Task Sheet 5.1-3a
Task Sheet 5.1-3a
Task Sheet 5.1-3a
Activity
is done
3. Clean and arrange before
working tables and
Rogie Mar ✔
according to floor after
Bolon
plan/lay-out; the
check stability. session
.
Activity
4. Clean and free
is done
Mock-up board
before
from
Ryan and
dust,rust,gums, ✔
Amante after
used wires,
the
stubs,electrical
session
tape, lugs.
.
✔ Activity
is done
5. Remove dust and Yanksi before
dirt from CCTV Cajurao and
after
lens, Smoke and the
fire detectors session
.
Activity
6. Check and clean is done
wires for dust and before
grease/oil and Almel and
arrange the ✔
Hubilla after
cables/wires the
according to types session
and size .
Activity
10. Clean or replace is done
dirty floomats from before
every entrance and Lupin and
Magdalo ✔
exit of every room after
III the
session
.
Activity
12. Dispose waste is done
material by after
following waste Pepito the
✔ session
segregation Manaloto
.
system.