0% found this document useful (0 votes)
44 views42 pages

Net Metering Connection Application Forms

Uploaded by

hanifmughal1188
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views42 pages

Net Metering Connection Application Forms

Uploaded by

hanifmughal1188
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

AJKED NET-METERING APPLICATION

FORMS

AJKED NET METERING WING

AJKED House, Airport Road, Gharipan Chowk, Muzaffarabad


www.ajked.gok.pk
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Eligibility & Documents Checklist for Submission of Application

Eligibility Criteria

 Eligibility Criteria
Vendor/Installer/Service Provider has valid AJKED Net Metering Registration Certificate
Distributed Generator has 3 phase 400V or 11000V connection
DG capacity is not greater than 1.5 times of the Sanction Load
Name of Applicant and Name mentioned on the submitted paid Electricity Bill is same

Documents Checklist

 Document
Selected Vendor/Installer/Service Provider’s AJKED issued Net Metering Registration
Certificate
Standard Distributed Generation Application Form (Schedule-II)
Application For Grant Of License (for connections above 25kW) (Schedule-III)

Application for Exemption from Section 24 of the Companies Ordinance 1984 (Schedule-IV)

Affidavit on Judicial Paper of Rs. 50 (Schedule-VI)


Single Line Diagram
Customer Agreement (Schedule-X)

Customer Agreement (Schedule-X(a))

Customer Agreement (Schedule-X(b))

Customer Agreement (Schedule-X(c))

Customer Agreement (Schedule-X(d))

Customer Agreement (Schedule-X(e))

Load Flow Study & Electrical Inspectorate NOC (for >250kW Connections)

Application Summary (Schedule-XII)

Copy of last Paid Electricity Bill

Technical data/Data Sheet of all components including solar modules, inverters, breakers,
wires, cables, disconnect switch etc.

All the relevant documents are signed & stamped by the Vendor/Installer/Service Provider (Y/N): ____

2
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

List of Unfilled Documents also to be Attached by the Applicant

 Document
Agreement (Schedule-I)
Schedule-VII
Schedule-IX

Schedule-XIV

Form No: NM/B2


Form No: NM/B3
Form No: NM/B4

Form No: NM/B5

Form No: NM/B6(a) (as per load requirement)

Form No: NM/B6(b) (as per load requirement)

Form No: NM/B7

Form No: NM/B8

NOTE: The Schedules and Forms mentioned above can be viewed/downloaded from the AJKED’s website
www.ajked.gok.pk.


To be filled by the Department or both by the Applicant & Department as per the requirement
on later stage
3
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-II
AJK ELECTRICITY DEPARTMENT
STANDARD DISTRIBUTED GENERATION APPLICATION FORM
(As specified in Rule 3(1))

This Portion to be Filled by the AJKED


Application Tracking ID NM/______/_______/________/_________
Receiving Date

1. Contact Information: The applicant is the person that is legally responsible for the generating system.
Applicant’s Name Applicant’s Father Name

CNIC of Applicant/CUIN in case of Company (Copy to be attached)

Applicant’s Mailing Address:

Applicant’s Phone Number & Email Address


Office: Fax:
Cell: Email:

Emergency Contact Numbers

2. Location of Generation System


Address at which the DG Facility is located

Latitude-Longitude (i.e. E-49o 32’ 06”, N-91o 64’ 18”)

3. Applicant / consumer electricity account reference number

4. Applicant’s Ownership Interest in the Generation System


Owner __________ Co-Owner___________ Lease__________ Other___________

4
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

5. Primary Intent of the generation system

(a) Anticipated annual electricity consumption of the facility or site: (kWh)/yr.


(b) Anticipated annual electricity production of the generation system: (kWh)/yr.
(c) Anticipated annual electricity purchase (i.e. (a) minus (b) (kWh)/yr.

7. Installing Contractor Information


Contractor’s Name

Name of Firm

Contractor’s Phone Number E-Mail Address

Mailing Address

8. Requested In-Service Date

9. Provide One-Line Schematic Diagram of the System


Schematic is Attached Number of pages

10. Generator / Inverter Information


Manufacturer Model No.

Version No. Serial No.

Generation Type (Check One) Generation Type (Check One)

5
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Single Phase Three Phase Inverter Other__________


Name Plate AC Ratings (Check One)
_________kW __________ kVA __________volts
Primary Energy Source

Note: if there is more than one inverters, attach an additional sheet describing each

11. Site Plan showing location of the External Disconnect Switch (attach additional sheets as needed)

12. Design Requirements


(a) Has the proposed distributed generation paralleling equipment been certified by Electrical Inspector?
Y_____ N_____

13. Other Comments, Specification and Exceptions (attach additional sheets if needed)

14. Application and Installer Signature


To the best of my knowledge, all the information provided in this application form is completed and
correct

Applicant Signature Date

Installer Signature (If Applicable) Date

6
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-III
AJK ELECTRICITY DEPARTMENT
APPLICATION FOR GRANT OF LICENSE (ABOVE 25KW)
(As specified in Rule 4(2))

1. Name of Applicant:
1(a) CNIC of Applicant/CUIN in case of
Company (Copy to be attached)
1(b) Address:
Office:_____________ Fax:____________
1(c) Contact Nos:
Cell:___________________
1(d) Email Address:

2. Location of DG Facility:
3. Name of Operation Division with which
the DG facility is proposed to be
interconnected
4. Size of DG Facility:
5. Approximate monthly energy proposed
to be supplied to AJKED (kWh):
6. Fee to be deposited:
(Non-Refundable)

Applicant’s Signature

Date

7
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-IV
AJK ELECTRICITY DEPARTMENT
(As specified in Rule 4(2(b)))

Application for Exemption from Section 24 of the Companies Ordinance 1984


As Adapted in AJ&K

I/we (Name of the Distributed Generator) for the purpose of grant of License of Distributed

Generator under AJ&K Distributed Generation (Alternative & Renewable Energy) and Net

Metering Regulations, 2022, hereby request the AJKED for grant of exemption from the

requirement of being registered as a company under the Companies Ordinance, 1984 (XLVII

of 1984) under section 24 of the Act.

