Ambient Temperature
Ambient Temperature
Minimum Reference Maximum
Observational Record Deg C
Design Value Outdoor Deg C 27 45
Design Value Indoor Deg C
Relative Humidity
Humidity
Minimum Reference Maximum
Observational Record %
Design Value Outdoor % 60
Design Value Indoor %
B) PROJECT LOCATION
Patratu Thermal Power station (PTPS) is located just outside the coal belt of South Karanpura in Ramgarh
District of Jharkhand State. The nearest Railway Station is Patratu which is at a distance of about 4 km on
Barkakhana-Barwadih Railway line.
The latitudes and longitudes of the site are as follows:
Airport
The nearest commercial airport is Ranchi at about 45 km by road.
ENVIRONMENTAL CONDITIONS:
4. INTENT OF SPECIFICATION
This specification covers the minimum requirements for the complete design, material, manufacturing, shop
inspection, testing at the manufacturer’s works, supervision of erection & commissioning and performance
guarantee testing of Limestone Grinding System along with accessories.
a. The FGD system will be provided with common limestone grinding system (LGS). 2 numbers of Wet
Ball Mill (1 working + 1 standby) shall be provided. This WBM system shall be located inside the Ball
Mill Building. Building is in BHEL scope. Refer Enclosed General Arrangement drawing –
Annexure-15
b. Bidder shall assume full unit responsibility for the entire equipment assembly and make all possible
efforts to comply strictly with the requirements of this specification and other
specifications/attachments to inquiry/order.
c. In case, deviations are considered essential by the Bidder (after exhausting all possible Efforts), the
same shall be separately listed in the enclosed Annexure-2.
d. No deviation or exception shall be permitted without the written approval of the purchaser.
e. Compliance to this specification shall not relieve the Bidder of the responsibility of furnishing
equipment and accessories/auxiliaries of proper design, materials and workmanship to meet the
specified start up and operating conditions.
g. All accessories, items of work, though not indicated but required to make the system complete for its
safe, efficient, reliable and trouble free operation and maintenance shall also be in supplier’s scope
unless specifically excluded.
h. Bidder are requested to carefully examine and understand the specification and seek clarification, if
required, to ensure that they have understood the specification. The bidders offer should not carry any
sections like clarifications, interpretations and/or assumptions.
5. PROVENNESS CRITERIA:
The Bidders are required to meet the Qualification Requirement (QR) for Wet Ball Mill system as per
enclosed Annexure-1 & submit the Annexure to qualification requirement (Attachment-3K). Bidder’s
offers will be rejected if they fail to meet the QR.
6. MEDIA ANALISYS
The analysis of limestone, water & instrument air used in limestone grinding system in as per enclosed
Annexure-3.
7.SCOPE OF SUPPLY (Refer Enclosed P&ID for Details — Annexure-4)
Scope for the bidders shall include Design, Engineering, Manufacture, Inspection/testing as per approved
quality plans, Packing, Supply, Supervision of Erection & Commissioning, Performance Guarantee Test and
handing over of final Customer. Refer Enclosed General Arrangement drawing – Annexure-15
Design: Includes basic engineering, detail engineering, preparation and submission of engineering
drawings/calculations/datasheets/quality assurance documents/field quality plans, storage instructions,
commissioning procedures, Erection & assembly Drawings, operation & maintenance manuals, performance
guarantee test procedures and assisting BHEL in obtaining time bound approval from NTPC.
Painting: The bidder scope of work includes supply of paints and painting of all equipment’s as per approved
painting schedule from NTPC.
Supervision of Erection & commissioning: Includes supervision of erection & commissioning, supervision
of startup and trial operation of the entire LGS system.
Performance Guarantee Test: the guarantee tests shall be carried out as per approved Performance
guarantee test procedure, all the special equipment, tools and tackles, instruments, measuring devices
required for successful conductance test shall be provided by bidder free of cost.
The scope of supply for each Limestone Grinding System (i.e., one set of LGS) shall include but not limited
to the following:
39 Mechanical seal flushing globe valve, any other valves not As per SET
covered above P&ID
40 All motors shall be provided with suitable double 1 SET
compression cable gland
Inlet chute shall have necessary provisions for loading balls into the ball mills, such as
ball charging hopper.
A discharge chute shall be provided with necessary provisions to collect and separate
balls and tramp metal.
