The document describes a job hazard analysis for earth pit construction, maintenance, and testing work. It outlines potential hazards, required safety controls and responsibilities, permit requirements, required personal protective equipment and training, and specialized skills needed. The analysis is intended to ensure work is completed safely.
The document describes a job hazard analysis for earth pit construction, maintenance, and testing work. It outlines potential hazards, required safety controls and responsibilities, permit requirements, required personal protective equipment and training, and specialized skills needed. The analysis is intended to ensure work is completed safely.
The document describes a job hazard analysis for earth pit construction, maintenance, and testing work. It outlines potential hazards, required safety controls and responsibilities, permit requirements, required personal protective equipment and training, and specialized skills needed. The analysis is intended to ensure work is completed safely.
The document describes a job hazard analysis for earth pit construction, maintenance, and testing work. It outlines potential hazards, required safety controls and responsibilities, permit requirements, required personal protective equipment and training, and specialized skills needed. The analysis is intended to ensure work is completed safely.
Download as DOCX, PDF, TXT or read online from Scribd
Download as docx, pdf, or txt
You are on page 1of 2
DEPARTMENT & SECTION - Central Electrical Maintenance-MTST
SOP No. CELMECH ENTERPRISE PRIVATE
IMS/M/CEM/MTST/SOP-03 LIMITED LOCATION OF JOB – BFPP JOB HAZARD ANALYSIS JOB DESCRIPTION – Earth Pit Construction, Maintenance & Testing TEAM – CELMECH ENTERPRISE PRIVATE LIMITED SEQUENCE OF BASIC JOB POTENTIAL HAZARD SAFEGUARD/CONTROLS TO BE PUT IN PLACE RESPONSIBILITY STEPS 1. Before going to job ensure to have all tools & tackles should be available in safe condition. All materials required for Earth Pit making with proper material challan. 3. Use barricading tape, green, red flag. 4. Conduct toolbox talk to educate the workers regarding the job & Use proper PPE. If new person joined the working group, then conduct tool box talk again among them. Job Preparation & Safety Contract Manpower Specific hazards related to area of work 5. Identification of six directional hazards Induction around the working area by the help of concern dept. and discuss with all working team and take care of them. Arrange appropriate tools and equipment to perform job. 6. Survey the digging area and check the certification of the vehicle and tools which are going to use in pit digging. Do not use mobile phone during work.
1. Take proper relevant work permit (I.e.-
excavation permit) from concerned dept. 2. Take six direction clearance from Engineer/ 1. Hazard at high voltage concerned authority. Supervisor/ Skilled Work Permit 3. If any energy source is identified, to be Other energy source in the vicinity Electrician/ Contract mentioned in working clearance form. Manpower Take confined space clearance (If work area is confined).
1. Take proper power clearance from
concerned authority. 2. Check positive isolation as per ESI for Earth pit testing of running equipment. Also put personal box in positive isolation box. Engineer/ 3. Take care of live surrounding cables and other Supervisor/ Skilled Power Clearance CELMECH ENTERPRISE PRIVATE LIMITED JOB HAZARD ANALYSIS Required PPE Required tools & equipment Required training Special skilled employees