Name & Address of Distributed Generator


Stamp

8
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-V
AJK ELECTRICITY DEPARTMENT

FEE SCHEDULE
(As specified in Rule 4(2(c)))

A Distributed Generator shall be bound to pay the onetime fee through pay order in favor of

AJK Electricity Department (AJKED) as per following fee schedule.

Sr.# Size of DG Facility Amount

1. 0-25 KW Rs. 1000/-

2. >25-250 KW Rs. 2000/-

3. Above 250 KW Rs. 5000/-

9
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-VI
AJK ELECTRICITY DEPARTMENT
AFFIDAVIT
(On Judicial paper of Rs. 50/-)
(As specified in Rule 4(2(d)))

I/we (Name of the Distributed Generator) hereby confirm the I/we have read the AJ&K

Distributed Generation (Alternative & Renewable Energy) and Net Metering Regulations,

2022, AJKED License Agreement and agree to abide by its Terms and Conditions and the

content of the Application are true and correct to the best of my knowledge and belief and

nothing has been concealed thereof.

Deponent

Oath Commissioner

10
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-VIII
(As specified in Rule 9)

11
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X

CUSTOMER AGREEMENT (in pursuant to regulation 3 sub-regulation 10)


(to be signed between DG Installer and Customer)

1. This Agreement is made on ________Day ________Month ________Year between


M/s _____________________________ having a registered office at
_________________________________________, registered with AJKED as certified
Vendor/Installer/Service Provider (hereinafter called “the DG Installer”) having
Registration Number AJKED/NM/____/____/____ and Mr./Ms.
____________________________________ having an address:
___________________________________________________________ (hereinafter
referred to as “the Customer”).

Whereas:-

2.1. The Customer has agreed to purchase Wind / Photovoltaic Distributed Generating (DG)
system of ________ KWp with _______ KW grid tie inverter amounting to PKR
__________.
2.2. The DG Installer is involved in the business of designing, supply and installation of Wind
/ PV systems including after sale support.
2.3. The Customer is desirous of installing Wind / Photovoltaic Distributed Generation
Facility (hereinafter referred to as “the DG Facility”) at the
address of _____________________________________________________________.
2.4. The DG Installer is registered with AJK Electricity Department Net Metering Wing, listed
under the Directory of the Registered DG Installers with registration number
AJKED/NM/____/____/____ and is listed at AJKED’s website at www.ajked.gok.pk.

Whereby it is agreed as follows:

3.1. The agreement includes (enter Yes or NO at appropriate column)

Sr.# Services Yes/No Remarks

Supply and Installation DG Facility Does not include provisioning


1 based on net metering, complete in all and installation of bi-directional
respect. energy meter
Consultancy services for technical Technical matters only
2 design and supervision of the planned
DG Facility

Services for documentation and its


3
processing with relevant institutions till

12
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

award of Net Metering


license/connection

4 Maintenance services for DG Facility On annual or other terms basis


May include provisioning and
5 Services related to bi-directional meter support in installation