9.2 CHUTE BLOCKAGE SWITCHES
Vendor to
Sl. Description
confirm
No
a. One no. chute blockage switch of proven type (subject to approval of the employer)
shall be provided
b. Chute blockage switch shall trip the feeding conveyor in case of Chute blockage and
protect the feeding conveyor equipment.
9.11 MOTOR
Vendor to
S. No Description
confirm
Above 0.2 kW and upto 200 kW: 3 phase 415 V AC-VENDOR SCOPE
a)
Above 200 kW and upto 1500 kW: 3.3 KV- BHEL SCOPE
Above 1500 kW: 11 KW-BHEL SCOPE
Bidder to submit the motor datasheet as per format given in the specification.
Motor shall be sourced only from NTPC approved sources and data sheet approval
shall be obtained from BHEL before placing order.
If motor is procured from any new source, acceptance shall be subject to approval
by NTPC/ BHEL before placing order and bidder shall submit relevant documents
as per sub-supplier questionnaire attached in enclosed Annexure (sub-supplier
questionnaire).
Double compression cable gland with lugs to be provided by the vendor, however,
exact size will be informed to vendor after award of contract.
9.15 INSTRUMENTS
Vendor to
S. No Description
confirm
All instruments shall be as per specification enclosed in Annexure-9. Vendor to
a)
supply all the instruments as given in the P&ID.
Integral to equipment which are not indicated in the tender drawings, but are required
for control, monitoring and operation of the equipment for which no P&ID is attached
shall be provided to meet the actual system requirements and meeting redundancy
and other technical specifications.
For binary and analog inputs required in major equipment’s of FGD system,
protection triple-sensing devices shall be provided. Binary and analog inputs, which
are required for protection of more than one equipment as well as protection signals
for HT drives etc., triple sensing devices shall be provided.
For other critical binary and analog inputs required for protection and interlock
purpose of other equipment (Eg. Those interlocks which may lead to loss if
production, non-availability of major equipment etc.,) triple sensors shall be
provided
Temperature elements, electronic transmitters etc., are to be provided for all the cases.
Use of process actuated switches is acceptable only in case indicated in tender
drawings.
9.17 Actuators
Vendor to
S. No Description
confirm
All Pneumatic and Electrical Actuators shall be in compliance with Annexure-6 and
Annexure-17 respectively.
Vendor to
S. No Description
confirm
Proper packing to be ensured.
a)
Indigenous Supply: WBM & sub system assembly shall be wrapped in polythene
bags & packed in a strong rigid wooden crate. Rain water should not enter into the
WBM internals during storage in the outer yard of power plant.
Imported Supply: All imported supply should be packed as per Sea worthy packing
standards Annexure – 10 (Specification: HY0490569). All imported items should
have Sea worthy packing. Liberal packing materials and struts shall be provided to
arrest rolling and to protect from transit damages.
Equipment and process materials shall be packed and semi-knocked down, to the
b)
extent possible, to facilitate handling and storage and to protect bearings and other
machine surfaces from oxidation. Each container, box, crate or bundle shall be
reinforced with steel strapping in such a manner that breaking of one strap will not
cause complete failure of packaging. The packing shall be of best standard to
withstand rough handling and to provide suitable protection from tropical weather
while in transit and while awaiting erection at the site. All the major equipments shall
be supplied in steel crates. The package shall be supplied in containers and it should
be suitable for storage in the outside yard of the plant for a minimum period of 12
months.
Equipment and materials in wooden cases or crates shall be properly cushioned to
c)
withstand the abuse of handling, transportation and storage. Packing shall include
preservatives suitable to tropical conditions. All machine surfaces and bearings shall
be coated with oxidation preventive compounds. All parts subject to damage when in
Vendor to
S. No Description
confirm
The erection of Limestone Grinding System (LGS) will be done by owner (BHEL)
a)
as per Erection Manual and check List provided by bidder. The bidder has
to supervise for erection, pre-commissioning & post- commissioning check-up,
start-up, trial runs of all the items covered under the scope of supply.
There will be Six visits per grinding system totally there will be 12 visits. The
b)
bidder will be informed well in advance for the visit. Bidder shall consider 60
working days per grinding system.
In case erection and commissioning activities get delayed due to any account,
c)
resulting into overstay of vendor supervisory engineer beyond schedule time, then
BHEL shall pay for additional man-day stay of vendor supervisory engineers. Vendor
to quote Per day cost for deputation along with this offer.
