T.suhin DCS Operator-1
T.suhin DCS Operator-1
T.suhin DCS Operator-1
SUHIN THIRUMANI
Kuwait
Date:
Respected Sir,
I would like to take this opportunity to present my candidature for your perusal.
Please find attached a copy of my resume for your review. I am highly hardworking, diligent and have a
strong ability to work in a demanding team-oriented project. Kindly give me an opportunity to serve your
organization.
I am fully confident that I will be able to carry out the duties entrusted to the entire satisfaction of my
supervisors.
It would be a great honor on my part to be given the opportunity to work with you.
Thanking you,
Yours sincerely,
SUHIN THIRUMANI
Mob. +965-60679855
PRODUCTION OPERATOR
T. suhin,
Amman kovil street,
Madampillaidharmam,
Rajakrishnapuram (P.O),
Tirunelveli (Dist.)- Tamil Nadu, India.
India Mobile : +919384310136
Kuwait Mobile : +965-60679855
E-mail : [email protected]
Personal Information
Date of Birth : 28/03/1997
Marital Status : single
Nationality : Indian
Languages Known : English, Hindi, Tamil and Malayalam.
TECHNICAL SKILLS : MS Office – Word, Excel & Power Point, Internet & E-mail
Passport Details:
Passport Number : R7234161
Date of issue / Expiry : 19/01/2018 ;18/01/2028
Employer : Crain energy India Rajasthan (RGT Onshore & Rig work over )
Designation : DCS plant operator
Period : April 2020 to Nov 2022
Responsible for the safety of the crew, daily rig tickets and inventory, for a while, the
confidence to move up in position Skills Used Supervisory.
Responsible for crew safety, crew transportation, and inventory, Used Supervisory,
operated machinery, material handling, mathematics.
Maintenance and upkeep of gas wells, responsible for the flow back and clean up of wells
after fragmentation.
Perform duties too varied and diverse to be classified in any specific office clerical
occupation, requiring limited knowledge.
Operate a work over rig servicing oil well and drill outs and operate mud pumps and
loaders.
Rig Operator operating work over rig, swab fluids, chemical treating wells, move set adjust
tools, trip pipe out of well, drill, sampling tools.
Have regular checks off all equipment and unit to ensure that they are functioning correctly in accordance
with standard operation procedure.
Start up and shutdown according to the instructions safety orders and procedures (SOP).
Know how the components work in well control systems to optimize them according to the
customer’s need. Have a proper understanding of rig floor mud manifold, inside bop, bop stack,
choke & kill lines,bop accumulator bop control manifold, etc.
Have proper knowledge of drilling rig floor systems and rig components used in the rig procedures.
Aware of hoisting system components in drilling rig like crown block, traveling block,top drive,
rotary table, draw works, drilling line, deadline anchor.
Understand the functions of drilling rig equipment used on the surface and in the subsoil. It consists
of drill pipe casing, fluid system, cement, and drilling bit Be aware of the proper personal protective
equipment (PPE) to ensure safety during drilling activities. It includes safety glasses with side shields,
hard hats, boots, and protective gloves.
As the Tool pusher’s duties are primarily administrative, he must also be familiarized with office
tools such as mobile phones, faxes, and computers.
Know about the functioning of mud circulatory system components of drilling rigs.For instance,
know the adequate functioning of mud pits, mud pumps, mud mixing hoppers,mud pumps (high
and low pressure), and shale shakers Acknowledge the proper functioning of blowout preventers for
monitoring the oil and gas wells. Also, tool pusher should have a proper understanding of floor and
underwater equipment.
WORK EXPERIENCE:
Well Head Operations, work over rig, sucker rod & tubing running in, pullout ,Down hole pump
operation, mud pump operation ,fishing ,SRP operation PCP, WELL killing ,troubleshooting ,
Boosters, DE salter Three Phase Separators High pressure Centrifugal compressors, Gas Turbine
(GEC) and also steam Turbines (SIEMENS), Closed and Open Drain Vessels. injection well, SRP
well.
Well head a PCP at 4,248.05 ft. setting depth failed after 60 days due to a broken rotor. Attempts to
fish the parted rotor were unsuccessful. To avoid a work over rig and to reduce non-productive
time (NPT), a SRP system with an insert pump anchor was set over the failed PCP system at 4,028
ft. via a flush by unit. A tubing punch job from 4,085 to 4,145 ft. was done for allowing the fluid
entering the tubing and passing through the SRP system.