Any other related to net metering To be decided by installer and


6 customer independently
subject

3.2. The Customer hereby appoints the DG Installer to Supply and Install the DG Facility at
the Address as stated in Regulation 3 sub-regulation 10 as per requirements of AJ&K
Distributed Generation (Alternative & Renewable Energy) and Net Metering
Regulations, 2022 as amended time to time. The DG Installer shall strictly comply with
the specifications and requirements as stated in the Regulations and standards for the
components of the DG Facility as specified by AEDB/AJKED. Compliance certificate shall
also be rendered by DG Facility as per Schedule-X(e) attached.
3.3. The DG Installer shall be responsible to initiate and get processed application of net
metering connection on behalf of the Customer from start till energization of the
connection.
3.4. The Products and Components and services required for the DG Facility are as set out
the quote which has been agreed between the two parties and are set out in the
Schedule-X(a) and Schedule-X(b) attached.
Any changes (after signing this agreement) to the brand of the products as set out in
the Schedule-X(a) have to be mutually agreed, in writing and made a part of this
agreement, by both the Customer and the DG Installer. Copy of the same has also to
be provided to concerned Operation Division of AJKED for update of its records.
3.5. The DG Installer hereby agrees to provide the Customer the DG Facility performance
expectancy as set out in the Schedule-X(d), attached.
3.6. The Customer hereby agrees to pay the DG Installer for the products (including
components) and installation charges as set out in the Schedule-X(c).
3.7. All payments by the Customer to the DG Installer shall be in the form of cheque, bank
draft (cashier’s order) or electronic transfer. No payment in CASH, shall be made by the
Customer to the DG Installer. All payments must be acknowledged by official receipts
issued by the DG Installer.
3.8. The Customer and DG Installer hereby agree to abide and comply with all rules,
regulations, directives and any written requirement as set out by AJKED / NEPRA / AEDB
/ any other relevant authority.
3.9. All documents in respect of AJKED for the DG Facility shall be executed by the
Customer. However, DG Installer shall provide services in completing the
documentation and processing for obtaining Net Metering Connection as per
Regulations.
3.10. The Customer hereby agrees and covenants to allow the DG Installer, its employees
and person/persons authorized by the DG Installer to enter the address of the
13
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Customer for the purpose of carrying out site survey prior to commencement of works,
the supply and installation of the DG Facility and any other related services and
maintenance.
3.11. The DG Installer agrees to provide a warranty as set out Schedule-X(d). Minimum
warranties required are as follows.
a. Warranty, PV Modules against manufacturing defects, 10 Years.
b. PV Modules, standard performance warranty, 25 Years.
c. Workmanship including locally supplied parts (Except Frames), 5 Years.
d. PV mounting Frames and associated parts, 25 Years.
e. Grid tie inverters, including hybrid, 5 years.
3.12. The DG Installer shall be responsible to the Customer on any warranty claims on
components and equipment.
3.13. Both the Customer and the DG Installer hereby agree and covenant that they shall not,
for the duration of this Agreement executed between them, terminate this Agreement
without the written consent of the other party. Provided that written consent shall only
be granted when the party that intends to terminate the agreement has met all its
obligations under this Agreement. The Customer may terminate the agreement if the
DG Installer fails to deliver satisfactory performance as per agreed schedule. Similarly
DG Installer may terminate this agreement if payment schedule is not met.
3.14. The duration of this agreement shall start from the date of signing this Agreement and
will continue for the period mentioned in warranty clauses.
3.15. The Schedules attached i.e. Schedule-X(a), Schedule-X(b), Schedule-X(c),
Schedule-X(d), Schedule-X(e), to this Agreement shall form part and parcel of this
Agreement and shall be read as part of this Agreement.
3.16. Any date or period mentioned in this Agreement may with the written consent of the
parties be extended failing which time shall be of the essence of this Agreement.
3.17. The provisions of this Agreement shall be binding upon the personal representatives of
each of the parties being an individual.
3.18. Each party confirms that this Agreement sets out the entire agreement and
understanding between the parties and that it supersedes all prior agreement,
arrangement and understanding between them and that they are not entering into this
Agreement or any arrangement contemplated or in reliance upon any representation
or warranty not expressly set out in this Agreement.
3.19. No failure or delay by any party in exercise of any right, power or privilege under this
Agreement shall operate as a waiver of it nor shall any single or partial exercise by such
party of any right, power or privilege preclude any further exercise of it or the exercise
of any other right or privilege.
3.20. No party shall have the right to assign any of the rights, liabilities or benefits set out in
this Agreement without the prior written consent of the other party having been first
obtained.
3.21. Each party shall bear its own costs, legal fees and other expenses. The stamp duty for
this Agreement, if any, shall be borne by the Customer.
3.22. No provision of this Agreement shall be amended, modified, varied, waived or
discharged otherwise than by the express written agreement of the parties to it nor

14
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

may any breach of any provision of this Agreement be waived or discharged except by
the written consent the other party.
3.23. In the event of any conflict between the provisions of this Agreement and any other
document, the provision of this Agreement shall prevail.
3.24. All notices required to be given under this Agreement shall be in writing and shall be
given or sent to the party concerned by hand or by Registered Post at the address set
out in this Agreement or at such other address as the parties may so inform the other
in writing.
3.25. This Agreement shall be deemed to be a contract made in AJ&K and shall be interpreted
in all respect in accordance with Laws of AJ&K/Pakistan.

IN WITNESS WHEREOF the parties hereto have hereunto set their hands the day and year first
above written.

SIGNED by ______________________________, Designation ______________________,


CNIC ________________________ for and on behalf of ____________________________
Registration with AJKED No.: AJKED/NM/____/____/____ (as the DG Installer) in the
presence of:-

Company Stamp

Witness
Name, _________________________________, Designation ______________________,
CNIC ______________________.

SIGNED by ______________________ for and on behalf of _____________________


___________ (as the Customer) in the presence of:-

Witness
Name, _________________________________, Designation ______________________,
CNIC ______________________.

15
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X(a)

Products and Components to be supplied by the DG Installer for the DG Facility

S# Product description Brand S# of Equipment Remarks


1 PV Modules
2 Inverter
3 DC cables
4 AC cables
5 PV frames
6 Earthing
7 AC breakers , fuse links
8 DC breakers and fuse links
9 AC surge protectors
10 DC surge protectors
Residual Current detector
11
(RCD)
12 Bus bar
13 Manual disconnect
Any other
14
accessories/attachments

Please attach a separate page if required.

16
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X(b)

Quotation by DG installer (on company letter head and bearing company stamp) and
bearing acceptance signatures, name, date and CNIC Number of the customers

17
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X(c)

PAYMENT SCHEDULE

S# Milestone % of the Total Amount Amount (PKR)


1 Upon signing of Agreement
Upon completion of installation, testing
2
and commissioning
3 On receipt of license from AJKED
4 Any other term
Total 100

18
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X(d)

SYSTEM AND COMPONENTS WARRANTIES

1. Warranty, PV Modules against manufacturing defects: _____ Years


2. PV Modules, standard performance warranty: _____ Years
3. Workmanship including locally supplied parts (Except Frames): _____ Years
4. PV mounting Frames including fixing screw, nut/bolt and washers etc.: _____ Years
5. Grid tie inverters, including hybrid (On-grid/Off-Grid as one unit): _____ Years
6. Guaranteed Annual Energy Yield at given site: _____ KWh/Yr.

Note:
I. In case the system does not yield promised yield, installer promises to rectify till
guaranteed yield is delivered.
II. This guarantee is subject to:
a. No tempering by any un-authorized person
b. Regular maintenance services hired from installer.
c. Not valid under force majeure condition, natural or man-made disasters.
d. Yield could vary ±10% depending upon location.