TA/DA, boarding and lodging shall be borne by the bidder and shall be inclusive in
d)
supervision charges portion.
Charges for supervision of Erection & commissioning shall be quoted by the bidder.
e)
Price comparison for evaluating the lowest bid will be considered all main supply,
f)
supervision of E&C charges and mandatory spares price all together.
12. EXCLUSION
Vendor to
S. No Description
confirm
The following work associated with the LGS will be by BHEL:
a. Supply of main drive HT motor
b. Civil foundations
(however vendor to provide foundation drawing & materials like Foundation bolts,
anchor bolts, nuts)
c. Walkways, platforms and ladders
(Vendor to provide GA drawing. However, fabrication & material supply, Erection
by BHEL)
d. Element handling hoists
Vendor to
S. No Description
confirm
(i) MQP (Manufacturing Quality Plan) shall be submitted in attached format for
BHEL/Customer review & approval. Typical MQP is attached (Annexure-11) for
indicative purposes for guidance & use.
(ii) MQP shall invariably cover w.r.t Inward inspection including on Raw material
Procurement, In process and Final inspection in elaborated way/details.
(iii) Bidder shall also to give specific confirmation that on need basis, their competent
officials shall visit to BHEL/customer for finalization of Quality plan including test
procedure/methodology during pre- award / post award approval / detailed
engineering in the event of an order.
(iv) No deviation on BHEL/Customer approved MQP is acceptable.
(v) Bidder shall agree to submit all cross referred documents other than
codes/standards to BHEL/Customer/Consultant.
1. Important Notes shall be included in MQP:
(a) Latest revision of Standard s & Specification shall apply. Only International
Standards are applicable. Indian & Chinese Standards are not applicable
(b) Materials shall be procured in compliance to Functional Technical Specification.
(c) Inspection shall be in compliance with Approved Quality Control Procedure for
the Product.
(d) NDT shall be carried out by Qualified Personnel with compliance to Approved
NDT Procedures and Acceptance Norms, as per ASME Section V.
(e) Gauges and measuring Instruments, with valid calibration only shall be used.
(f) Cleaning and Painting of products shall be carried out as per Approved Painting
Schedule.
(g) Finished Products shall be packed to comply with Approved Packing Schedule.
(h) Welding shall be carried out by Qualified Personnel with compliance to Approved
NDT Procedures and Acceptance Norms, as per ASME Section V.
2. Domestic / Inland Inspection will be carried out by BHEL/BHEL appointed Third
Party Inspection Agency (TPIA) / Customer/Customer Appointed Inspection
Agency/Consultant. This is applicable for all Stage inspection and Final Inspection
identified as "W" - Witness or "CHP" - Customer Hold Point as per customer
approved Quality Plan/ Technical specification / Approved Drawing/ Approved Data
sheet / Scheme / PID / PFD / SLD (Process Instrumentation Diagram / Process Flow
Diagram / Single Line Diagram) etc. (As applicable).
“The inspection charges at actuals incurred by BHEL will be loaded to compare with
foreign suppliers”.
3. Inspection Agency for Foreign Bidders and also for Indian Bidder but importing
from Foreign Sources:
2. List of Non-Destructive test over and above the material test are as follows:
a. Mechanical Seal- Manufacturer’s recommendation.
b. Base Plate- Stress relieving of weld.
c. Replaceable Rubber liner- Shore Hardness, Class and Type certificate.
Rubber wear lining of Mill Shell shall be checked for shore hardness.
For Central driven ball mill shall be run tested (without grinding media) for 30 min
2. at shop to check unusual noise and vibration.
Butt welds in the tube/separator/body casing of the mill shall be tested by RT and
MPI. All other welds in main tube/separator shall be tested by MPI/LPI for
acceptance. The tube shall be statically balanced
All gearboxes shall be run tested for adequate duration to check rise in oil
temperature, noise level and vibration. Check for leak tightness of gear case also shall
be performed.
All WBMs will be inspected at the Bidder’s works before dispatch or where the test
facilities are available.
