Rabt Hotel D'big Same Cilacap As Per 17 Oktober 2023 Rev 2
Rabt Hotel D'big Same Cilacap As Per 17 Oktober 2023 Rev 2
Rabt Hotel D'big Same Cilacap As Per 17 Oktober 2023 Rev 2
URAIAN
10/10/203
(Ribu Rp.) (%)
1 RESIKO -
2 PEMASARAN 630,000.00 5.00
3 PPH 2.5% - -
4 MARGIN 1,807,793.53 14.35
12,600,000.00
IV OK Netto 100.00
Christoporus.P
RABT PEGAWAI & ALAT
PEMBANGUNAN HOTEL D' BIG SaMe
PEGAWAI
1 Project Manager - -
2 Site Manager 1.00 Org 6.00 Bln 8,000,000.00 - 48,000,000.00
3 Supervisor CSA 2.00 Org 6.00 Bln 6,000,000.00 - 72,000,000.00
4 Supervisor MEP
5 Quality CSA - -
6 Quality MEP - -
7 Safety Officer
8 Admin project 1.00 Org 6.00 Bln 4,000,000.00 24,000,000.00
9 Engineering -
10 Surveyor 1.00 Org 6.00 Bln 6,000,000.00 36,000,000.00
11 Ass Surveyor 1.00 Org 6.00 Bln 4,500,000.00 27,000,000.00
12 Safety man -
13 Koordinator sekurity
14 Sekurity
15 Gudang 1.00 Org 6.00 Bln 5,000,000.00 30,000,000.00
16 Leader harian mekanikal Elektrikal 1.00 Org 6.00 Bln 5,000,000.00 30,000,000.00
17 Harian Mekanik Elektrikal 1.00 Org 6.00 Bln 3,500,000.00 - 21,000,000.00
18 Harian Gudang 1.00 Org 6.00 Bln 2,500,000.00 15,000,000.00
10.00 Org
44,500,000.00 303,000,000.00
JUMLAH 131,150,000.00
Rata2/Bulan 3,643,055.56
Check oleh,
______________________ Christoporus.P
RABT - ALAT PENUNJANG
PEMBANGUNAN HOTEL D' BIG SaMe
JUMLAH = 85,200,000
Rata2/Bulan 14,200,000
RABT - KENDARAAN
PEMBANGUNAN HOTEL D' BIG SaMe
JUMLAH = 127,280,000
Rata2/Bulan 21,213,333
RABT PERSIAPAN
PEMBANGUNAN HOTEL D' BIG SaMe
Rata2/Bulan 7,750,000
Christoporus.P
REKAPITULASI RENCANA ANGGARAN BIAYA
PEMBANGUNAN HOTEL D'Big SaMe CILACAP JAWA TENGAH
NO URAIAN JUMLAH
1 2 3
PEMBANGUNAN TAHAP - PERTAMA, BANGUNAN HOTEL @ 6 LANTAI
I HOTEL
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Zak 5.3200 75,000.00 399,000.00
2 Pasir Pasang M3 0.5429 221,800.00 120,405.71
3 Batu Kerikil M3 0.7622 249,525.00 190,193.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 371.0000 1,500.00 556,500.00
2 Pasir Pasang M3 0.4986 221,800.00 110,583.14
3 Batu Kerikil M3 0.7756 249,525.00 193,520.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 384.0000 1,500.00 576,000.00
2 Pasir Beton M3 0.4943 221,800.00 109,632.57
3 Batu Kerikil M3 0.7696 249,525.00 192,041.83
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 413.0000 1,500.00 619,500.00
2 Pasir Beton M3 0.4864 221,800.00 107,889.86
3 Batu Kerikil M3 0.7563 249,525.00 188,714.83
4 Air Ltr 215.0000 25.00 5,375.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 326.0000 1,500.00 489,000.00
2 Pasir Beton M3 0.5429 221,800.00 120,405.71
3 Batu Kerikil M3 0.7622 249,525.00 190,193.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 247.0000 1,500.00 370,500.00
2 Pasir Beton M3 0.6207 221,800.00 137,674.43
3 Batu Kerikil M3 0.7400 249,525.00 184,648.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 299.0000 1,500.00 448,500.00
2 Pasir Beton M3 0.5707 221,800.00 126,584.43
3 Batu Kerikil M3 0.7533 249,525.00 187,975.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 352.0000 1,500.00 528,000.00
2 Pasir Beton M3 0.5221 221,800.00 115,811.29
3 Batu Kerikil M3 0.7637 249,525.00 190,563.17
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Semen @50 Kg Kg 448.0000 1,500.00 672,000.00
