Net Metering Connection Application Forms
Net Metering Connection Application Forms
FORMS
Eligibility Criteria
Eligibility Criteria
Vendor/Installer/Service Provider has valid AJKED Net Metering Registration Certificate
Distributed Generator has 3 phase 400V or 11000V connection
DG capacity is not greater than 1.5 times of the Sanction Load
Name of Applicant and Name mentioned on the submitted paid Electricity Bill is same
Documents Checklist
Document
Selected Vendor/Installer/Service Provider’s AJKED issued Net Metering Registration
Certificate
Standard Distributed Generation Application Form (Schedule-II)
Application For Grant Of License (for connections above 25kW) (Schedule-III)
Application for Exemption from Section 24 of the Companies Ordinance 1984 (Schedule-IV)
Load Flow Study & Electrical Inspectorate NOC (for >250kW Connections)
Technical data/Data Sheet of all components including solar modules, inverters, breakers,
wires, cables, disconnect switch etc.
All the relevant documents are signed & stamped by the Vendor/Installer/Service Provider (Y/N): ____
2
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Document
Agreement (Schedule-I)
Schedule-VII
Schedule-IX
Schedule-XIV
NOTE: The Schedules and Forms mentioned above can be viewed/downloaded from the AJKED’s website
www.ajked.gok.pk.
To be filled by the Department or both by the Applicant & Department as per the requirement
on later stage
3
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-II
AJK ELECTRICITY DEPARTMENT
STANDARD DISTRIBUTED GENERATION APPLICATION FORM
(As specified in Rule 3(1))
1. Contact Information: The applicant is the person that is legally responsible for the generating system.
Applicant’s Name Applicant’s Father Name
4
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Name of Firm
Mailing Address
5
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Note: if there is more than one inverters, attach an additional sheet describing each
11. Site Plan showing location of the External Disconnect Switch (attach additional sheets as needed)
13. Other Comments, Specification and Exceptions (attach additional sheets if needed)
6
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-III
AJK ELECTRICITY DEPARTMENT
APPLICATION FOR GRANT OF LICENSE (ABOVE 25KW)
(As specified in Rule 4(2))
1. Name of Applicant:
1(a) CNIC of Applicant/CUIN in case of
Company (Copy to be attached)
1(b) Address:
Office:_____________ Fax:____________
1(c) Contact Nos:
Cell:___________________
1(d) Email Address:
2. Location of DG Facility:
3. Name of Operation Division with which
the DG facility is proposed to be
interconnected
4. Size of DG Facility:
5. Approximate monthly energy proposed
to be supplied to AJKED (kWh):
6. Fee to be deposited:
(Non-Refundable)
Applicant’s Signature
Date
7
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-IV
AJK ELECTRICITY DEPARTMENT
(As specified in Rule 4(2(b)))
I/we (Name of the Distributed Generator) for the purpose of grant of License of Distributed
Generator under AJ&K Distributed Generation (Alternative & Renewable Energy) and Net
Metering Regulations, 2022, hereby request the AJKED for grant of exemption from the
requirement of being registered as a company under the Companies Ordinance, 1984 (XLVII
8
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-V
AJK ELECTRICITY DEPARTMENT
FEE SCHEDULE
(As specified in Rule 4(2(c)))
A Distributed Generator shall be bound to pay the onetime fee through pay order in favor of
9
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-VI
AJK ELECTRICITY DEPARTMENT
AFFIDAVIT
(On Judicial paper of Rs. 50/-)
(As specified in Rule 4(2(d)))
I/we (Name of the Distributed Generator) hereby confirm the I/we have read the AJ&K
Distributed Generation (Alternative & Renewable Energy) and Net Metering Regulations,
2022, AJKED License Agreement and agree to abide by its Terms and Conditions and the
content of the Application are true and correct to the best of my knowledge and belief and
Deponent
Oath Commissioner
10
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-VIII
(As specified in Rule 9)
11
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X
Whereas:-
2.1. The Customer has agreed to purchase Wind / Photovoltaic Distributed Generating (DG)
system of ________ KWp with _______ KW grid tie inverter amounting to PKR
__________.
2.2. The DG Installer is involved in the business of designing, supply and installation of Wind
/ PV systems including after sale support.