3. Feeders
75
14209, DFT- 75μ/coat
Finish: One coat of acrylic aliphatic polyurethane paint
25
to IS 13213, DFT- 25μ/coat
TOTAL DFT (μm min)
300
14.2. Limestone Mill- Inside Surfaces:
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Blast cleaning to Sa 2½ (Near white metal)
with surface profile 40-60μm conforming to ISO 8501-1
Total DFT
PAINT (μm min)
Primer Coat: One coat of two component moisture
70
curing inorganic Ethyl Zinc Silicate Primer to IS 14946,
PRIMER
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Power Tool Cleaning to St3 (SSPC-SP3)
Total DFT(μm
PAINT
min)
Primer: Red Oxide Zinc Phosphate Primer to IS: 60
PRIMER
100
DFT-50μm/coat
Shade: Grey white RAL 9002
Identification tag: Sea green shade no: 217 as per IS 5
TOTAL DFT (μm min) 210
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Power Tool Cleaning to St3 (SSPC-SP3)
Total DFT(μm
PAINT
min)
Primer: Red Oxide Zinc Phosphate Primer to IS: 12744
PRIMER
60
(Two coats)
Intermediate: One coat of Synthetic Enamel
50
intermediate coat to IS 2932; DFT- 50μ
Two coats of Synthetic Enamel to IS 2932,
100
FINISH
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Power Tool Cleaning to St3 (SSPC-SP3)
Total DFT
PAINT
(μm min)
Primer: Two coats of Epoxy resin based Epoxy Zinc
100
phosphate primer to IS 13238
PRIMER
75
14209, DFT- 75μ/coat
Finish: One coat of acrylic aliphatic polyurethane paint
25
to IS 13213, DFT- 25μ/coat
TOTAL DFT (μm min)
300
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Power Tool Cleaning to St3 (SSPC-SP3)
Total DFT
PAINT
(μm min)
Primer: Two coats of Epoxy resin based Epoxy Zinc
100
phosphate primer to IS 13238
PRIMER
75
14209, DFT- 75μ/coat
Finish: One coat of acrylic aliphatic polyurethane paint
25
to IS 13213, DFT- 25μ/coat
TOTAL DFT (μm min)
300
Vendor to
S. No Description
confirm
SURFACE PREPARATION:
Power Tool Cleaning to St3 (SSPC-SP3)
Total DFT
PAINT (μm min)
Red Oxide Zinc Phosphate Primer to IS: 12744 (Two
PRIMER
60
coats)
60
9002 (Two coats)- 30μ/ coat
15. SPARES
Vendor to
S. No Description
confirm
a) The list of mandatory spares considered essential by the Employer is indicated in the
list below. The bidder shall indicate the prices for each and every item (except for
items not applicable to the bidders design) in the ‘Schedule of Mandatory Spares’
whether or not he considers it necessary for the Employer to have such spares. If the
bidder fails to comply with the above or fails to quote the price of any spare item, the
cost of such spares shall be deemed to be included in the contract price. The bidder
shall furnish the population per unit of each item in their Bid. Whenever the quantity
is mentioned in “sets” the bidder has to give the item details and prices of each item.
b) Whenever the quantity is indicated as a percentage, it shall mean percentage of total
population of that item in the station (project), unless specified otherwise, and the
fraction will be rounded off to the next higher whole number. Wherever the
requirement has been specified as a ‘set’ (marked by **) it will include the total
requirement of the item for a unit, module or the station as specified. Where it is
specified as ‘set’ (marked by*) it would mean the requirement for the single
equipment / system as the case may be. Also one set for the particular equipment. e.g.
‘set’ of bearings for a pump would include the total number of Bearings in a pump.
Also the ‘set’ would include all components required to replace the item; for example,
a set of bearings shall include all hardware normally required while replacing the
bearings.
c) The assembly / sub assembly which have different orientation (like left hand, right
hand, top or bottom), different direction of rotation or mirror image positioning or
any other regions which result in maintaining two different sets of spares to be used
for subject assembly / sub-assembly shall be considered as different type of
assembly/sub-assembly.
g) Bidder to provide the split up price for mandatory spares during placement of order.
h) Bidder shall indicate the service expectancy period for the spare parts under normal
operating conditions before replacement is necessary.
i) All spares supplied under this contract shall be strictly inter-changeable with the parts
for which they are intended for replacements. The spares shall be treated and packed
for long storage under the climatic conditions prevailing at the site e.g. small items
shall be packed in sealed transparent plastic with desiccators packs as necessary.
