Application Letter Edo2023-Compressed
Application Letter Edo2023-Compressed
HP : 085269914670
Email [email protected]
CURRICULUM VITAE
I. PERSONALITY
Reason Of
No Company Name Position Project/Location Project Periode
Leaving
JACK- UP DRILLING
PT. GRAHA TRISAKA
UNIT MSC CJ46- NOV 1st 2014-
8 PT. SINAR CENDANA QC INDUSTRI TANJUNG Finish Contract
X100-D (L 209 & G Aug 1st 2015
UNCANG BATAM
8001)
PT. NEXUS
Jan 23th 2013 –
10 PT. DUNIA MARINDO SAFETY ENGINEERIN-KABIL, MV. DIAMANTINA Job Completed
Nov 27th 2013
BATAM
MarianusEdo
HP : 085269914670
Email [email protected]
IV. SKILLS
Quality Control : Inspection Before, During, and After Welding
ASNT (MT/PT LEVEL II) : Inspection and Witness Magnetic Test and Penetrant Test
Computer : Ms. Office
Check and monitoring Welding Parameter (Voltage, Ampere, Travel Speed, & Heat
Perform & monitoring check out / Line check internal and official with client.
o As NDT Technician
Performed PT (LEVEL II) to ASNT-TC-1A Standards
piping system.
Prepare report outlining findings and conclusions
As QC in PT. Anecan Paratama Jaya - Kabil Project Location in PT. Anecan Pratama
jaya Periode 01 NOVEMBER 2020 – 31 AUGUST 2022
Ensure the job areas and surroundings are safe and ensure all employs working with
Perform internal Fit up inspection prior to invite official inspection with client.
MarianusEdo
HP : 085269914670
Email [email protected]
Ensure all the specification, procedure, Quality plan, Welder register and all related
Ensure welding activity and check welding parameter during welding according WPS.
Perform internal visual inspection prior to invite official inspection with client.
As QC in PT. PT. Harapan Utama Indonesia Project Location in PT. Daya Radar
Utama Unit Lampung(DRU) Periode 23 NOVEMBER 2018 – 10 JUNY 2019
Kick off Meeting, Weekly Meeting, and Monthly Meeting on Start Construction.
fabrication.
Verify/ Review Welding Parameters of FCAW, SMAW & GTAW process to be within
ranges specified in approved WPS during the shift on daily basis in maintain the record
for materials.
Welding Inspection, Documentation & Dimensional check as per Codes and Standards.
Inspection of all welding activities Prior, During and After, which include Material
Ensuring that all Welding Inspection and NDT activities affecting the quality of welds
drawings, material and weld traceability for proper documentation as per project
specification requirements.
Review of documents and final documentation.
As Welding Inspector And Welding Supervisor in PT. Hepsec Project Location in PT.
SKS LISTRIK KALIMANTAN (SKS) Periode 20 JUNI 2017 – 10 AUGUST 2018
As Welding Inspector
Preparing For Welder Qualification Test
Inspection of all welding activities Prior, During and After, which include Material
As Welding Supervisor
Arranged Welder team
Review and understanding ITP, Project Specification , Project Quality Plans, WPS,
Welder Qualification Record and other related documents that support for
fabrication/inspection
Perform and check Fit up Inspection (root, gap, missaligment etc).
Check and monitoring Welding Parameter (Voltage, Ampere, Travel Speed, & Heat
If Final Inspection was done by Client, prepare all related document (NDT Request,
Inspection Release Note, Punch List, Material and Welding Traceability) to submit to
client for reviewed.
As QC in PT. Sinar Cendana Project Location in PT. Indian Oil Tanking Periode 26
FEBRUARY 2016 – 17 MAY 2016
Monitoring weld joint preparation refer to WPS.
Perform Fit up and Visual Inspection prior to invite official inspection with client.
Witness NDT test UT,MT, Monitoring and review of preheat/ postheat & PWHT
MarianusEdo
HP : 085269914670
Email [email protected]
Perform internal Fit up inspection prior to invite official inspection with client.
Perform internal Visual inspection prior to invite official inspection with client.
Check & witness pressure test internal before official with client.
As SAFETY in PT. Dunia Marindo Project Location in PT. Nexus Engineering- Kabil
Periode 23 JANUARY 2013 – 27 NOVEMBER 2014
Make Permit To Work (PTW) for Hot Work and Confined Space