33 Kva Diversion
33 Kva Diversion
33 Kva Diversion
BWall BWall
BWall BWall
BWall BWall
BWall
BWall
BWall BWall
BWall BWall
BWall
BWall BWall
BWall
BWall
BWall
ME
BWall BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall
THIS DRAWING IS THE PROPERTY OF BWall BWall BWall BWall BWall BWall BWall BWall
D
BWall BWall
BWall
BWall
BWall BWall
BWall
SH SH ICA
AK
BWall
DELHI METRO RAIL CORPORATION LTD.
BWall
UN OP L
M DR TA
O
BWall
LA
BWall
IC S TIL . M
BWall
BA IC INGH AL
BWall
NK I
BWall
BWall
C
BWall
CLIENT :
SC HI
BWall
HO LD
ENGR./CPM
गगगगगग
OL
J.E. (DESIGN)
BWall
BWall
CE. (DESIGN)
AD N
BWall
BWall
LEGEND:-
V.
DY.CE. (DESIGN)
M ALA
PROJECT MNGR.
V
A.M (DESIGN)/XEN
ED N
BWall
BWall
KU IRE
DESIGNATION
IC DA
BWall
M ND
BWall
AR R AL
GEOLOGICAL
A
BWall
SURVEY OF INDIA
BWall
DR
.A
K
KR HIL
BWall
IS ES
PR
HO HN H
SP A C SHA
BWall
IT IT RM
BU IV
AL Y A
BWall
BWall
IL ATE
DI
BWall
BWall
NG
BWall
BWall
BWall BWall BWall
BWall BWall
BWall
BWall BWall
Reviewed
Reviewed
Reviewed
BWall
BWall
3.8
SHOPS
BWall
BWall BWall
BWall BWall
CONNECTION CHAMBER
BWall BWall
BWall
BWall
RAJENDRA NAGAR
BWall
SA
BWall
BWall
BWall BWall
BWall
BWall
T P
BWall
BWall
BWall
BWall
BWall BWall
BWall
BWall
BWall
BWall
BWall
H H
BWall
BWall BWall
BWall
BWall
FOR ADJACENT
BWall BWall
BWall
टिप्पणियाँ
BWall
ACCESS ROUTE
BWall
BU RIV
BWall
NT RT DI E
BWall
BWall
ER NG
BWall
BWall
BU CO
BWall
BWall
UMA MEDICAL
IL MM
BWall
BWall
BWall
Re DIN ER
BWall
BWall
BWall
il S (M A 4.5 DR
BWall
O SU .B
BWall
ho ult L BU RIV
BWall
CO RT RY .K S
BWall
ps iple SM HO AN ING
)
BWall
BWall
ET DO CH H
DI E
BORED TUNNEL
BWall
CL IC NT AL NG
BWall
IN DE IC
IC N &
BWall
P TA
L
BWall
BWall
T JA
BWall
BWall
BA ION B KU Dr P
C
BWall
BWall
CL OF TRACK
NK AL LI MA AN
L OF TRACK
BWall
NE R KA
BWall
BWall
BWall
CL , LI J
BWall
IN FE
BWall
IC
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
IL BWall
BWall
BWall
DATE
TI EG BA
BWall
BWall
N AL
& N
OPS
CUTOUT
800mm D-WALL
BWall
CUT & COVER
BWall
PL TE BA DH
BWall
AS MP
BWall
TEMPORARY
G+ NK AN
TI OR 2
G+0
6.9 C
BWall
BWall
SH AR
BWall
BWall
BWall
BWall
BUILDING
DAMAGED
BWall
BWall
BWall
BWall
ED Y
BWall
BWall
BWall
4
BWall
OP
BWall
EN
"Notice of No Objections"from Employer is being accorded for design principles.However the overall responsibility for the detailing
TEMPORARY SH
BWall
BWall
PL
BWall
SIGNATURE
BWall
OT
BWall
IL IL
L
BWall
BWall
L
BWall
TI EG
BWall
TI EG
BWall
N A
BWall
N AL
& & LT
BWall
BWall
BWall
PL TE PL E
BWall
BWall
AS MP
BWall
