CT Test

Uploaded by

amr.youssif2030
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views5 pages

CT Test

Uploaded by

amr.youssif2030
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Description: CURRENT TRANSFORMER (OHTL) Record No.

:
Bay no.: Drawing ref.: Sheet: 1 of 5
Contractor: Contract no.: Substation No :

1. GENERAL DATA AND INFORMATION:

Project: PPG-HVPT
Substation: PPG-RAFIDIYA
Client: ENI-ZFOD
Bay:
Testing Device: Omicron CPC 100
Testing date:

2. CT DATA:

Serial no:
Tag no.:
Phase.:
Ratio.: 400/1 A
Rating.: 132Kv
Manufacturer.: TRENCH
Class: 30VA, 5P20 / 30VA, 5P20 / 5VA, 0.2FS5

3. MECHANICAL CHECKS & VISUAL INSPECTION:

Item Description Checked


1 Check no damage on installed equipment
2 Check grounding cable are connected as per drawing
3 Check tightness for links
4 Check ferrules as per the wiring connections
5 Check CT name plate data for correctness
6 Oil level
7 Oil leakage

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Description: CURRENT TRANSFORMER (OHTL) Record No.:
Bay no.: Drawing ref.: Sheet: 2 of 5
Contractor: Contract no.: Substation No :

4. ELECTRICAL TEST

4.1.INSULATION RESISTANCE TEST:

Phase Insulation resistance (MΩ) Remarks


Primary - earth
Primary - secondary
Secondary - earth

Applying voltages:
 Primary To Ground : 5 KV for 1 minute
 Primary To Secondary : 2.5 KV for 1 minute
 Secondary To Ground : 1KV for 1 minute

Criteria:
 Primary to ground & primary to secondary = More than 1 G.Ω
 Secondary to ground = More than 100 M.Ω

4.2.WINDING RESISTANCE:

Ambient temp: o
C

Winding Resistance
Phase
Core 1
Core 2
Core 3

Criteria:

4.3.POLARITY TEST:
Primary injection at P1 +Ve and P2 -Ve

Phase Terminals Assessment

Core 1 1S1-1S2
Core 2 2S1-2S2
Core 3 3S1-3S2
5.

5.1.RATIO TEST:

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Description: CURRENT TRANSFORMER (OHTL) Record No.:
Bay no.: Drawing ref.: Sheet: 3 of 5
Contractor: Contract no.: Substation No :

Core Primary current (A) Secondary current (A) Expected current % error
1S1-1S2 400 A 1A
2S1-2S2 400 A 1A
3S1-3S2 400 A 1A

Criteria:

6. MAG - CURVE:
5.1 Core 1

Function: Location CT#


Make: Phase Ratio
V kp: SL # Class
I mag SL #
Earthed SL #

Ter.
Sl.# V I mA
1
2
3
V volts

4
5
6
7
8
Vkp I mA

Criteria:

5. MAG - CURVE:
5.2 Core 2

Locatio
Function: CT#
n

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Description: CURRENT TRANSFORMER (OHTL) Record No.:
Bay no.: Drawing ref.: Sheet: 4 of 5
Contractor: Contract no.: Substation No :

Make: Phase 2S1-2S2 Ratio


V kp: SL # Class
I mag SL #
Earthed SL #

Ter.
Sl.# V I mA
1
2
3
V volts

4
5
6
7
8
Vkp I mA

Criteria:

5.MAG - CURVE:
5.3 Core 3

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


Description: CURRENT TRANSFORMER (OHTL) Record No.:
Bay no.: Drawing ref.: Sheet: 5 of 5
Contractor: Contract no.: Substation No :

Function: Location CT#


Make: Phase 3S1-3S2 Ratio
V kp: SL # Class
I mag SL #
Earthed SL #

Ter.
Sl.# V I mA
1
2
3
V volts

4
5
6
7
8
Vkp I mA

Criteria:

6.BURDEN TEST:

CORE TERMINALS EXPECTED ACTUAL ASSESMENT


BURDEN BURDEN

1S1-1S2
1

2S1-2S2
2
3S1-3S2
3

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: