2313-4005-001 Rev Na
2313-4005-001 Rev Na
2313-4005-001 Rev Na
CONTINUOUS
KW kVAR kVA
415V SUPPLY SWITCHBOARD (SW23B10) (FOR DETAILED LOAD LIST REFER SHEET 002) 2.96 1.33 3.25
INTERMITTENT
KW kVAR kVA
415V SUPPLY SWITCHBOARD (SW23B10) (FOR DETAILED LOAD LIST REFER SHEET 002) - - -
EMERGENCY
KW kVAR kVA
2.0 DIESEL DISPENSER AREA DB POWER SUPPLY FROM DB-TW (AUTO ELEC WORKSHOP)
FOR BINDING
CONTINUOUS
KW kVAR kVA
415V SUPPLY SWITCHBOARD (DBTW) (FOR DETAILED LOAD LIST REFER SHEET 003) 1.94 0.86 2.13
INTERMITTENT
KW kVAR kVA
415V SUPPLY SWITCHBOARD (DBTW) (FOR DETAILED LOAD LIST REFER SHEET 003) - - -
EMERGENCY
KW kVAR kVA
MEASURED
=A/B factor c P=PVC
CURRENT
RESTARTING
LOAD REMARKS
NON-ESSENT
factor c
ESSENTIAL
INTERMITTENT X=XLPE OR EPR
ITEM NO.
CONTINUOUS STAND-BY
PANEL
AND SPARES
VITAL
RATING=SITE RATING
EQUIPMENT NO. DESCRIPTION
IN IN
A B C D kW kvar E kW kvar F kW kvar G
DEC. DEC.
kW kW DES. ACT. COS DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. NO. P/X Sq.mm RATING
1 P5096A Diesel Transfer Pump 2.5 4 0.63 0.86 0.91 2.9 1.3 4 X 4
2 DB5093-R-LF3 Diesel Transf.Pump Lighting 0.116 0.1 1.16 0.90 0.99 0.1 0.0 3 X 2.5 Single Phase
10
11
12
13
14
15
16
17
FOR BINDING
18
19
20
21
22
23
24
25
26
Maximum of Normal Running Plant Load: 3.0 kW: 1.3 kvar SQRT(kW2+kvar2) = 3.25 KVA Power factor without compensation (cos ) 0.91
(Est. x % E + y % F) TOTAL 3.0 1.3 0.0 0.0 Power factor with compensation (cos ) :
Peak Load: 3.0 kW: 1.3 kvar SQRT(kW2+kvar2) = 3.25 KVA required capacitor rating [=kW (tg -tg )] :
E "continuous" all loads that may continuously be required for normal operation, including lighting and workshops. Note 1) For definitions of "Vital", "Essential and "Non-Essential" Services refer clause 8.2.1 of ES.2.03.0001 Electrical System Design
F "Intermittent and spares" the loads required for intermediate pumping storage, loading, etc and all electrical spares of Note 2) For peak load estimation the coincidence factors have been considered as follows : x=100%, y=50% & z=0%
G "stand-by" loads required in emergencies only such as fire-water pumps or those of normally not running electrically driven Note 3) Absorbed Load shall be : For pumps shaft load at duty point, for instrumentation/computers/commuincaition and air conditioing the required load
units on stand-by for normally running steam driven ones(e.g. charge pumps, boiler feed pumps.) during full plant operation, fotr lighting during dark hours and for workshops the average load in normal operation
MEASURED
=A/B factor c P=PVC
CURRENT
RESTARTING
LOAD REMARKS
NON-ESSENT
factor c
ESSENTIAL
INTERMITTENT X=XLPE OR EPR
ITEM NO.
CONTINUOUS STAND-BY
PANEL
AND SPARES
VITAL
RATING=SITE RATING
EQUIPMENT NO. DESCRIPTION
IN IN
A B C D kW kvar E kW kvar F kW kvar G
DEC. DEC.
kW kW DES. ACT. COS DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. DES. ACT. NO. P/X Sq.mm RATING
1 Z-5017C/D/ E Diesel Dispensers - 3 off 1phase 0.4 0.55 0.73 0.60 0.70 0.7 0.7 5 X 2.5 36 Load / unit / phase
2 DB5093-5R-LF1-3 Tank T5072 Lighting 0.35 0.35 1.00 0.95 0.99 0.4 0.1 5 X 2.5 36 Single phase
DB5093-6RYB-LF4-
3 Diesel Dispenser area lighting 0.864 0.864 1.00 0.95 0.99 0.9 0.1 5 X 2.5 36 Three phase
LF17
4
10
11
12
13
14
15
16
17
FOR BINDING
18
19
20
21
22
23
24
25
26
Maximum of Normal Running Plant Load: 1.9 kW: 0.9 kvar SQRT(kW2+kvar2) = 2.13 KVA Power factor without compensation (cos ) 0.91
(Est. x % E + y % F) TOTAL 1.9 0.9 0.0 0.0 Power factor with compensation (cos ) :
Peak Load: 1.9 kW: 0.9 kvar SQRT(kW2+kvar2) = 2.13 KVA required capacitor rating [=kW (tg -tg )] :
E "continuous" all loads that may continuously be required for normal operation, including lighting and workshops. Note 1) For definitions of "Vital", "Essential and "Non-Essential" Services refer clause 8.2.1 of ES.2.03.0001 Electrical System Design
F "Intermittent and spares" the loads required for intermediate pumping storage, loading, etc and all electrical spares of Note 2) For peak load estimation the coincidence factors have been considered as follows : x=100%, y=50% & z=0%
G "stand-by" loads required in emergencies only such as fire-water pumps or those of normally not running electrically driven Note 3) Absorbed Load shall be : For pumps shaft load at duty point, for instrumentation/computers/commuincaition and air conditioing the required load
units on stand-by for normally running steam driven ones(e.g. charge pumps, boiler feed pumps.) during full plant operation, fotr lighting during dark hours and for workshops the average load in normal operation