0% found this document useful (0 votes)
29 views29 pages

Application Letter Edo2023-Compressed

Uploaded by

rian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views29 pages

Application Letter Edo2023-Compressed

Uploaded by

rian
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 29

MarianusEdo

HP : 085269914670
Email [email protected]

CURRICULUM VITAE

I. PERSONALITY

Name : Marianus Yohanes Edo


Place/ date of birth : Ende, 03 July 1987
Gender : Male
Religion : Catholik
Marital State : Single
Citizen : Indonesian
Addres : Bambu Kuning C37 No.16, Batu Aji, Batam
Phone Number : 085269914670
Email : [email protected]

II. FORMAL EDUCATION

 Elementary school in SDK Wolofeo, Graduated in 1999


 Junior high school in SLTPK Detusoko Graduated in 2002
 Senior high School in SMUK ST. PETER EndeGraduated in 2005
 Manajement in University of University Crhistiany Artha Wacana-Kupang Graduated in
2012
 Welding Inspector in Offshore Technology Institute- Batam
 ASNT MT/PT LEVEL II
MarianusEdo
HP : 085269914670
Email [email protected]

III. JOB EXPERIENCE

Reason Of
No Company Name Position Project/Location Project Periode
Leaving

PT. RIAU ANDALAN


PT. TIMAS SUPLINDO PULP AND PAPER JAN 4st 2023 –
1 QC INSPECTOR Board Machine#1 Job Completed
ENGINEERING PANGKALAN KERINCI- 22 DEC 2023
RIAU

Eni Mexico Area 1


Development Project

Shaporji Palonji NOV 01st 2020-


PT. ANECAN PT. ANECAN PRATAMA
2 QC INSPCTOR JAYA
Marine/Top Side AUGST 31th Job Completed
PRATAMA JAYA
KABIL 2022
Liza Prosperity Top side

GIMMI FLNG PIPERACK

PT. GRAHA TRISAKTI OCT 10st 2019-


PT. SUMBARTEC JAYA NG08039 / 5,000
3 QC INSPECTOR INDUSTRI /PAXOCEAN Job Completed
LEVINDO HP VSP TUG APR 09st 2020
BATAM

PT. DAYA RADAR NOV 23nd 2018-


PT. HARAPAN UTAMA
4 QC INSPECTOR UTAMA LST AT-7 H395 Finish Contract
INDONESIA APR 1st 2020
UNIT LAMPUNG

5 POWER PLANT 2 X JUN 20nd 2017-


WI & WELDING PT HEPSEC
PT. HEPSEC 100MW CFSPP Job Completed
SPV PALANGKARAYA
PROJECT AUG 10st 2018

PT. SIEMENS BATU E- HOUSE YAMAL JUN 01st 2016-


6 PT. CHERES QC INSPECTOR Finish Contract
AMPAR BATAM LNG ESS-301 SEP 29th 2016

PT. INDIAN OIL


TANK STORAGE FEB 26th2016-
7 PT. SINAR CENDANA QC TANKING TANJUNG Finish Contract
TERMINAL MAY 17nd 2016
BALAI KARIMUN

JACK- UP DRILLING
PT. GRAHA TRISAKA
UNIT MSC CJ46- NOV 1st 2014-
8 PT. SINAR CENDANA QC INDUSTRI TANJUNG Finish Contract
X100-D (L 209 & G Aug 1st 2015
UNCANG BATAM
8001)

PT. ASL SHIPYARD SHIP BUILDING


PT. ASL SHIPYARD Jan 16nd 2014 –
9 QC INSPECTOR INDONESIA TANKER (1000 Job Completed
INDONESIA Oct 15nd 2014
BATAM DWT)

PT. NEXUS
Jan 23th 2013 –
10 PT. DUNIA MARINDO SAFETY ENGINEERIN-KABIL, MV. DIAMANTINA Job Completed
Nov 27th 2013
BATAM
MarianusEdo
HP : 085269914670
Email [email protected]

IV. SKILLS
 Quality Control : Inspection Before, During, and After Welding
 ASNT (MT/PT LEVEL II) : Inspection and Witness Magnetic Test and Penetrant Test
 Computer : Ms. Office

V. DUTIES & RESPONSIBILITY

 As QC in PT. Timas Suplindo Engineering – BM1 Project Location in PT. Riau


Andalan Pulp And Paper-Pangkalan Kerinci, Periode 04 JANUARY 2023 – NOW
 Perform internal fit up inspection prior to invite official inspection with client.