j) All the spares shall be manufactured as per same specification quality plan.
q) Wherever quantity has been specified as percentage (%), the quantity of mandatory
spares to be provided by bidder shall be the specified percentage (%) of the total
population of the plant. In case quantity so calculated happens to be fraction, the same
shall be rounded off to next higher whole number.
r) Where ever quantity has been indicated for each type, size, thickness, material, radius,
range etc., the same shall be furnished in the bid.
s) In case spares indicated in the list are not applicable to the particular design offered
by the bidder, the bidder should offer spares applicable to offered design with
quantities generally in line with the approach followed:
15.2.1. Hydro-cyclone
Vendor to confirm
S. Nos. /Sets for each
Description whether he quoted
No project
or not
10% of each type
1) Hydro-cyclone isolation valve OR 1 no. whichever
is higher
10% of each type
2) Hydro-cyclone OR 1 no. whichever
is higher
10% of each type
Hydro-cyclone rubber lining-Feed chamber and
3) OR 1 no. whichever
overflow chamber
is higher
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
1) Belt 4 sets*
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
1) Mill wear parts (liners) & grinding element 1 sets
Note: One set of Mill wear parts (Liners) above is
defined as under:
Where:
GWL = Guaranteed wear life of Mill wear parts as
offered by the bidder.
2) Auxiliary motor 1 nos
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
2 no of each type
1. Slurry valves
and size
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
2 no of each type
1. Slurry line bends
and size
Vendor to confirm
Nos. /Sets for each
Sl. No Description whether he quoted
project
or not
1. Impeller assembly 1 no of each type
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
1. Impeller Assembly 1 nos. of each type
Casing Liners (where replaceable liners are
2. 2nos. of each type
provided)
3. Seals 4 sets of each type
Following items shall be provided under this clause for all modulating control values
under this package even if one or more of these items are also specified elsewhere
under mandatory spares
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
10% or 1 no of each
type, model and
1. Pneumatic and electro-hydraulic actuator assembly
rating, whichever is
more
Diaphragms, O’ rings, seals etc. of all types make
2. 100%
etc.
10% or 2 nos. of each
3. Pressure Gauges of all types
whichever is more
10% or 2 nos. of each
4. Solenoid valves (if applicable)
whichever is more
Positioner units/smart positioners (complete unit)& 10% or 1 no. of each
5.
accessories (link assembly) whichever is more
Pneumatic air-filter/Regulator of each type, make 10% or 2 nos. of each
6.
rating etc. whichever is more
10% or 2 nos. of each
7. Air lock relays
whichever is more
Vendor to confirm
Sl. Nos. /Sets for each
Description whether he quoted
No project
or not
10% or 1 no of each
type, model and
1. Pneumatic and electro-hydraulic actuator assembly
rating, whichever is
more
Diaphragms, O’ rings, seals etc. of all types make
2. 100%
etc.
Limit switches (complete unit) & accessories (link 10% or 2 nos. of each
3.
assembly) whichever is more
Pneumatic air-filter/Regulator of each type, make 10% or 2 nos. of each
4.
rating etc. whichever is more
7. Torque And limit switch assembly of each unit 2 nos. of each type
Vendor to
S. No Description
confirm
Any special tools & tackles required for the entire equipment to disassemble,
1.
assemble or maintain the units, they shall be included in the quotation and furnished
as part of the initial supply of the machine. List of special tools & tackles shall be
decided by bidder as per his proven practice. When special tools are provided, they
shall be packaged in separate, boxes with lugs and marked as “Special Tools for (tag
/ item number).”Each tool shall be stamped or tagged to indicate its intended usage.
Levers and eye bolts for the removal of parts to be serviced shall be submitted with
special tools.
SCHEDULE OF GUARANTEES:
All performance tests shall be carried out in accordance with the relevant latest international codes/standards.
Bidder to confirm the compliance with Sub-Section –VI (Functional Guarantees & Liquidated Damages) of
NTPC Specification, part of Annexure-13 of this specification.
CATEGORY –I GUARANTEES:
Data
S. No Description
Bidder to Provide
1. Guaranteed auxiliary power consumption (equipment’s to be considered for
power consumption is as per 18.1 of this technical specification) at rated
capacity in KW. Bidder shall furnish Break-up among list of equipment’s
considers which is subjected to approval.