AS MP
BWall
TI OR
BWall
7.1 TI OR C
BWall
C
BWall
VERIFIED
BWall
SH AR
CHECKED
BWall
SH AR
ED Y
BWall
BWall
ED Y
BWall
BWall BWall
BWall BWall
BWall
4 m WIDTH ROAD
BWall
BWall BWall
BWall BWall BWall
BWall
PROOF CHECKER :
CL OF TRACK
CL OF TRACK
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
NAME
ROAD WITH EXTENSION
BWall
BWall
KA
M
BWall
BWall
ED NA
BWall
BWall
IC K
C & C TUNNEL
AL
NU
START OF CNC
BWall
VI TA
HA N M
AN
R
CO SU NA END OF UG RAMP
M IT
PL
BWall
EX
SIGNATURE
PROOF CHECKERS'/CERTIFICATE
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWa
BWall
ll
BWall
UG RAMP
BWall
BWall
DATE
M
BWall
E
800mm D-WALL
800mm D-WALL
BWall
300mm RC WALL
BWall
BWall
4 m WIDTH ROAD
HO DIV
3.2
BWall
BWall
SP ER
BWall
IN
BWall
G+ ITA SAL
D 5 L
BWall
BWall
PE IAN
BWall
BWall
BWall
PU TRO OIL
BWall
BWall
M L
BWall
VERIFIED
P
CHECKED
BWall
BWall
BWall
BWall
BWall
BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall
BWall
SH
BWall
OP
AUTHOR
ZIED
S
G
THIRD PARTY CHECKER
BWall
NAME
BWall
INATORY
33
LIN
CL OF TRACK
CL OF TRACK
BWall
E
Kva
BWall
BWall
ELE
PCC ROAD NA AB P
BWall
TRI
BWall
PR G DR H BU RIV
BWall
CA
PR B I HO IN
BWall
V PR ER
L
BU IV UI A IL AT
BWall
AS ND SP AND
BWall
IL AT LD TE DI E
AD RA IT A NG
BWall
DI E IN
BWall
G AL N
SIGNATURE
NG
BWall
BWall
W:www.ecospaceinfra.com
BWall
BWall
TE .DIW
P
Mob. No : + 91-99992-83368
OR ATN S DR
. J A
E:[email protected]
C & C BOX UG RAMP
DATE
IC DI E
NG
BWall
BWall
BWall
AM D
3.1
BE R.
SH DKA
OP R
CH DR
BWall BWall BWall BWall BWall
BWall BWall BWall BWall
BWall BWall BWall BWall
BWall
AU .R
DRAWN
DH .P
PCC ROAD
VERIFIED
AR
CHECKED
Y
DESIGNED
BWall BWall BWall BWall BWall BWall BWall BWall BWall
CONTRACTOR :
BWall
CO
M IM STA
(M BU ME
BWall
ult IL RC AG R
Sh G L
DI SC PPL CO SAM op CE NO
M S s)
AG A E B PR M U NT ST
UN NG ER IC
CE NO N & UI IVA IC SH
AT IV
LD TE IO
NT ST NS M
BWall
IN
PP
ER IC G DR BH EE
VM
BWall
.B AV RA
AKD
VAD
PR IRE AN
BWall
NAME
AS ND
Chennai - 600089
AD RA
EN BE MIN
T A& H D
BWall
DR
M (M ERP M .R CL AV & R.
R.
IG BR
BWall
4 m WIDTH ROAD
E DR
CUT & COVER
IN IOR
IC .R SP AIN
A
-1 IG-1 RIS EN
PC- 03
BWall
BWall
NJ
600mm RC WALL
BWall
BWall
AN
BWall
BWall
BWall
BWall
BWall
BWall
BWall
BWall
UG RAMP
BWall
BWall
BWall
BWall
BWall
BWall
BWall
Ch: 8135.954 (UP)
Ch: 8108.881 (DN)
END OF UG RAMP.START OF
BWall BWall
BWall
BWall
BWall BWall
BWall
BWall
BWall BWall
PCC ROAD BWall BWall
BWall
ELEV. RAMP CH:8098.84
BWall
L&T CONSTRUCTION
BWall BWall BWall
P
BWall
SIGNATURE
S.
