PST-34VC - VF V1.0 Eng
PST-34VC - VF V1.0 Eng
PST-34VC - VF V1.0 Eng
Assembly instructions:
By extracting the material from the packaging, you will find some of the main tubes already pre-
assembled, in telescopic sequence. By tilting the package, make sure that all heads of each diameter
protrude from the main tube. The 35mm diameter section contains the load coil in the center, handle
it with care.
Lightly lubricate the thread of all the bolts before mounting them (stainless steel tends to nail
down very easily).
The elements are assembled by inserting the bolt from the larger hole side so that the bolt
cylindrical head is well recessed and rests on the internal tube as show in fig. 1.
Fully tighten the nut. Make sure that all bolt heads are on the same side.
Using the same way, extract and join all the sections, except the one with the largest diameter that
should be mounted, first on the base and then proceed with the final assembly.
When the larger diameters are assembled, insert the 30m trap and end tip. The trap has two drainage
holes that need to look down.
The section of tube under the trap and the tip have multiple holes which are used to make small fine
tuning adjustments on the two bands. Calibrate the 30m band first and then the 40m band. By
lengthening you go down in frequency, by shortening you go up.
After completing the assembly of the radiator, proceed with the assembly of the base which has a
whole series of holes, which must be equipped and prepared following the photographic sequence.
Install the 8 4x25MA bolts on the X holes and the 4x16 bolt on the side hole as shown in the photo.
Correct sequence for all bolts: bolt, knurled washer, normal nut, 2 flat washers and self-locking nut.
Lock all the bolts by fully tightening the normal nut.
Continue the assembly fitting in the two insulators the largest 40mm lower section. Leave the bolts
slightly loose so that you can easily move the tube into its final position with the bottom end
protruding approximately 2cm from the insulator. Install the 4x20MA bolt on the radiator and lock
it, insert a flat washer, insert the eyelet of the RF wire, another flat washer and normal nut. Lock the
insulator bolts and install the RF choke. Make sure that the chocke is vertical for better rain
drainage. The choke will eliminate any electrostatic charges and some noise.
DO NOT SEAL THE JOINTS, the antenna must breathe.
The care and precision of this assembly will ensure a long life for the antenna.
Check that all bolts have been properly tightened and completed bolt tightening.
Use the U-bolts, to install the base on the mast and install the radials.
The U-shaped collars are 50mm, but they can hold up to 40mm mast pipe.
There are two rigid radials per band and must be mounted opposite each other. The assembly for
convenience, can also be done after putting the antenna on the mast, once the calibration is finished,
each pair must have exactly the same length.
Those for 30m have the shortest tip.
If you have chosen the version with wure radials, they require particular care in the implementation
as they can also heavily influence the final operation. It may be necessary to try to find the best
operating point. Always do this equally on all radials of the same band.
Finished and installed antenna.
Once assembled, the antenna must look similar to the one in the photo.
The antenna with rigid radials can be installed at any height, preferably at least 1-2m over the
ground but it also works at a few tens of cm as in the photo, only the calibration becomes more
critical. The version with wire radials makes the best performance if installed a few cm over the
ground with the radials lying on the ground-floor.
Calibrate the radiator first and then the radials, it may be necessary to repeat the operation several times.
After completing the tuning operations, check and complete the tightening of all nuts.
Antenna is self supporting, do not use guy-wires , do not seal the joints.
Specifications:
Note: when installed the antenna may be affected by environmental influences so it may be
necessary to recalibrate it in whole or in part.
Avoid as far as possible the presence of poles or other metal objects parallel to the antenna.
Start calibrating from the highest band (30m) and continue with the lowest one (40m).
Stretch to go down, shorten to go up in frequency.
Antenna diagram
Do not install the antenna near bare power lines or other sources of electrical power at risk of
electrocution, you could be killed or seriously injured. Make sure that no one can come into
contact, even accidental, with it during use
Install the antenna on adequately sized supports to support its load even in strong wind
conditions.
The fall of all or part of it could hit people and / or things with unpredictable damage..
Dear Buyer,
thank you for purchasing a Pro.Sis.Tel antenna.
The best materials available on the market were used in the construction, processed and finished with the
best possible care allowed by the state of the art.
Use it within the limits of use for which it was built and it will serve you faithfully for many years.
In case of doubts or concerns, our technical department will always be available to provide you with all the
necessary support.
Your opinion and suggestions will allow us to improve our products even more.
Best regards
Annamaria Fiume IK7MWR
MADE IN ITALY
________________________________________________________________________
WARNING! Defend the environment