETED
Project
Status : COMPLETED
Project
Status : COMPLETED
Project
Status : COMPLETED
Name of Project: DISMANTLING OF OLD FIRE PUMP AND INSTALLATION OF NEW FIRE PUMP
Project Site : Pag– IBIG FUND (HDMF)
Justine Bldg. , Sen. Gil Puyat Ave., Makati City
Client : Pag– IBIG Fund (HDMF)
Name of Project: DISMANTLING OF OLD FIRE PUMP AND INSTALLATION OF NEW FIRE PUMP
Name of Project: DISMANTLING OF OLD FIRE PUMP AND INSTALLATION OF NEW FIRE PUMP
Name of Project: DISMANTLING OF OLD FIRE PUMP AND INSTALLATION OF NEW FIRE PUMP
BEFORE AFTER
BASEMENT
2ND FLOOR
BEFORE AFTER
3RD FLOOR
5TH FLOOR
BEFORE AFTER
6TH FLOOR
7TH FLOOR
8TH FLOOR
BEFORE
AFTER
Name of Project: SUPPLY OF LABOR, MATERIALS , TOOLS, EQUIPMENT AND SUPERVISION FOR THE
FABRICATION AND INSTALLATION OF ADDITIONAL FIRE PROTECTION SYSTEM FOR
MSDH PLANT
Project Site : Bo. Marulahatan, Lian, Batangas
Project Status: Completed
Client : Absolut Distillers, Inc.
Name of Project: SUPPLY OF LABOR, MATERIALS , TOOLS, EQUIPMENT AND SUPERVISION, TESTING
AND COMMISSIONING FOR THE ESTIMATE AND INSTALLATION OF
THE FIRE DETECTION AND ALARM SYSTEM (FDAS)
Project Site : PULUPANDAN PLANT
Scope of Work:
Planning and Layout of Underground Piping Network for termiticide delivery
Installation/Implementation program in coordination with Project/Site Engineer
Preparation and submission of reports:
Pre-Treatment Report
Soil Treatment Application Report
Soil Treatment Completion Report
As Built Report on Anti-termite Reticulation system (As built plans, System Operation In-
structions);
Provision of labor, materials and equipment (mobilization, excavation, fabrication and installation
of pipes and fittings);
Over-all supervision in the implementation of the on-site anti-termite piping network installation;
Setting up of filler points covers as specified, for injection/re-injection of termiticides in the future.
Efficiency testing of installed piping network;
HONEYWELL
HONEYWELL
AUTHORIZED DISTRIBUTOR
TREASURE ISLAND
PAINTS AND CHEMICALS
Certificate of Registration
& Certificate of Compliance
Clients Accreditation
Clients Accreditation