OTHER GUARANTEES
Data
S. No Description
1. Maximum vibration (peak to peak amplitude at site) microns Bidder to Provide
≥ 25,000 hours
2. Scheduled Maintenance (Minor Overhauls): Recommended intervals
between maintenance outages
Vendor to
S. No Description
confirm
All performance tests for WBM shall be carried out in accordance with any latest
1.
International codes/standards.
1. Capacity of the WBM to be guaranteed 87.9 TPH (with output fineness of 90%
or higher passing through 325 mesh for the range of Limestone specified
elsewhere).
2. The Bidder shall ensure a design of the equipment to achieve an average target
availability of 98% for 120 days.
3. All the wear parts of the WBM shall be guaranteed for a minimum wear life of
not less than 8000hrs.
5. Noise level ≤ 90 dBA( for ball mill excluding motor) and ≤ 85 dBA (for other
equipment’s) at 1m horizontal distance from equipment/enclosures and 1.5m
above operating floor is to be guaranteed excluding motor.
6. Vibration levels measured on the non-rotating parts shall not exceed the zone
limit “B” as defined in ISO 10816 at steady conditions and shall not exceed the
zone limit “C” as defined in ISO 10816 at transient conditions.
7. Acceptance tests to be carried out as per the procedure defined by the bidder
which shall be submitted for BHEL/ NTPC approval.
8. Power consumption for entire wet ball milling system. Bidder to submit
procedure to calculate motor shaft power as per IEC-60034 standard
9. In the event that the performance test is unsuccessful, bidder shall take necessary
remedial action at his cost and the performance test shall be repeated.
10. Product size: 30 wt. % slurry 325 mesh 90% passing limestone.
11. Refer Annexure-13 for functional guarantees and liquidated damages for short
fall in performance, bidder to confirm the compliance accordingly.
Reject the equipment /System / plant and recover from the contractor the payment
already made
OR
Accept the equipment /system/plant after levying LD. The LD for shortfall in
performance indicated in clause 18.0. The LD’s shall be pro-rated for the
fractional parts of the deficiencies.
13. For Category – III & OTHER guarantees: In case during performance it is
found that equipment/system has failed to meet the guarantees, the contractor
shall carry out all necessary modifications and/or replacements to make the
equipment/system comply with the guaranteed requirement at no extra cost to the
employer and re-conduct the performance guarantees test(s) with Employers
consent. In case the specified performance guarantee(s) are still not met even after
the above modifications /replacements within 90 days or reasonable period
allowed by the Employer, after tests have been completed. the employer will have
the right to either of the following:
Reject the equipment /System / plant and recover from the contractor the payment
already made
OR
Accept the equipment /system/plant after assessing the deficiency in respect of
the various ratings, performance parameters and capabilities and recover from the
contract prices an amount equivalent to the damages as determined by NTPC.
Such damages shall, however be limited to the cost of replacement of equipment,
replacement of which shall remove deficiency so as to achieve the guaranteed
performance.
Vendor to
S. No Description
confirm
1. GUARANTEED POWER CONSUMPTION
Bidder to specify the guaranteed power consumption of complete limestone grinding
system as well as individual equipment in their offer. While guaranteeing the
auxiliary power consumption the bidder shall necessarily include all continuously
operating packages under scope of supply. The auxiliaries to be considered shall
include but not be limited to the following for Guaranteed Power consumption
calculation (GPC).
a. Gravimetric feeder – 1 No.
b. Wet Ball mill Main Motor (Shaft Power- Bidder to submit procedure
to calculate motor shaft power as per IEC standard.) - 1 No.
c. Mill Circuit Pump- 1 No.
d. Mill circuit Tank Agitator- 1 No.
e. Wet ball mill lubrication – 1 set working pumps(HP Lube Oil Pump &
LP Lube Oil Pumps)
f. Main reducer lubrication system - 1 set of working pumps
The equipment’s listed above for calculating auxiliary power consumption are
indicative. Any other equipment requires for continuous operation of the system shall
be considered for calculation of auxiliary power consumption
BIDDER TO GUARANTEE POWER CONSUMPTION ≤ 2630 KW FOR ENITRE WET BALL
2.
MILLING SYSTEM.
In case power consumption more than 2630 KW bidder shall be loaded 1, 98,198
INR per KW.