2.3. The Customer is desirous of installing Wind / Photovoltaic Distributed Generation
Facility (hereinafter referred to as “the DG Facility”) at the
address of _____________________________________________________________.
2.4. The DG Installer is registered with AJK Electricity Department Net Metering Wing, listed
under the Directory of the Registered DG Installers with registration number
AJKED/NM/____/____/____ and is listed at AJKED’s website at www.ajked.gok.pk.
12
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
3.2. The Customer hereby appoints the DG Installer to Supply and Install the DG Facility at
the Address as stated in Regulation 3 sub-regulation 10 as per requirements of AJ&K
Distributed Generation (Alternative & Renewable Energy) and Net Metering
Regulations, 2022 as amended time to time. The DG Installer shall strictly comply with
the specifications and requirements as stated in the Regulations and standards for the
components of the DG Facility as specified by AEDB/AJKED. Compliance certificate shall
also be rendered by DG Facility as per Schedule-X(e) attached.
3.3. The DG Installer shall be responsible to initiate and get processed application of net
metering connection on behalf of the Customer from start till energization of the
connection.
3.4. The Products and Components and services required for the DG Facility are as set out
the quote which has been agreed between the two parties and are set out in the
Schedule-X(a) and Schedule-X(b) attached.
Any changes (after signing this agreement) to the brand of the products as set out in
the Schedule-X(a) have to be mutually agreed, in writing and made a part of this
agreement, by both the Customer and the DG Installer. Copy of the same has also to
be provided to concerned Operation Division of AJKED for update of its records.
3.5. The DG Installer hereby agrees to provide the Customer the DG Facility performance
expectancy as set out in the Schedule-X(d), attached.
3.6. The Customer hereby agrees to pay the DG Installer for the products (including
components) and installation charges as set out in the Schedule-X(c).
3.7. All payments by the Customer to the DG Installer shall be in the form of cheque, bank
draft (cashier’s order) or electronic transfer. No payment in CASH, shall be made by the
Customer to the DG Installer. All payments must be acknowledged by official receipts
issued by the DG Installer.
3.8. The Customer and DG Installer hereby agree to abide and comply with all rules,
regulations, directives and any written requirement as set out by AJKED / NEPRA / AEDB
/ any other relevant authority.
3.9. All documents in respect of AJKED for the DG Facility shall be executed by the
Customer. However, DG Installer shall provide services in completing the
documentation and processing for obtaining Net Metering Connection as per
Regulations.
3.10. The Customer hereby agrees and covenants to allow the DG Installer, its employees
and person/persons authorized by the DG Installer to enter the address of the
13
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Customer for the purpose of carrying out site survey prior to commencement of works,
the supply and installation of the DG Facility and any other related services and
maintenance.
3.11. The DG Installer agrees to provide a warranty as set out Schedule-X(d). Minimum
warranties required are as follows.
a. Warranty, PV Modules against manufacturing defects, 10 Years.
b. PV Modules, standard performance warranty, 25 Years.
c. Workmanship including locally supplied parts (Except Frames), 5 Years.
d. PV mounting Frames and associated parts, 25 Years.
e. Grid tie inverters, including hybrid, 5 years.
3.12. The DG Installer shall be responsible to the Customer on any warranty claims on
components and equipment.
3.13. Both the Customer and the DG Installer hereby agree and covenant that they shall not,
for the duration of this Agreement executed between them, terminate this Agreement
without the written consent of the other party. Provided that written consent shall only
be granted when the party that intends to terminate the agreement has met all its
obligations under this Agreement. The Customer may terminate the agreement if the
DG Installer fails to deliver satisfactory performance as per agreed schedule. Similarly
DG Installer may terminate this agreement if payment schedule is not met.
3.14. The duration of this agreement shall start from the date of signing this Agreement and
will continue for the period mentioned in warranty clauses.
3.15. The Schedules attached i.e. Schedule-X(a), Schedule-X(b), Schedule-X(c),
Schedule-X(d), Schedule-X(e), to this Agreement shall form part and parcel of this
Agreement and shall be read as part of this Agreement.
3.16. Any date or period mentioned in this Agreement may with the written consent of the
parties be extended failing which time shall be of the essence of this Agreement.