N D
BWall
DI SPE BU RIV
DR GO C M R. IL AT
IS
BWall
.R NI TR
M LA U HR DI E
33 Kva DIVERTED LINE VIA HDD
PC- 01
K IG BO AS SIT M A NG
BWall
SI P -1 RA IA IC &
UL
T BU RIV
BWall
HO ISP IL AT
SA
ELEV. RAMP
SP EC
BWall
P SH AH
OP I
IT IAL
DI E
NG
AL IT
BWall
BU RIV Y
Contract Boundary
IL AT G M
BWall
DATE
DI E GA .P R SA ATH
W E-
BWall
NG RH AJ
BWall
AR
09-09-2023
IA I SH
E
BWall
BWall
KA
&
BWall
use either in full or in part by such person or body without our prior permission in writing {MD.H.}
RE R E
BWall
HO UM
BWall
not be passed on to any person or body not authorized by us to receive it nor be copied or otherwise made
This drawing is the property of L&T CONSTRUCTION-HEAVY CIVIL INFRASTRUCTURE, EDRC and must
CE SE NT
यह ड्राइंग एलएंडटी कंस्ट्रक्शन हेवी सिविल इंफ्रास्ट्रक्चर ईडीआरसी की संपत्ति है और इसे किसी ऐसे व्यक्ति या निकाय को नहीं दिया जाना चाहिए जो इसे
BWall
NT AR CLI
SP A
प्राप्त करने के लिए हमारे द्वारा अधिकृत नहीं है और न ही ऐसे व्यक्ति या निकाय द्वारा पूर्ण या आंशिक रूपप से कॉपी या अन्यथा उपयोग किया जाता है, लिखित
BWall
BWall
ER CH NIC IT
BWall
0
VI
REV.
CE JA
NT & I H P
T O
BWall
33 KVA UG CABLE DIVERSION PLAN
VI ER RA SP BU RIV
JA /D U IT IL AT
BWall
I S R. MA AL DI E
SI HA (CA
BWall
NG N PT NG
H. KA AI
BWall
R N)
BU
IL PR P
BWall
DI IV
BWall
BU RIV
TU NG AT
/ E IL AT
BWall
TO KU DI E
NG
BWall
RI NW
PRELIMINARY DRAWING Al AR
DR P
DESCRIPTION . BU RIV
BWall
SI RA IL AT
BWall
NG N DI E
NG
H U
33 Kva DIVERTED LINE VIA HDD
BWall BWall
D BWall BWall BWall BWall BWall BWall BWall BWall BWall BWall BWall
D rR
BWall
RE ENT AM
BWall
SE AL JI AR
P
BWall
S
DR CH
BWall
AR CL PR
. R AN BU RIV
CH IN AS NEU AMA AS
I A
BWall
RO R
DR HIR A A IL AT
V
CE C A D CA TH DI E
BWall
RE SI . IN AD TI M K NIK NG
NT ND NG DU W E
H
DATE
09-09-2023
RE AR SH UN
M I AV J
SH
SH ED
OP AM
BWall
ED
VM
TI ATH
P P
DRN.
HI D PR CA
M R B RIV
A . U BU IV L OP BU RIV
RO NS IL AT IL AT M EN IL AT
H
PP
DI E DI E 1 IG PL DI E
Y U NG NG 96 OT NG
DGN.
IC
SHED
B A IC
I
AT NK
M
BWall BWall BWall BWall BWall BWall BWall BWall BWall P
BH BU RIV
D A
VAD
CHD.
IL AT
SH R. VYA DI E
SHED
BWall
NG
BWall BWall
BWall
SB
AR CS
BWall
BWall
IA M
BWall
TM A
BWall BWall
BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall
BWall BWall BWall
AKD
AD
BWall
OP
V.
BWall
EN
KU MU V
BWall
SI .B PL
BWall
BWall
M KE BWall
BWall
BWall BWall
BWall
NG .