19
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-X(e)

CERTIFICATE BY INSTALLER ABOUT COMPLIANCE TO STANDARDS

Certificate by Installer about compliance to standards as specified by AJ&K Distributed Generation


(Alternative & Renewable Energy) and Net Metering Regulations, 2022 and AJKED Net Metering
Wing guidelines and as amended time to time.

Certificate of Compliance with Mandatory requirements


We, ____________________________________ (Name, address, contact info of installer) having
been prequalified by AJK Electricity Department Net Metering Wing vide reference number
AJKED/NM/____/____/____ have installed the system as per requirements of AJ&K Distributed
Generation (Alternative & Renewable Energy) and Net Metering Regulations, 2022 and all other
standards of the components of the DG Facility as specified by AJKED. We specifically certify the
following:-

1. Compliance to quality, safety and environmental standards and technical requirements as


specified by AJKED:
a) The design of the DG facility and its sizing complies with minimum technical
requirements and specifications
b) The components of the DG Facility as supplied to customer complies with the quality,
safety and environment standards
c) The warranties given to the customer for components of DG Facility complies with the
requirements
d) The installation of the DG Facility complies with the quality and safety requirements,
recommendations and precautions

2. Compliance to Protection Requirements as specified by AJKED:


a) The protection and control diagrams for the interconnection of the DG Facility has been
designed in accordance with the provision of Grid and Distribution codes and approved
by AJKED prior to commissioning of proposed interconnection facilities. Reference has
been derived from typical single line diagram specified at Schedule VIII of the net
metering regulations.
b) The distributed generator is provided with equipment including without limitation,
electrical lines/circuits, transformer, switch gear, safety and protective devices. Meters
to be used for interconnection shall be either arranged in consultation with or (after
submission of fee/charges) to be obtained from AJKED.
c) The protective functions are equipped with automatic means to prevent reconnection
of distributed generation facility with the distribution facilities of AJKED.
d) The distributed generator is equipped with a manual lockable disconnect switch that has
a visual break to isolate the distributed generator facility from distribution facilities.
e) The Grid connected generator complies with Underwriter laboratories UL1741 standards
and addresses the electrical interconnection design of various forms of generating
equipment IEEE 1547 2003, IEC 61215. Compliance proof or Manufacturers certificate to
this effect is attached.

20
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

3. Compliance to Prevention of interference:


The DG Facility is designed to free from interference generation. Proper shielding and
earthing is provided to avoid any such generation and suppression. The THD of the inverter
used is _______(Value) which is less than permitted 3%.

4. Compliance to Voltage and Frequency Range:

a) The maximum variation in output voltages of the inverter used _________ (Value) which
is less than permissible ±5%
b) The maximum variation in output frequency of the inverter used_________(Value)
which is less than permissible ±1%

5. Technical details of the inverter


The serial number of the inverter installed is _________. Its capacity is of _________ KW and
(Manufacturers, type and Make) ___________________________. The literature containing
technical specifications of the inverter is attached.

21
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-XI

LOAD FLOW STUDY

Software used: ________________

DG Capacity (kW): ________________

22
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-XII
APPLICATION SUMMARY
CLIENT INFORMATION
Name
CNIC
Address
Mailing Address
Cell Ph. # Email Address
Subdivision Feeder Name
Reference No. Customer ID
Meter Number Bill Tariff
Issuance Date of Attached Bill
Sanction Load Required Load
Net Metering Residential Consumption of Client Total kWh Production Surplus kWh

Details

VENDOR/INSTALLER/SERVICE PROVIDER’S INFORMATION


Company Name
Company Address
AJKED Net Metering Registration Number AJKED/NM/_____/_____/_____
Installing Engineer
Installer’s CNIC
Installer’s Phone# Installer’s Email

SYSTEM INFORMATION
PV System Category Residential Commercial Industrial Agricultural
Supply Voltage Level 11 kV 400 V
System Size
Panel Make Panel Model
Inverter Capacity Rated Capacity = Inverter Type On Grid Off Grid
Inverter Make Inverter Model
Inverter Serial No.
For more than one make/model of panels on a single inverter, use this area to define the additional solar panels

Second Set of Make Model No. of Panels Watts/Panel kW of 2nd Set of Panels

Solar Panels
Second Set of Make Model Rated Capacity Inverter Serial Number

Solar Panels
Overall System Size (kW)

23
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Particulars Not To Be Filled From Here Onwards As


Upcoming Forms Are For

"OFFICE USE ONLY"

24
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE – I

DISTRIBUTED GENERATION INTERCONNECTION AGREEMENT (OF __KW)


BETWEEN AJK ELECTRICITY DEPARTMENT (AJKED) & DISTRIBUTED GENERATOR (DG)
(As specified in Rule 2(c))

The Distributed Generation Interconnection Agreement (the “Agreement”), is made and entered
in to this ______________ (day) of ______________ (month), _________________ (year) by and
between _________________________________ hereinafter called “AJKED” and
_______________________ hereinafter called the “Applicant”. Applicant shall be 3 phase 400V or
11kV AJKED’s consumer. AJKED and the Applicant are hereinafter collectively referred to as the
“Parties” and individually as a “Party”.