 Check & monitoring Welder Qualification Test perform

 Check and monitoring Welding Parameter (Voltage, Ampere, Travel Speed, & Heat

Input) refer to WPS.


 Welding Inspection, Documentation & Dimensional check as per Codes and Standards

 Perform & monitoring check out / Line check internal and official with client.

 Responsible and monitoring closing punch list

 Review and controlling AFI Report before submit to client.

o As NDT Technician
 Performed PT (LEVEL II) to ASNT-TC-1A Standards

 Performed Non-destructive-test to access quality condition and/or identify defect for

piping system.
 Prepare report outlining findings and conclusions

 Completed paper work as per client standars.

 As QC in PT. Anecan Paratama Jaya - Kabil Project Location in PT. Anecan Pratama
jaya Periode 01 NOVEMBER 2020 – 31 AUGUST 2022
 Ensure the job areas and surroundings are safe and ensure all employs working with

Safety and aware about Safety Regulation.


 Material grade and heat number are verified and transfers on to the components.

 Oriental and slope is maintained as per isometric drawing.

 Perform internal Fit up inspection prior to invite official inspection with client.
MarianusEdo
HP : 085269914670
Email [email protected]

 Ensure all the specification, procedure, Quality plan, Welder register and all related

document approve by all parties.


 Prepare quality records and final acceptance document where required.

 Ensure welding activity and check welding parameter during welding according WPS.

 Perform internal visual inspection prior to invite official inspection with client.

 As QC in PT. Sumbartec Jaya Levindo Project Location in PT. Drydocks Graha


Trisaka Industri-PaxOcean Periode 10 OCTOBER 2019 – 10 APRIL 2020
 Preparing Form Request For Inspection

 Able to reading drawing 3D for make it Request Inspection

 Make a summary RFI report

 Welding Inspection (Before, During and After Welding)

 Submit RFI to QC yard before Inspection

 Receivable new drawing and Revision drawing

 Responsible to controlling all of QC file

 As QC in PT. PT. Harapan Utama Indonesia Project Location in PT. Daya Radar
Utama Unit Lampung(DRU) Periode 23 NOVEMBER 2018 – 10 JUNY 2019
 Kick off Meeting, Weekly Meeting, and Monthly Meeting on Start Construction.

 Fabrication / Erection Structure/Piping , Documents and Work Quality in terms of

specification, workmanship and other variables as per Requirements of QC standard


operating procedure and Client’s specification.
 Surveillance check and Visual inspection of all welding Structure/ Piping work at pre-

fabrication.
 Verify/ Review Welding Parameters of FCAW, SMAW & GTAW process to be within

ranges specified in approved WPS during the shift on daily basis in maintain the record
for materials.
 Welding Inspection, Documentation & Dimensional check as per Codes and Standards.

 Ensuring workshop personnel are working to the correct procedure.

 Inspection of all welding activities Prior, During and After, which include Material

Check, Qualification and Welding Equipment (Randomly)


 Witness NDT test UT,MT,PT, Monitoring and review of preheat/ postheat & PWHT
MarianusEdo
HP : 085269914670
Email [email protected]

 Ensuring that all Welding Inspection and NDT activities affecting the quality of welds

contained in each items have been completed and accepted.


 Review all NDT reports and evaluator certification validity and required level, records

drawings, material and weld traceability for proper documentation as per project
specification requirements.
 Review of documents and final documentation.

 As Welding Inspector And Welding Supervisor in PT. Hepsec Project Location in PT.
SKS LISTRIK KALIMANTAN (SKS) Periode 20 JUNI 2017 – 10 AUGUST 2018
 As Welding Inspector
 Preparing For Welder Qualification Test

 Check & monitoring Welder Qualification Test perform

 Preparing form Request Inspection

 Make Welding Mapping

 Able to reading drawing 3d for make it Request Inspection

 Inspection of all welding activities Prior, During and After, which include Material

Check, Qualification and Welding Equipment


 Check & monitor Preheat/ Interpass Temperature refer to WPS.