BWall
BWall
OT
BWall
AR S H
H
BWall
BWall
BWall
BWall
GE MID
M N P P
TITLE :
KA DR IG
NIG P
PROJECT:
09
STRUCTURAL:-
TI E
BWall
BWall
P P
H
BWall
BU RIV BU RIV
BWall BWall
BWall BWall BWall BWall BWall BWall
EY AR P IL AT IL AT
DI E
E IHA B RIV
BWall
CA R UI A DI E NG
NG
BWall
RE LD TE
IN
BWall
G
BWall BWall BWall BWall BWall BWall
BWall
CO R G
M APH
DU
BWall BWall
M BWall BWall
BWall BWall
BWall
RA M PUT TE
BWall BWall
BWall BWall
BWall BWall
ED RG IS E C BWall
IC A BWall
BWall
JA
BWall
D NI RA AL TO R H BWall
BWall
BWall
BWall
TOWARDS
W M
BU CO JAWE RE AN
KU R. AS AN IL M SALOD HAB D
M MU
B
DI M ON EE DOCTORS
AR K N E
BWall BWall
SH G & RCI
BWall BWall
SI ESH
BWall BWall
BWall BWall
BWall BWall
NG OP R AL
H S TAE COLONY
IL
P
DI F
A I BU RIV P
स्टेशन
BU CO IL AT
STATION
IL M M GN NAL BU RIV
NA RA P DI M ED O DI E IL AT
RD TN BU RIV N E I M SIS NG DI E
EN ES IL AT SH G & RCI AL & NG
SI H DI E
NG
O P R AL
S ETA L
NG M IL ER
H SO M IG-2 NCC PIL
BWall BWall
BWall BWall
O AA 20 R
M P
ED YA NO.-1
IC VA
AL NI BU RIV
BWall BWall BWall BWall BWall
BWall BWall BWall BWall BWall BWall BWall BWall
IL AT
BWall
BWall BWall
DI E
BWall
O21547-Q-UM-CM-GA-XXXX
NG
33 Kva UG ELECTRICAL
CABLE DIVERSION PLAN
PR
I
New ISBT to Patna Station of corridor-2 of Phase-I of Patna MRTS.
&D VAT IN D
BWall BWall BWall BWall BWall
BWall BWall
R. E
BWall H B HI ELH
SH KU IMA UIL BA DIA GH I
ED M
M NS DIN
AR H G
SHED NK N SC OD
U HO EL
BU C O
IL M
PATNA METRO CONTRACT NO: PC-03
M DIN M
E
OL
S G RC
H HO & IA
PL AM NA RA
AN AR PS RET L
R AN DW
BWall
AY MA AIL
BU U
D A
YA AY J PA RE IL C
SC 'S L RL &
BWall
DA AN OR
SH
DI
HO AP V M AN
ED K
BWall
NG
IC AR
MALAHI PAKRI
OL AL
BWall
BU CO
REV.
IL M
STATUS
DI M CO
NA CO N E SHED M CH
M
Stadium, University, PMCH, Gandhi Maidan & Akashvani with Entry/Exits & Connecting
G+ ING L
Design and Construction of Twin Tunnel by Shield TBM, Tunnel by Cut & Cover, Underground
SP DA IL RC
3
BWall
IT S ER TA BA
G+ RE
G+ ITAL DI
M CH AH
SI NA
ME JRAN
G+ ING
O 4
D G
-
UT IC A IL
BWall
5 UT NG IAL
0
T KE T HA ICAL
DE T
N LL
BWall
E ON
G+0
subway including Architectural Finishing, Water Supply, Sanitary Installation & Drainage works on
Ramp at Rajendra Nagar and Six Underground metro stations viz. Rajendra Nagar, Moin Ul Haq
SH. NO. 1 OF 1
SH &
BUILDING
BWall
CHILDCENTRE
OP
NC H
DRAIN
ROAD BUILDING
BWall BWall
BWall BWall
BWall
EP
Y DRAIN
BWall
BWall BWall
BWall
SCALE AS SHOWN
BU CO
NEW
BHAWAN
HOTEL
IL M
DI M
Size A1
NG ER
HOTEL
& CIA
ANPOORNA
RE L
TA
IL