RECITALS

A. AJKED is the owner of the electric distribution system in the state of Azad Jammu & Kashmir
(AJ&K).
B. Applicant desires to install a Distributed Generator (DG) facility or energy storage device using
solar or wind energy resources with a capacity greater than 1 KW but no more than 1 MW,
including related interconnection equipment (the “DG Facility”) and to interconnect the DG
Facility to the AJKED’s distribution system.
C. AJKED has previously reviewed and approved Applicant‘s DG Interconnection Applicant Form
dated _____________, and supporting materials (the Application”). The completed
Application is attached as Exhibit 1 and incorporated into this Agreement.
D. Applicant wishes to interconnect the DG Facility to AJKED’s distribution system and AJKED is
willing to permit such interconnection subject to the terms and conditions set forth: (1) The
completed Application approved by AJKED; (2) this Agreement.
E. No agency or partnership is created with the interconnection of the applicants DG Facility.

AGREEMENT

NOW THEREFORE, in consideration of the foregoing Recitals and for good and valuable consideration,
the AJKED and Applicant agree as follows:

1. Design Requirement:
The DG Facility shall be installed in compliance with the AJ&K Distributed Generation
(Alternative & Renewable Energy) and Net Metering Regulations, 2022.
2. Applicant’s Representations and Warranties:
Applicant represents and warrants that:
i The DG Facility is fully and accurately described in the Application;
25
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

ii All information in the Application is true and correct;


iii The DG Facility has been installed to Applicant’s satisfaction;
iv Application has been given warranty information and an operation manual for
the DG Facility;
v Applicant has been adequately instructed in the operation and maintenance
of the DG Facility.

3. Interconnection Disconnect Switch:


AJKED may require that the Applicant furnish and install an interconnection disconnect
switch that opens, with a visual break, all underground poles of the interconnection circuit.
The interconnection disconnect switch shall be rated for the voltage and fault current
requirements of the DG Facility, and shall meet all applicable IEC, IEEE Standards, as well as
applicable requirements of the Grid Code. The switch enclosure shall be properly grounded.
The interconnection disconnect switch shall be accessible at all times, located for ease of
access of AJKED personnel, and shall be capable of being locked in the open position. The
Applicant shall follow AJKED’s recommended switching, clearance, tagging, and locking
procedures.

4. Modifications to the DG Facility:


Applicant shall notify AJKED of plans for any material modification to the DG Facility by
providing at least forty working days of advance notice. “Material Modification” is defined
as any modification that changes the maximum electrical output of the DG Facility or
changes the interconnection equipment. The notification shall consist of a completed,
revised Application and such supporting materials as may be reasonably requested by
AJKED. Applicant agrees not to commence installation of any material modification to the
DG Facility until AJKED has approved the revised Application.

5. Insurance, Indemnification, Liability:


5.1 Distributed Generator shall obtain and maintain appropriate insurance for third party
personal injury and general commercial liability.
5.2 Each party as indemnitor shall defend, hold harmless, and indemnify the other party
and the directors, officers, employees, and agents of the other party against and from
any and all loss, liability, damage, claim, cost, charge, demand, or expense (including
any direct, indirect or consequential loss, liability, damage, claim, cost, charge,
demand, or expense, including attorneys’ fees) for injury or death to persons, including
employees of either party, and damage to property, including property of either party,
arising out of or in connection with (a) the engineering, design, construction,
maintenance, repair, operation, supervision, inspection, testing, protection or
ownership of the indeminitor’s facilities, or (b) the making of replacements, additions,
betterments to, or reconstruction of the indeminitor’s facilities. This indemnity shall
apply notwithstanding the active or passive negligence of the indeminitee. However,
26
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

neither party shall be indemnified hereunder for its loss, liability, damage, claim, cost,
charge, demand, or expense resulting from its sole negligence or willful misconduct.
5.3 The indeminitor shall, on the other party’s request, defend any suit asserting a claim
covered by this indemnity and shall pay for all costs, including reasonable attorney
fees, that may be incurred by the other party in enforcing this indemnity.
5.4 The provisions of this Section shall not be construed to relieve any insurer of its
obligations to pay any insurance claims in accordance with the provisions of any valid
insurance policy.
5.5 Except as otherwise provided in this section, neither party shall be liable to the other
party for consequential or remote damages incurred by that party.

6. DG Facility Commissioning Testing:


Applicant shall notify AJKED in writing that installation of DG Facility is complete and that the
interconnection equipment is available for testing by AJKED at least fifteen working days duly
certified by Electrical Inspector AJK before Applicant interconnects the DG Facility with
AJKED’s Distribution System. AJKED shall thereupon have the right to test the DG Facility.
AJKED shall also have the right to witness any testing by Applicant of the DG Facility. Any
AJKED testing of the DG Facility shall be completed within ten working days. After the testing
which is to the satisfaction of both parties, the DG facility may be interconnected with the
distribution system of AJKED to be witnessed by representatives of both parties within thirty
eight days.

7. Access to DG Facility:
Applicant shall permit AJKED’s employees and agents to enter the property on which the DG
Facility is located at any reasonable time for the purposes of inspecting and/or testing
Applicant’s DG Facility to ensure its continued safe and satisfactory operation and the
accuracy of AJKED meters. Such inspections shall not relieve Applicant from its obligation to
maintain the DG Facility and any related equipment owned by Applicant in safe and
satisfactory operating conditions. AJKED shall have the right to witness any testing by
Applicant of the DG Facility.

8. Temporary Disconnection of a DG Facility:


AJKED may limit the operation and/or disconnect or require the disconnection of a DG facility
from AJKED’s Distribution System at any time, with or without notice, in the event of fault.
AJKED may also limit the operation and/or disconnect or require the disconnection of DG
facility from AJKED’s Distribution System upon the provision of 30 days written notice for the
conditions to allow for routine maintenance repairs or modifications to AJKED’s Distribution
System:

9. Disputes; Right to Appeal to AJKED:


In case of any dispute between the applicant and concerning Electricity Operation
Division/Net Metering Wing of AJKED, the applicant may file a petition to concerning Chief
27
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Engineer Electricity. The decision of the Chief Engineer shall be final and binding on both the
applicant and Electricity Operation Division/Net Metering Wing AJKED.

10. Amendments; Non-Waiver:


Any amendment or modification to this Agreement must be in writing and executed by
Applicant and AJKED. The failure of Applicant or AJKED’s to insist on performance by the
other Party of any provision of this Agreement shall not waive the right of the Party who
failed to insist on performance to enforce the same provision at a later time.

11. Term and Termination of Agreement:


The term of Agreement between Distributed Generator and AJKED shall be seven years with
effect from the date of commissioning of DG facility. At the expiry of initial term, the
Agreement may be automatically renewed by the mutual understanding between
Distributed Generator and AJKED for another term of seven years and so on.

a) AJKED may limit the operation and/or disconnect or require the disconnection of a DG
facility from AJKED’s Distribution System at any time, with or without notice, in the event
of fault. AJKED may also limit the operation and/or disconnect or require the
disconnection of DG facility from AJKED’s Distribution System upon the provision of 30
days written notice for the conditions which including as follows
- To allow for routine maintenance, repairs or modifications to AJKED’s Distribution
System;
- Upon AJKED’s determination that DG facility is not in compliance with these Rules;
- Upon termination of the Agreement.

b) This Agreement may be terminated in accordance with the AJ&K Distributed Generation
(Alternative & Renewable Energy) and Net Metering Regulations, 2022.
c) The Distributed Generator may terminate the agreement upon thirty days written notice
if the Distributed Generator determines to discontinue the sale of electricity to AJKED.
d) The concerning Electricity Operation Division shall not terminate the Agreement in any
event without prior approval of the Net Metering Wing AJKED/Chief Engineer.
e) All rights and obligations accrued up to termination shall continue in force upon
termination.

12. Successors and Assigns:


a) Assignment by Applicant: Applicant shall not assign its rights and obligations under this
Agreement in whole or in part without the prior written consent of AJKED, which consent
shall not be unreasonably withheld or unduly delayed. AJKED may withhold its consent to
any proposed assignment if the proposed assignee fails to assume the obligations of
Applicant under this Agreement in writing.

28
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

b) Assignment by AJKED. AJKED shall have the right to assign this agreement in whole upon
written notification to the Applicant.
c) Successors. This Agreement shall be binding upon the personal representatives, heirs,
successors, and permitted assigns of the respective Parties.

13. Applicant and AJKED Signature and Seal:


IN WITNESS WHEREOF, Applicant and AJKED have executed this Agreement as of the year
and date first set forth above.

Applicant Signature & Date AJKED’s Signature with Seal & Date

Title Title

Witness No.1 (Name & Signature) Witness No.1 (Name & Signature)

Witness No.2 (Name & Signature) Witness No.2 (Name & Signature)

29
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-VII
AJK ELECTRICITY DEPARTMENT
GENERATION LICENSE TEMPLATE FOR ABOVE 25KW
(As specified in Rule 4(3))

Application Tracking ID: NM/____/____/________/______ Date: __________________

1. AJKED hereby grants Generation license to (______________________________)


under Regulation 4 of the AJ&K Distributed Generation (Alternative & Renewable
Energy) and Net Metering Regulations, 2022 for a period of ___________ Years. This
License is valid upto 20___.
2. The License shall abide by the provision under AJK Distributed Generation
(Alternative & Renewable) and Net Metering Regulation 2022, during the currency of
the License.
3. The technical parameters of the net metering arrangement are shown hereunder;
i. Primary Energy Source: Solar/Wind
ii. Size of DG Facility: ___________ KW
iii. Generator/Inverter information:
Manufacturer ___________, Model No. _____________
iv. Generation Type: Inverter/Other
4. This License may be renewed subject to AJ&K Distributed Generation (Alternative &
Renewable Energy) and Net Metering Regulations, 2022.

___________________

AJKED

___________________

Name & Address of


Distributed Generator

30
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-IX
AJK ELECTRICITY DEPARTMENT
NET METERING APPROVAL
(As specified in Rule 3(7-a))

No. ___________ Dated___________


To,

Applicant Name: ______________________________________________________________


Applicant Address: ______________________________________________________________
Contact No.: ______________________________________________________________

Subject: NET METERING APPROVAL

1. The Executive Engineer Operation Division _______________ AJK Electricity Department hereby
grants Net Metering approval to write applicant name, for ____ KW photovoltaic solar based
Distributed Generation facility, having Application Tracking ID NM/____/____/________/______,
located at write applicant address, under the AJ&K Distributed Generation (Alternative &
Renewable Energy) and Net Metering Regulations, 2022, for a period of seven (7) Years. This
approval is valid upto write expiry date.
2. The Net Metering approved Distributed Generator shall abide by the provisions under the AJ&K
Distributed Generation (Alternative & Renewable Energy) and Net Metering Regulations, 2022,
during the currency of Net Metering connection.
3. The Technical parameters of Net-Metering arrangement are as under:
1. Primary Energy Source Solar
2. Size of Distributed Generation Facility _____ kW
3. Generator/Inverter Information
Manufacture _________
Mode No. _________
4. Vendor/Installer _________
5. Generation Type Inverter

4. This approval may be renewed subject to AJ&K Distributed Generation (Alternative & Renewable
Energy) and Net Metering Regulations, 2022.

Executive Engineer
Operation Division______
AJK Electricity Department
Copy to:
1. Superintending Engineer (E), Circle__________
2. Deputy Director (Net Metering Wing), Directorate P&M AJKED Muzaffarabad.
3. Sub Divisional Officer Operation Sub Division______________.
4. Revenue Officer (E), Operation Division_____________.