Vendor to
S. No Description
confirm
1. If actual shaft Power Consumption during prove out (or) PG Test operating at the
duty point exceeds the value guaranteed by the bidder, liquidated damages for
shortfall in performance shall be deducted from contract price as per the formula
given below
Liquidated damage deductible in INR per WBM = (APC-GPC) X P X 1 No. of
Working WBM
Where,
GPC- Guaranteed Shaft Power Consumption quoted by bidder in
KW
APC- Actual Shaft Power Consumption in KW
P- Penalty @ Rs 1,98,198 per KW
Note:
In case of shortfall bidder has to carry out necessary modifications and/or
replacements at no extra cost to the employer and re-conduct performance
test with employers consent. In case the specified performance guarantees are
not met and are within the acceptable shortfall limit (+1% of guaranteed
auxiliary power consumption) then penalty shall be imposed.
If the contract currency is other than US dollars, then the liquidated damages
shall be in equivalent amount in contract currency based on Bill selling
exchange rate of State Bank of India prevailing on the 8th March 2018.
20. WARRANTY
Vendor to
S. No Description
confirm
1. The Bidder warrants that the equipment/ items shall be free from defects in the design,
engineering, materials and workmanship of the Plant and Equipment supplied and of
the work executed. The Defect Liability Period shall be thirty six (36) months from
the date of supply (or any part thereof) or twenty four (24) months from the date of
commissioning (or any part thereof), whichever first occurs. If during the Defect
Liability Period any defect should be found in the design, engineering, materials and
workmanship of the Plant and Equipment supplied or of the work executed by the
Bidder, the Bidder shall promptly, in consultation and agreement with BHEL
regarding appropriate remedying of the defects, and at its cost, repair, replace or
otherwise make good (as the Bidder shall, at its discretion, determine) such defect as
well as any damage to the Facilities caused by such defect.
S. No Description Vendor to
confirm
1. Bidder’s scope shall also include supply and filling of all chemicals, reagents, resins,
lubricants, grease, filters and consumable items for operation up to commissioning
including top up requirements. All lubricants proposed for the plant operation shall
be suitable for all operating and environmental conditions that will be met on site
consistent with good maintenance procedures as instructed in the maintenance
manuals.
2. Detailed specifications for the lubricating oil, grease, gases, servo fluids, control
fluids, chemicals including items qualities and quantities required per month of the
plant operation for the NTPC/BHEL’s approval herein shall be furnished within 2
months f placement of Order. On completion of erection complete list of
bearings/equipment giving their location and identification marks shall be furnished
to BHEL along with lubrication requirements. All types of chemicals, consumables,
lubricants and grease shall be readily obtainable locally and the number of different
types shall be kept to a minimum. For each type and grade of lubricant recommended,
bidder shall list at least three equivalent lubricants manufactured by alternative
companies.
22. TRAINING
S. No Description Vendor to
confirm
Successful bidder shall provide comprehensive training for NTPC/BHEL
Engineering, O&M, Erection & Commissioning staffs at site covering all aspects of
the LGS system - Operation & Maintenance, Troubleshooting etc. and also
Engineering personnel at manufacturer’s works.
23. CONFLICT
S. No Description Vendor to
confirm
Bidder’s equipment shall be designed for and shall meet the service, performance and
minimum level of quality requirements specified. Bidder shall be solely responsible
for advising NTPC in writing of any conflicts between the specifications and Bidder’s
design, including performance and levels of quality. Bidder agrees that its obligations,
24. DOCUMENTATION
S. No Description Vendor to
confirm
Bidder shall submit necessary data, documents , GA drawings (PDF & DWG),
sections, sub-assembly drawings, specifications of main and sub components and
necessary set of operation & maintenance manual as asked by NTPC must be
furnished by bidder in soft copy forms for review. The documents will be in PDF as
well as editable form like DOC, XLS, DWG.
ANNEXURES LIST
Annexure Description
Sl. No.
1. Qualification requirement.
2. Deviation list.
3. Media Analysis.
4. P&ID.
5. Sub-questionnaire for suppliers.
6. Piping and valves specification.
7. Motors & JB’s.
8. VFD’s.
9. Instruments.
10. Packing & forwarding.
VARIANT TABLE
* Limestone grinding system scope of supply per set is as per Chapter No.: 07.
# Mandatory Spares Lot is as per Chapter No. 15.2.