3.17. The provisions of this Agreement shall be binding upon the personal representatives of
each of the parties being an individual.
3.18. Each party confirms that this Agreement sets out the entire agreement and
understanding between the parties and that it supersedes all prior agreement,
arrangement and understanding between them and that they are not entering into this
Agreement or any arrangement contemplated or in reliance upon any representation
or warranty not expressly set out in this Agreement.
3.19. No failure or delay by any party in exercise of any right, power or privilege under this
Agreement shall operate as a waiver of it nor shall any single or partial exercise by such
party of any right, power or privilege preclude any further exercise of it or the exercise
of any other right or privilege.
3.20. No party shall have the right to assign any of the rights, liabilities or benefits set out in
this Agreement without the prior written consent of the other party having been first
obtained.
3.21. Each party shall bear its own costs, legal fees and other expenses. The stamp duty for
this Agreement, if any, shall be borne by the Customer.
3.22. No provision of this Agreement shall be amended, modified, varied, waived or
discharged otherwise than by the express written agreement of the parties to it nor
14
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
may any breach of any provision of this Agreement be waived or discharged except by
the written consent the other party.
3.23. In the event of any conflict between the provisions of this Agreement and any other
document, the provision of this Agreement shall prevail.
3.24. All notices required to be given under this Agreement shall be in writing and shall be
given or sent to the party concerned by hand or by Registered Post at the address set
out in this Agreement or at such other address as the parties may so inform the other
in writing.
3.25. This Agreement shall be deemed to be a contract made in AJ&K and shall be interpreted
in all respect in accordance with Laws of AJ&K/Pakistan.
IN WITNESS WHEREOF the parties hereto have hereunto set their hands the day and year first
above written.
Company Stamp
Witness
Name, _________________________________, Designation ______________________,
CNIC ______________________.
Witness
Name, _________________________________, Designation ______________________,
CNIC ______________________.
15
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X(a)
16
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X(b)
Quotation by DG installer (on company letter head and bearing company stamp) and
bearing acceptance signatures, name, date and CNIC Number of the customers
17
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X(c)
PAYMENT SCHEDULE
18
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X(d)
Note:
I. In case the system does not yield promised yield, installer promises to rectify till
guaranteed yield is delivered.
II. This guarantee is subject to:
a. No tempering by any un-authorized person
b. Regular maintenance services hired from installer.
c. Not valid under force majeure condition, natural or man-made disasters.
d. Yield could vary ±10% depending upon location.
19
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-X(e)
20
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
a) The maximum variation in output voltages of the inverter used _________ (Value) which
is less than permissible ±5%
b) The maximum variation in output frequency of the inverter used_________(Value)
which is less than permissible ±1%
21
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-XI
22
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-XII
APPLICATION SUMMARY
CLIENT INFORMATION
Name
CNIC
Address
Mailing Address
Cell Ph. # Email Address
Subdivision Feeder Name
Reference No. Customer ID
Meter Number Bill Tariff
Issuance Date of Attached Bill
Sanction Load Required Load
Net Metering Residential Consumption of Client Total kWh Production Surplus kWh
Details
SYSTEM INFORMATION
PV System Category Residential Commercial Industrial Agricultural
Supply Voltage Level 11 kV 400 V
System Size
Panel Make Panel Model
Inverter Capacity Rated Capacity = Inverter Type On Grid Off Grid
Inverter Make Inverter Model
Inverter Serial No.
For more than one make/model of panels on a single inverter, use this area to define the additional solar panels
Second Set of Make Model No. of Panels Watts/Panel kW of 2nd Set of Panels
Solar Panels
Second Set of Make Model Rated Capacity Inverter Serial Number
Solar Panels
Overall System Size (kW)
23
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
24
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE – I
The Distributed Generation Interconnection Agreement (the “Agreement”), is made and entered
in to this ______________ (day) of ______________ (month), _________________ (year) by and
between _________________________________ hereinafter called “AJKED” and
_______________________ hereinafter called the “Applicant”. Applicant shall be 3 phase 400V or
11kV AJKED’s consumer. AJKED and the Applicant are hereinafter collectively referred to as the
“Parties” and individually as a “Party”.