Executive Engineer
Operation Division______
AJK Electricity Department

31
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

SCHEDULE-XIV

NOC for Generation License

To,
______________________
Electricity Operation Division ______________,
AJ&K.

AJK Electricity Department Net Metering Wing on _____-_____-20____


hereby grants No Objection Certificate (NOC) for the issuance of
License in favour of Applicant ______________________________
having DG facility of _____ kWp & Application Tracking ID
NM/____/______/_______/_______.

Note: This NOC does not impose the compulsion for the issuance of Net Metering connection/generation license. The Net
Metering connection issuance is subjected to fulfilling all the conditions given in the AJ&K Distributed Generation (Alternative
& Renewable Energy) and Net Metering Regulations, 2022 and AJKED approved guidelines/SOPs for Net Metering.

Director
Planning & Monitoring
AJKED

32
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B2

FORM FOR INITIAL ELIGIBILITY CRITERIA CHECK

Application Tracking ID: NM/_____/______/______/____________

Sr. Eligibility Criteria Compliant Non-Compliant


Vendor/Installer/Service Provider has valid AJKED
1.
Net Metering Registration Certificate
Distributed Generator has 3 phase 400V or 11000V
2.
connection
DG capacity is not greater than 1.5 times of the
3.
Sanction Load
Name of Applicant and Name mentioned on the
4.
submitted paid Electricity Bill is same

Name: ________________________________ Designation: _________________________________

Date: ________________________________ Signature: _________________________________

33
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B3

DOCUMENTS CHECKLIST

Application Tracking ID: NM/_____/______/______/____________

Sr. Document Attached N/A Missing

Selected Vendor/Installer/Service Provider’s AJKED


1.
issued Net Metering Registration Certificate
Standard Distributed Generation Application Form
2.
(Schedule-II)
Application For Grant Of License (for connections above
3.
25kW) (Schedule-III)
Application for Exemption from Section 24 of the
4.
Companies Ordinance 1984 (Schedule-IV)
5. Affidavit on Judicial Paper of Rs. 50 (Schedule-VI)
6. Single Line Diagram
7. Customer Agreement (Schedule-X)

8. Customer Agreement (Schedule-X(a))

9. Customer Agreement (Schedule-X(b))

10. Customer Agreement (Schedule-X(c))

11. Customer Agreement (Schedule-X(d))

12. Customer Agreement (Schedule-X(e))


Load Flow Study & Electrical Inspectorate NOC (for
13.
>250kW Connections)
14. Application Summary (Schedule-XII)

15. Copy of last Paid Electricity Bill


Technical data/Data Sheet of all components including
16. solar modules, inverters, breakers, wires, cables,
disconnect switch etc.

All the relevant documents are signed & stamped by the Vendor/Installer/Service Provider (Y/N): ____

NOTE: The Schedules mentioned above can be viewed/downloaded from the AJKED’s website
www.ajked.gok.pk.

Name: ________________________________ Designation: _________________________________

Date: ________________________________ Signature: _________________________________

34
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B4

Application Return Form

Application Tracking ID: NM/_____/______/______/____________

The eligibility criteria labelled as symbol “” (if any) in the table given below, required for the
registration as Vendor/Installer/Service Provider with AJKED is non-compliant:

Sr. Eligibility Criteria Non-Compliant


Vendor/Installer/Service Provider has valid AJKED Net Metering Registration
1.
Certificate
2. Distributed Generator has 3 phase 400V or 11000V connection
3. DG capacity is not greater than 1.5 times of the Sanction Load
4. Name of Applicant & Name mentioned on the submitted paid Electricity Bill is same

The documents labelled as symbol “” (if any) in the table given below, required for the registration
as Vendor/Installer/Service Provider with AJKED are missing/invalid:

Sr. Document Missing/Invalid


Selected Vendor/Installer/Service Provider’s AJKED issued Net Metering Registration
1.
Certificate
2. Standard Distributed Generation Application Form (Schedule-II)
3. Application For Grant of License (for connections above 25kW) (Schedule-III)
Application for Exemption from Section 24 of the Companies Ordinance 1984
4.
(Schedule-IV)
5. Affidavit on Judicial Paper of Rs. 50 (Schedule-VI)
6. Single Line Diagram
7. Customer Agreement (Schedule-X)
8. Customer Agreement (Schedule-X(a))
9. Customer Agreement (Schedule-X(b))
10. Customer Agreement (Schedule-X(c))
11. Customer Agreement (Schedule-X(d))
12. Customer Agreement (Schedule-X(e))
13. Load Flow Study & Electrical Inspectorate NOC (for >250kW Connections)
14. Application Summary (Schedule-XII)
15. Copy of last Paid Electricity Bill
Technical data/Data Sheet of all components including solar modules, inverters,
16.
breakers, wires, cables, disconnect switch etc.