 Responsible to controling all of QC File

 As Welding Supervisor
 Arranged Welder team

 Prepare Welder and Tools for Welding process

 Check & verify personnel are working to the correct procedure.

 Responsible for all of welding progress

 Make Permit To Work

 As QC in PT. Cheres Gemilang Indonesia Project Location in PT. Siemens Periode


01 JUNY 2016 –29 SEPTEMBER 2016
 Fabrication/Erection Structure, Document and Work Quality in terms of specification,

workmanship and other variables as per requirements Qc Standard Operating Procedure


and Client specification.
 Welding Inspection (Before, During and After Welding)
MarianusEdo
HP : 085269914670
Email [email protected]

 Review and understanding ITP, Project Specification , Project Quality Plans, WPS,

Welder Qualification Record and other related documents that support for
fabrication/inspection
 Perform and check Fit up Inspection (root, gap, missaligment etc).

 Check Calibration Welding Machine, Digital Temperature, etc.

 Check & verify Preheat Temperature refer to WPS.

 Check & monitor Interpass Temperature refer to WPS.

 Check and monitoring Welding Parameter (Voltage, Ampere, Travel Speed, & Heat

Input) refer to WPS.


 Check & monitoring Welding activities such as cleaning, grinding, etc.

 Conduct Visual Inspection

 Submit CIR to NDT Technician to perform NDT as requested.

 If Final Inspection was done by Client, prepare all related document (NDT Request,

Inspection Release Note, Punch List, Material and Welding Traceability) to submit to
client for reviewed.

 As QC in PT. Sinar Cendana Project Location in PT. Indian Oil Tanking Periode 26
FEBRUARY 2016 – 17 MAY 2016
 Monitoring weld joint preparation refer to WPS.

 Preparing Form Request For Inspection

 Perform Fit up and Visual Inspection prior to invite official inspection with client.

 Perform & witness line check refer to drawing.

 Perform & witness pressure test.

 Able to reading drawing 3D for make it Request Inspection.

 Make a summary RFI report.

 Submit RFI to QC yard & Client’s before Inspection.

 As QC in PT. Sinar Cendana Project Location in PT. Drydocks Graha Trisaka


Industri-PaxOcean Periode11 NOVEMBER 2014 – 10 AUGUST 2015
 Preparing Form Request For Inspection

 Able to reading drawing 3D for make it Request Inspection

 Make a summary RFI report

 Witness NDT test UT,MT, Monitoring and review of preheat/ postheat & PWHT
MarianusEdo
HP : 085269914670
Email [email protected]

 Perform internal Fit up inspection prior to invite official inspection with client.

 Check & verify Preheat Temperature refer to WPS.

 Check & monitor Interpass Temperature refer to WPS.

 Perform internal Visual inspection prior to invite official inspection with client.

 Perform & witness Line check as to drawing requirements.

 Check & witness pressure test internal before official with client.

 Submit RFI to QC yard & Client’s before Official Inspection.

 Perform, check & verify document before reinstatement all system.

 Receivable new drawing and Revision drawing.

 Responsible to controlling all of QC file.

 As QC in PT. ASL SHIPYARD INDONESIA Project Location in PT. ASL


SHIPYARD INDONESIA Periode16 January 2014 – 15 October 2014
 Preparing Form Request For Inspection

 Able to reading drawing 3D for make it Request Inspection

 Make a summary RFI report

 Welding Inspection (Before, During and After Welding)

 Receivable new drawing and Revision drawing

 Responsible to controlling all of QC file

 As SAFETY in PT. Dunia Marindo Project Location in PT. Nexus Engineering- Kabil
Periode 23 JANUARY 2013 – 27 NOVEMBER 2014
 Make Permit To Work (PTW) for Hot Work and Confined Space

 Check & Monitoring Safety Working (Hot Work &Confined Space)


MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]
MarianusEdo
HP : 085269914670
Email [email protected]

You might also like