Index

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TABLE OF CONTENTS

1. EXCECUTIVE SUMMARY 6
1.1 SYSTEM MODELING DATA 7
2. SHORT CIRCUIT ANALYSIS 8
3. SCOPE OF WORK 11
4. RELAY CO‐ORDINATION INTRODUCTION 12
4.1 RELAY CO‐ORDINATION PROCEDURE 13
4.2 PRINCIPLE OF TIME / CURRENT GRADING 14
4.3 BASIC GUIDE LINES FOR GRADING 15
4.4 RELAY CO‐ORDINATION STUDY RESULT 16
5. OBSERVATIONS AND RECOMMENDATION 17
6. PROTECTIVE RELAY SETTINGS SUMMARY 19
6.1 30MVA TRAFO 66kV INCOMER RELAY SETTINGS 20
6.2 33kV P120 SWITCHBOARD RELAY SETTINGS 24
6.3 33KV 850TPD SWITCHBOARD RELAY SETTINGS 37
6.4 33KV H2O2 SWITCHBOARD RELAY SETTINGS 57
6.5 30MVA TRAFO 11kV SWITCHBOARD RELAY SETTINGS 90
6.6 11KV 850 TPD SWITCHBOARD RELAY SETTINGS 93
6.7 11KV H2O2 ICOG PANEL RELAY SETTINGS 100
6.8 12.5 MVA TRAFO 6.6kV SWITCHBOARD RELAY SETTINGS 104
6.9 0.415KV EPCC RELAY SETTINGS 148
6.10 0.415KV ECH PCC RELAY SETTINGS 151
6.11 0.415KV H2O2 PCC RELAY SETTINGS 160
7. PROTECTIVE RELEASE SETTINGS SUMMARY 165
7.1 0.415kV ECH PCC RELEASE SETTINGS 166
7.2 0.415kV H2O2 PCC RELEASE SETTINGS 171
7.3 0.415kV EPCC RELEASE SETTINGS 174
8. ETAP GENERATED SINGLE LINE DIAGRAM 177
8.1 ETAP GENERATED 3‐PHASE FAULT SINGLE LINE DIAGRAM 179
8.2 ETAP GENERATED LINE TO GROUND SINGLE LINE DIAGRAM 181
9. ETAP GENERATED GRAPHS 183
9.1 P120 GT INCOMER TO 12.5MVA TRANSFORMER BRANCH 184
9.2 ECH TR TO COMMON UTILITY BRANCH 187
9.3 H2O2 TR TO MLDB BRANCH 190
9.4 12.5MVA TRANSFORMER TO 1250KW MOTOR BRANCH 193
9.5 11KV H2O2 ICOG PANEL TO EVFD BRANCH 196
9.6 30MVA TRANSFORMER INCOMER TO 11KV H2O2 ICOG BRANCH 199

You might also like