Training Activity Matrix (Brood and Grow Chicks)
Training Activity Matrix (Brood and Grow Chicks)
Venue
Training Activity Trainee Facilities/Tools (Workstatio Date & Remarks
and Equipment n/Area) Time
Preparation of Campo, Gonzalo P. Poultry Chicken Poultry August 8, Area and
Training De Real, Alhem D. NC II Chicken NC 2017 Facilities were
Area/Facilities/ Facilities/Tools II Training 7:00- 7:30 prepared
Laboratory and Equipment Laboratory am
Prayer Old Trainees
1. Barrun, Edalyn Micropho Old trainees
C. Contextual 7:30- 8:30 were assigned
Checking of ne
2. Basco, Julie N. Learning am to conduct the
Attendance Speaker
3. Campo, Area (1 hour) opening
Projector
Motivation Gonzalo P. Laptop activities and
4. Danao, April Attendanc were brought
Recap of Lyn D e sheet to their
activities/less 5. Delacruz, Amy Table respective
on E. Chair workstation
6. Delacruz, after the
Feedback of Cherry A opening
Training 7. Delacruz, program
Florencio D.
Assign old 8. De Real,
trainees to Alhem D. New trainees
their 9. Evangelista, were
respective Rey L. acknowledge
area/activity 10. Ichon, properly
Anthony E.
11. Inopia,
Lourdes E.
12. Mingoy,
Emmanuel B.
13. Montilla,
Mike M.
14. Real,
Marlene L.
15. Sabater,
Joel G.
New Trainees
1. Bello, Jona L.
2. De Real, Al Sr.
3. Drio, Nichon L.
4. Francisco,
Jacqueline A.
5. Manlapas,
Melode
Venue
Training Trainee Facilities/ (Workstat Date & Remarks
Activity Tools and ion/Area) Time
Equipment
SESSION PROPER
Incandescent
Activity no 3 1. Delacruz, bulb, 10:45- The trainees
Demonstra Cherry A Carton/chick Practical 11:45 am observed the
tion of 2. Delacruz, guard Work Area (1 hour) demonstration
trainer Florencio D. waterer, on Prepare a
3. De Real, feeder, Brooder
Alhem D. thermometer
4. Evangelista, ,
Rey L. stapler,
5. Ichon, Anthony ppe
E. Clipper stick
Old News
paper
Feeds
Electrolytes
LUNCH BREAK
Venue
Training Trainee Facilities/ (Workstat Date & Remarks
Activity Tools and ion/Area) Time
Equipment
1. Inopia, Lourdes Job Sheet The trainee do
Activity no 4 E. 2.2-2 1:00- the Job Sheet
Prepare a 2. Mingoy, Performance Practical 3:00pm 2.2-2 and
brooder Emmanuel B. Criteria Work Area (2 hours) Performance
3. Montilla, Mike Checklist Criteria
M. Incandescent Checklist
4. Real, Marlene bulb,
L. Carton/chick Trainees
5. Sabater, Joel guard prepare
G. waterer, brooder with
feeder, the use of
thermometer brooding tools
, and materials.
stapler,
ppe They did their
Clipper stick task
Old News satisfactorily
paper
Feeds
Electrolytes
Venue
Training Trainee Facilities/ (Workstat Date & Remarks
Activity Tools and ion/Area) Time
Equipment
Activity no 5 1. Barrun, Edalyn Written test Institutional August 10, The trainees
Institutional C. Oral Assessment 2017 undergo
Assessment 2. Basco, Julie N. questioning Area institutional
3. Campo, Demonstrati 1:00-3:00 evaluation on
Gonzalo P. on pm Brood and
4. Danao, April (2 hours) Grow Chicks
Lyn D
5. Delacruz, Amy They are now
E. ready to
proceed to the
next unit of
competencies
which is the
Trim Beak.
Their progress
is reflected in
the progress
chart.
Activity no 6 1. Delacruz, Written Contextual 3:00-4:00 The trainees
Session Cherry A Sheet Learning pm were evaluated
Evaluation 2. Delacruz, Job Sheet Area (1 hour) during the
Florencio D. Oral session, they
3. De Real, questioning participated
Alhem D. actively.
4. Evangelista,
Rey L.
5. Ichon, Anthony
E.