RECITALS
A. AJKED is the owner of the electric distribution system in the state of Azad Jammu & Kashmir
(AJ&K).
B. Applicant desires to install a Distributed Generator (DG) facility or energy storage device using
solar or wind energy resources with a capacity greater than 1 KW but no more than 1 MW,
including related interconnection equipment (the “DG Facility”) and to interconnect the DG
Facility to the AJKED’s distribution system.
C. AJKED has previously reviewed and approved Applicant‘s DG Interconnection Applicant Form
dated _____________, and supporting materials (the Application”). The completed
Application is attached as Exhibit 1 and incorporated into this Agreement.
D. Applicant wishes to interconnect the DG Facility to AJKED’s distribution system and AJKED is
willing to permit such interconnection subject to the terms and conditions set forth: (1) The
completed Application approved by AJKED; (2) this Agreement.
E. No agency or partnership is created with the interconnection of the applicants DG Facility.
AGREEMENT
NOW THEREFORE, in consideration of the foregoing Recitals and for good and valuable consideration,
the AJKED and Applicant agree as follows:
1. Design Requirement:
The DG Facility shall be installed in compliance with the AJ&K Distributed Generation
(Alternative & Renewable Energy) and Net Metering Regulations, 2022.
2. Applicant’s Representations and Warranties:
Applicant represents and warrants that:
i The DG Facility is fully and accurately described in the Application;
25
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
neither party shall be indemnified hereunder for its loss, liability, damage, claim, cost,
charge, demand, or expense resulting from its sole negligence or willful misconduct.
5.3 The indeminitor shall, on the other party’s request, defend any suit asserting a claim
covered by this indemnity and shall pay for all costs, including reasonable attorney
fees, that may be incurred by the other party in enforcing this indemnity.
5.4 The provisions of this Section shall not be construed to relieve any insurer of its
obligations to pay any insurance claims in accordance with the provisions of any valid
insurance policy.
5.5 Except as otherwise provided in this section, neither party shall be liable to the other
party for consequential or remote damages incurred by that party.
7. Access to DG Facility:
Applicant shall permit AJKED’s employees and agents to enter the property on which the DG
Facility is located at any reasonable time for the purposes of inspecting and/or testing
Applicant’s DG Facility to ensure its continued safe and satisfactory operation and the
accuracy of AJKED meters. Such inspections shall not relieve Applicant from its obligation to
maintain the DG Facility and any related equipment owned by Applicant in safe and
satisfactory operating conditions. AJKED shall have the right to witness any testing by
Applicant of the DG Facility.
Engineer Electricity. The decision of the Chief Engineer shall be final and binding on both the
applicant and Electricity Operation Division/Net Metering Wing AJKED.
a) AJKED may limit the operation and/or disconnect or require the disconnection of a DG
facility from AJKED’s Distribution System at any time, with or without notice, in the event
of fault. AJKED may also limit the operation and/or disconnect or require the
disconnection of DG facility from AJKED’s Distribution System upon the provision of 30
days written notice for the conditions which including as follows
- To allow for routine maintenance, repairs or modifications to AJKED’s Distribution
System;
- Upon AJKED’s determination that DG facility is not in compliance with these Rules;
- Upon termination of the Agreement.
b) This Agreement may be terminated in accordance with the AJ&K Distributed Generation
(Alternative & Renewable Energy) and Net Metering Regulations, 2022.
c) The Distributed Generator may terminate the agreement upon thirty days written notice
if the Distributed Generator determines to discontinue the sale of electricity to AJKED.
d) The concerning Electricity Operation Division shall not terminate the Agreement in any
event without prior approval of the Net Metering Wing AJKED/Chief Engineer.
e) All rights and obligations accrued up to termination shall continue in force upon
termination.
28
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
b) Assignment by AJKED. AJKED shall have the right to assign this agreement in whole upon
written notification to the Applicant.
c) Successors. This Agreement shall be binding upon the personal representatives, heirs,
successors, and permitted assigns of the respective Parties.