Other Comments/Reasons (if any):


__________________________________________________________________________________
__________________________________________________________________________________

Name: ________________________________ Designation: _________________________________

Date: ________________________________ Signature: _________________________________

35
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B5

Load Sanctioning Authority

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Connection Sanctioning Forwarded To


Voltage Load Tariff Category
Category Officer ()

Category 1 230/400 V Up to 70kW All Type of Connections XEN (O)

Above 70kW &


Category 2 230/400 V All Type of Connections SE (O)
Below 500kW
Above 500kW &
Category 3 11kV or 33kV All Type of Connections CE (E)
Below 1MW

Name: ________________________________ Designation: _________________________________

Date: ________________________________ Signature: _________________________________


36
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B6(a)

Net-Metering Technical Feasibility Report for Connections up to 15kW

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Service Connection Details


Consumer Name
Address
Contact No.
Email Address
Sanction Load (kW)
Reference No. Applicable Tariff
Subdivision Feeder/code
Grid Station
Details of already existing energy meter (to be removed):
Make Type
Meter Readings
Serial Number
Month/Year of Manufacturer

Details of Distribution Transformer


Capacity of Distribution Transformer in KVA
Voltage ratio of Distribution Transformer
Solar PV capacity already connected to this
Distribution Transformer in KW
Proposed Solar PV capacity in KW
Total Solar PV capacity including the
proposed new capacity

Feeder Details
Type and Size of the Conductor
Current carrying capacity of the feeder
Maximum load reached on the feeder (KW)
Total connected Distribution Transformer
capacity on this 11kV feeder (KVA)
Solar Photovoltaic generators connected on
this feeder, if any, and their capacity in KW.

DM: _____________________________ L.S. (O): ______________________________

SDO (O): _______________________________

37
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B6(a)

Net-Metering Technical Feasibility Report for Connections above 15kW

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Service Connection Details


Consumer Name
Address
Contact No.
Email Address
Sanction Load (kW)
Reference No. Applicable Tariff
Subdivision Feeder/code
Grid Station
Details of already existing energy meter (to be removed):
Make Type
Meter Readings
Serial Number
Month/Year of Manufacturer

Details of Distribution Transformer


Capacity of Distribution Transformer in KVA
Voltage ratio of Distribution Transformer
Solar PV capacity already connected to this
Distribution Transformer in KW
Proposed Solar PV capacity in KW
Total Solar PV capacity including the
proposed new capacity

Feeder Details
Type and Size of the Conductor
Current carrying capacity of the feeder
Maximum load reached on the feeder (KW)
Total connected Distribution Transformer
capacity on this 11kV feeder (KVA)
Solar Photovoltaic generators connected on
this feeder, if any, and their capacity in KW.

L.S. (O): _____________________________ SDO (M&T): ______________________________

SDO (O): _______________________________

38
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B6(b)

Net-Metering Technical Feasibility Report for Connections up to 15kW

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Distribution System Check:

Sr.# Requirement Compliance Non-Compliance


Total solar PV capacity in kW is not more than 30% of
01
the Distribution Transformer capacity in KVA
Proposed solar PV capacity in kW does not exceed the
02 1.5 times of the sanctioned load of the service
connection in kW
Net Metering connections cumulative load is not more
03
than 15% of the connected HT/LT conductor capacity
Cumulative Load of normal/ conventional/ non-net
metering connections, already installed DG facilities
04
and proposed DG facility, is less than 80% of the
connected Distribution Transformer’s capacity
Proposed interconnection does not require upgrading
05
the capacity of existing distribution network

DG Facility Check:

Sr.# Description Compliance Non-Compliance


01 Inverter
02 Earthing Protection
03 Lightening & Surge Protection
04 Anti-Islanding
05 Circuit Breakers

It is technically feasible to connect the proposed solar PV system to the service connection (Yes or
No): _____________

DM: _____________________________ L.S. (O): ______________________________

SDO (O): _______________________________


39
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B6(b)

Net-Metering Technical Feasibility Report for Connections above 70kW

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Distribution System Check:

Sr.# Requirement Compliance Non-Compliance


Total solar PV capacity in kW is not more than 30% of
01
the Distribution Transformer capacity in KVA
Proposed solar PV capacity in kW does not exceed the
02 1.5 times of the sanctioned load of the service
connection in kW
Net Metering connections cumulative load is not more
03
than 15% of the connected HT/LT conductor capacity
Cumulative Load of normal/ conventional/ non-net
metering connections, already installed DG facilities
04
and proposed DG facility, is less than 80% of the
connected Distribution Transformer’s capacity
Proposed interconnection does not require upgrading
05
the capacity of existing distribution network

DG Facility Check:

Sr.# Description Compliance Non-Compliance


01 Inverter
02 Earthing Protection
03 Lightening & Surge Protection
04 Anti-Islanding
05 Circuit Breakers

It is technically feasible to connect the proposed solar PV system to the service connection (Yes or
No): _____________

L.S. (O): ______________________________ SDO (M&T): ______________________________

SDO (O): _______________________________


40
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

FORM NO: NM/B7

Inspection / Test Check Proforma

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

Details of the Newly Installed Bidirectional Meter


Make Type
Serial Number
Month/Year of Manufacturer
Capacity
Meter constant (for CT-operated meters)
Import register reading (kWh)
Export register reading (kWh)
Accuracy

Solar Generation Check


Make Type
Month/Year of Manufacturer
kWh Reading
Meter constant (for CT-Operated Meters)
Accuracy

Solar Grid Inverter


Make
Serial Number
Capacity
Input DC voltage
Anti-Islanding Protection Check – If the grid fails the status of the contactor (on or off)

Solar PV Modules
Total capacity of solar modules (KW)

Cross-check
Detail Yes/No
Approved Single Line Diagram (SLD) has been followed
Only information provided hardware (as in the application) is installed

SDO (O) SDO (M&T) XEN (O)

__________________ __________________ __________________

41
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING

Form No: NM/B8


Connection Charge Estimate

Application Tracking ID: NM/_____/______/______/____________ Date: ____________

S.No. Particulars Rate Qty. Amount Remarks

Total Cost Estimate

Estimate Prepared By Estimate Approved By


Name __________________________ Name __________________________
Designation __________________________ Designation __________________________
Signature __________________________ Signature __________________________

42

You might also like