INTRODUCTION TO MUD
ENGINEERING
Weighting material :-
1. Hematite ( Ferrous Oxide ( 4.9-5.26) gm/cc)
2. Barite ( Barium Sulphate (4.2) gm/cc)
3. Calcium Carbonate fine ( CaCO3)
4. Salts:-
a) NaCl
b) CaCl2
c) CaBr2
d) KCL
Preservative Chemicals:-
1. Biocide ( Anti Bactria degradation )
2. All kind of salts arepreservatives
3. All PH controlers are preservatives
Scavengers:-
1. NO-OX PC-100 ( Oxygen Scavengers which removesany
free Oxygen in mud and Minimize theCorrosion
2. H2S Scavengers ( Scavenge H2S and minimizecorrosion
which are caused by H2S gases
Corrosion inhibitors:-
1 NOCOR C825 (Anti corrosion )
2 Amifilm ( Amine Base used to Coat drill pipe to prevent
corrosion
3All PH control chemicals specially most strong of them
which is caustic soda and lime and increase PH can work as
Corrosion Inhibitors
4also Biocide can work as Corrosion inhibitor because it
kills bacteria
Anti Foam Categories :
No Foam SB30 ( all anti Foam working on scientific base of
reducing surface tension
𝐷×𝐿×𝐸𝑓
Pump output = \
1029.4
Blending mud = 𝑉1×𝑊1+𝑉2×𝑊2
𝑇.𝑉𝑜
21.4 𝑙
Dilution : = X second
𝑁𝑜.𝑜𝑓 𝑅𝑒𝑞.𝐵𝐵𝑙
Tank Capacity :
capacity= length * width * High
No. of 𝑚3 should be multiply by 6.25 bbl because
1𝑚3= 1000 liter /159 =6.25 bbl
Bbl/cm = Total Bbl/high
Shut In Drill Pipe (SIDP):
SIDP=Mwt *0.052*TVD(ft)
Evaporation Rate:-
Bbl/hr: (%RW/0.18)*0.006(0.0344∗𝐹𝑙𝑜𝑤𝑙𝑖𝑛𝑒 𝑇𝑒𝑚.)
Cut mud weight :
𝑉1(𝑀𝑊1−𝑀𝑊2
X=
𝑀𝑤2−8.33
Treat out required mg/l of Calcium :
Soda ash:0.00092*req. mg/l
Sodium bicarbonate: 0.00074* req. mg/l
SAPP= 0.00097* req. mg/l
Cement job
1. Be sure you have enough room in your tank
2. Remember the difference between pumping cement and
displacement (pumping no losses as cement still inside casing
) displacing could observe lossesas cement in open hole
3. Before pumping of spacer we have to measure the surface of all
the tanks (active tank)
4. During pumping cement inside casing you have to be there
beside cement unit to check the cementweight
5. You have to take a few sample of lead and tail slurry togive
DSV
6. You have to float between mud tank to check the level and
shaker and be sure that the displaced mud go in the mud tank
that is planed to takeit
7Mud logger you have to keep good communication with
mud logger during cement job because both ofyou
have to get very close figures about gaining or losing
after cement job anddisplacement
8take measurement before pumping cement and after
cement , according your going to mud logger for
checking gains and losses
We have two scenarios for pumping cement :
1- reverse circulation
2- normal pumping inside string
Displacement of mud
1 we have to calculate hole volume
2we have to calculate active system include sand trap to
calculate how many bbl we need (minimum)
3build (mix) spacer to minimizecontamination
between old and new mud
4 choose short system with old mud to drill cement
*short system mean we make small tank with old mud to
drill cement and returned back to same tank then we
can dump it…
5 first things to pump spacer followed by new mud
*note: we must calculate time and tell mud boy to
weight mud we appear new mud we must stop dumping
And new mud we must put it to suction tank to hole
make normal circulation
6circulate new mud till mud become homogeneousand
add some chemicals if it need like increase mud weight
or decreaseviscosity
7take a sample and makefull test and what is resultif
its need chemicals apply it till become good mud
Formation problem and prevent It
Dolomite : with this formation we get high magnesium
we must increase PH above 10
Limestone and anhydrite : in those formation we must
have free water inside mud by water dilution free water
make dissolve limestone and anhydrite give us calcium
this make prevent dropdown PH
Shale: this formation we have bit balling , pack off
Sandstone: possible losses increase solid content (sand
content) we can use screen above 140 API
Limestone : always fractured and cause possible losses
We can control it by LCM this is only formation if we get
stuck pipe we can make it free by HCL and this is only
formation it will not effect PH … it can be reservoir
*Note:-
Siltstone means Shale + sand
Argillaceous limestone : means porous limestone
cemented with shale (clay)
Down hole problems
Losing fluid while drilling :-
1. Seepage losses : <10 bbl/hr
2. Partial losses : 10-60 bbl/hr
3. Total losses : non return of mud
We can fix it by pumping LCM
Bit balling :it means the cutting stick around the bit on
bottom and off bottom there was not torque we have to
prevent it by adding the inhibitors of shale to be not sticky
inside the mud but if it happen partially first we pump
LCM Nut Plug with free drill and other kind of LCM
LCM Nut Plug pill to fix bit balling:-
1 bitclean pill mud from active treat with 3% of bitclean
22% bitclean on active mud 20-40 ppb of nut plug fine
medium
3-2% free drill with 20-40 ppb Nut plug with mud on
active
4- three of above together
But if happen on surface we can use water with caustic
soda till PH reach 14 and pumped the bit will be clean
this is we can use with normal mud without any
weighting material to avoiding barite settling almost 3
ppb of caustic soda we can use it
Stuck pipe:
1 deffrential stuck pipe :-
You can not rotate .. But you can circulate it happens
when hydrostatic pressure of mud exceeds theformation
pressure we can fix it by adding kwikspot and improve
the filter cake
2 mechanical stuck pipe:
You can not rotate , you can not circulate , but you can
reciprocate we can fix if it not by HCL , and other chose
breaking drill string fishing it or sidetrack,
General information
Calibration of VG meter, Retort , Marsh funnel , Mud
balance
Increasing mud weight using KCl & Salt withcalculating
desired amount needed by table
High bentonite in mud with high mud weight how to fix it?
Quantity from recipe change to field unit like ( Drums,
sacks , Pail )
Foam inside mud where is coming and how to fix it
What is the different between stabilizer and centralizer ?
Flow over shaker how to fixit
Jack or nut when we run casing
Difference between caving cutting and pressurized
cutting on shaleshaker
Difference between sodium carbonate andsodium
bicarbonate while treating cement
Key setting and reason that make this problem
What is F.I.T and L.O.T
Solid control equipment and dewatering how it work
Thanks