Applicant Signature & Date AJKED’s Signature with Seal & Date
Title Title
Witness No.1 (Name & Signature) Witness No.1 (Name & Signature)
Witness No.2 (Name & Signature) Witness No.2 (Name & Signature)
29
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-VII
AJK ELECTRICITY DEPARTMENT
GENERATION LICENSE TEMPLATE FOR ABOVE 25KW
(As specified in Rule 4(3))
___________________
AJKED
___________________
30
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-IX
AJK ELECTRICITY DEPARTMENT
NET METERING APPROVAL
(As specified in Rule 3(7-a))
1. The Executive Engineer Operation Division _______________ AJK Electricity Department hereby
grants Net Metering approval to write applicant name, for ____ KW photovoltaic solar based
Distributed Generation facility, having Application Tracking ID NM/____/____/________/______,
located at write applicant address, under the AJ&K Distributed Generation (Alternative &
Renewable Energy) and Net Metering Regulations, 2022, for a period of seven (7) Years. This
approval is valid upto write expiry date.
2. The Net Metering approved Distributed Generator shall abide by the provisions under the AJ&K
Distributed Generation (Alternative & Renewable Energy) and Net Metering Regulations, 2022,
during the currency of Net Metering connection.
3. The Technical parameters of Net-Metering arrangement are as under:
1. Primary Energy Source Solar
2. Size of Distributed Generation Facility _____ kW
3. Generator/Inverter Information
Manufacture _________
Mode No. _________
4. Vendor/Installer _________
5. Generation Type Inverter
4. This approval may be renewed subject to AJ&K Distributed Generation (Alternative & Renewable
Energy) and Net Metering Regulations, 2022.
Executive Engineer
Operation Division______
AJK Electricity Department
Copy to:
1. Superintending Engineer (E), Circle__________
2. Deputy Director (Net Metering Wing), Directorate P&M AJKED Muzaffarabad.
3. Sub Divisional Officer Operation Sub Division______________.
4. Revenue Officer (E), Operation Division_____________.
Executive Engineer
Operation Division______
AJK Electricity Department
31
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
SCHEDULE-XIV
To,
______________________
Electricity Operation Division ______________,
AJ&K.
Note: This NOC does not impose the compulsion for the issuance of Net Metering connection/generation license. The Net
Metering connection issuance is subjected to fulfilling all the conditions given in the AJ&K Distributed Generation (Alternative
& Renewable Energy) and Net Metering Regulations, 2022 and AJKED approved guidelines/SOPs for Net Metering.
Director
Planning & Monitoring
AJKED
32
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
33
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
DOCUMENTS CHECKLIST
All the relevant documents are signed & stamped by the Vendor/Installer/Service Provider (Y/N): ____
NOTE: The Schedules mentioned above can be viewed/downloaded from the AJKED’s website
www.ajked.gok.pk.
34
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
The eligibility criteria labelled as symbol “” (if any) in the table given below, required for the
registration as Vendor/Installer/Service Provider with AJKED is non-compliant:
The documents labelled as symbol “” (if any) in the table given below, required for the registration
as Vendor/Installer/Service Provider with AJKED are missing/invalid:
35
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Feeder Details
Type and Size of the Conductor
Current carrying capacity of the feeder
Maximum load reached on the feeder (KW)
Total connected Distribution Transformer
capacity on this 11kV feeder (KVA)
Solar Photovoltaic generators connected on
this feeder, if any, and their capacity in KW.
37
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
Feeder Details
Type and Size of the Conductor
Current carrying capacity of the feeder
Maximum load reached on the feeder (KW)
Total connected Distribution Transformer
capacity on this 11kV feeder (KVA)
Solar Photovoltaic generators connected on
this feeder, if any, and their capacity in KW.
38
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
DG Facility Check:
It is technically feasible to connect the proposed solar PV system to the service connection (Yes or
No): _____________
DG Facility Check:
It is technically feasible to connect the proposed solar PV system to the service connection (Yes or
No): _____________
Solar PV Modules
Total capacity of solar modules (KW)
Cross-check
Detail Yes/No
Approved Single Line Diagram (SLD) has been followed
Only information provided hardware (as in the application) is installed
41
AZAD JAMMU & KASHMIR ELECTRICITY DEPARTMENT
DIRECTORATE PLANNING & MONITORING, NET METERING WING
42