Running a SRP with an insert pump anchor enabled the pump to be set at any depth inside the
tubing, above the failed PCP system. Successful installation of the SRP system reduced NPT and
standby costs, and eliminated the need for a work over rig. While running the SRP system, the
production enhanced by 50% more than the PCP’s maximum recorded rate. On the other hand,
the pump can be retrieved and/or the artificial lift method can be converted later on without the
requirement of a work over rig.
Flush by unit
The compact design offers quick mobilization and increased maneuverability in tight, constricted spaces,
enabling deployment into smaller well sites than a standard work over rig can access.
High-pull capacity increases the range of well depths the unit can service.
flush by unit is a compact, continuous-rod and conventional sucker-rod service solution that merges the
features of a pressure truck and small rod rig to diagnose and troubleshoot wells. Designed for rapid
deployment and safe operation, the Flush by unit consists of a fluid tank, triplex pump, freestanding mast
assembly, and full set of tools and safety equipment. With a standard or heavy-duty injector, the unit trips
and services continuous-rod strings efficiently without the use of additional equipment. The unit can
service shallow- to high-depth oil, gas, and coaled methane (coal-seam gas) wells in vertical wellhead
configurations.
Pulling and running rod strings
Fishing rod strings
Changing insert pumps (progressing cavity pumping [PCP] and reciprocating rod-lift [RRL])
Changing plungers (RRL)
Changing rotors (PCP)
Killing wells–
Flushing productions wells
Changing wellhead valves
Changing polished rods
Pressure-testing wells
Spacing and re spacing rod strings
SRP
In a sucker rod pump system, a surface pumping unit converts the rotary motion of a prime mover into
a reciprocating action. The reciprocating action is transferred to a positive displacement pump located
down-hole. Oil and gas lifting work use SRP This control by SPM Panel .
After the crank completes the above suction process, it continues to rotate counterclockwise. At this time,
the piston starts to move toward the hydraulic end (left side in the figure), and the liquid in the cylinder is
squeezed. The pressure rises, the suction valve closes, and the discharge valve is closed. Top open, liquid
enters the discharge pipe until the piston moves to the left stop. This process is called the pump discharge
process. As the power machine continues to operate, the reciprocating pump continuously repeats the
process of inhaling and discharging, and the liquid in the suction pool is continuously sent to the bottom
of the well through the discharge pipe.
The distance the piston moves in the cylinder is called the stroke length of the piston; the number of
reciprocations of the piston per minute is called the stroke of the piston.
Well killing
A well kill is the operation of placing a column of special fluids of the required density into a well bore
in order to prevent the flow of reservoir fluids without the need for pressure control equipment at the
surface.
Operation of Christmas tree, Flow Line Flushing Job, SSV, SSSV & Choke Operations. Flow line
Choke changing, STHP, FTHP, Well Maintenance, work over, well Completion, Back Pressure
Value Operation, Water Injection, Chemical Injection, PIG Launching & receiving, inspection of
pipelines for leakage & puncture. Well Annulus Pressure Bleeding, safety value testing, lower
and upper Master value, wing value, Arm Value, Adjustable choke & crown value operation.
Well opening, closing operation & Trouble Shooting.
Lube oil pump, Booster pump. Main pump & Inhibitor pump operation. Lube oil pressure
Maintain cooling water pump operation. Lube oil level maintain, Main break operation, Chemical
Injection, Water sample, MOV operation, Vibration check. Speed Trouble shooting, etc., Inject
high pressure Dehydrated gas into well reservoir, operation & maintenance of multistage
compressors, Scrubber, intercoolers, after coolers, Separator Startup & Shut down operations of
Compress at Gas Injection unit.
EPF (EARLY PRODUCTION FACILITY)
Production manifold, Test manifold operation, MPFM, HIPPS, Pre heater, Electrostatic heater
treated, Flash Vessel, Oil Booster pumps, Electro static DE salter, Crude oil Stripping column,
Oil Transfer pumps, Product cooler, crude Surge Tank, Off-spec Tank, Light oil Tank, Export
Booster Pump Export main oil pumps, Metering Skid.
FIRE & GAS EQUIPMENT:
Dry Chemical powder and CO2 Fire Water sprinkler system, fusible plugs, deluge valve, foam
tank, fire automatic / manually release system, fire and gas detectors, H 2S & flare fuel gas system
and water seal.
Declaration:
I hereby declare that the particulars furnished above details are true and correct to by
best of my Knowledge and belief
Place:
Date: ( T.
suhin)