2 Pasir Beton M3 0.4764 221,800.00 105,671.86
3 Batu Kerikil M3 0.7407 249,525.00 184,833.33
4 Air Ltr 215.0000 25.00 5,375.00
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Besi Beton Kg 1.0500 9,700.00 10,185.00
2 Kawat Beton Kg 0.0150 22,180.00 332.70
B. UPAH
1 Mandor OH 0.0003 130,014.00 39.00
2 Kepala Tukang OH 0.0007 131,062.50 91.74
3 Tukang Besi OH 0.0070 132,111.00 924.78
4 Pekerja OH 0.0070 128,441.25 899.09
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Besi Beton Kg 1.0500 9,700.00 10,185.00
2 Kawat Beton Kg 0.0150 22,180.00 332.70
B. UPAH
1 Mandor OH 0.0003 130,014.00 39.00
2 Kepala Tukang OH 0.0007 131,062.50 91.74
3 Tukang Besi OH 0.0070 132,111.00 924.78
4 Pekerja OH 0.0070 128,441.25 899.09
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Wiremash M8 Kg 1.0500 9,700.00 10,185.00
2 Kawat Beton Kg 0.0150 22,180.00 332.70
B. UPAH
1 Mandor OH 0.0003 130,014.00 39.00
2 Kepala Tukang OH 0.0007 131,062.50 91.74
3 Tukang Besi OH 0.0070 132,111.00 924.78
4 Pekerja OH 0.0070 128,441.25 899.09
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls III M3 0.0400 1,150,000.00 46,000.00
2 Paku Kg 0.3000 25,000.00 7,500.00
3 Minyak Bekisting Lt 0.1000 20,000.00 2,000.00
B. UPAH
1 Mandor OH 0.0260 130,014.00 3,380.36
2 Kepala Tukang OH 0.0260 131,062.50 3,407.63
3 Tukang Kayu OH 0.2600 132,111.00 34,348.86
4 Pekerja OH 0.5200 128,441.25 66,789.45
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Kls III M3 0.0450 1,150,000.00 51,750.00
2 Paku Kg 0.3000 25,000.00 7,500.00
3 Minyak Bekisting Lt 0.1000 20,000.00 2,000.00
B. UPAH
1 Mandor OH 0.0260 130,014.00 3,380.36
2 Kepala Tukang OH 0.0260 131,062.50 3,407.63
3 Tukang Kayu OH 0.2600 132,111.00 34,348.86
4 Pekerja OH 0.5200 128,441.25 66,789.45
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 1,150,000.00 46,000.00
2 Kayu Balok Kls III M4 0.0150 1,150,000.00 17,250.00
3 Paku Kg 0.4000 25,000.00 10,000.00
4 Minyak Bekisting Lt 0.2000 20,000.00 4,000.00
5 Multipleks T = 6 mm Lbr 0.3500 87,888.25 30,760.89
6 Dolken Kayu Galam Dia. 8-10 Cm Pjg 4 M Btg 2.0000 13,585.25 27,170.50
B. UPAH
1 Mandor OH 0.0330 130,014.00 4,290.46
2 Kepala Tukang OH 0.0330 131,062.50 4,325.06
3 Tukang Kayu OH 0.3300 132,111.00 43,596.63
4 Pekerja OH 0.6600 128,441.25 84,771.23
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 1,150,000.00 46,000.00
2 Kayu Balok Kls III M4 0.0180 1,150,000.00 20,700.00
3 Paku Kg 0.4000 25,000.00 10,000.00
4 Minyak Bekisting Lt 0.2000 20,000.00 4,000.00
5 Multipleks T = 6 mm Lbr 0.3500 87,888.25 30,760.89
6 Dolken Kayu Galam Dia. 8-10 Cm Pjg 4 M Btg 2.0000 13,585.25 27,170.50
B. UPAH
1 Mandor OH 0.0330 130,014.00 4,290.46
2 Kepala Tukang OH 0.0330 131,062.50 4,325.06
3 Tukang Kayu OH 0.3300 132,111.00 43,596.63
4 Pekerja OH 0.6600 128,441.25 84,771.23
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
1 Kayu Terentang Kls III M3 0.0400 1,150,000.00 46,000.00
2 Kayu Balok Kls III M4 0.0150 1,150,000.00 17,250.00
3 Paku Kg 0.4000 25,000.00 10,000.00
4 Minyak Bekisting Lt 0.2000 20,000.00 4,000.00
5 Multipleks T = 6 mm Lbr 0.3500 87,888.25 30,760.89
6 Dolken Kayu Galam Dia. 8-10 Cm Pjg 4 M Btg 6.0000 13,585.25 81,511.50
B. UPAH
1 Mandor OH 0.0330 130,014.00 4,290.46
2 Kepala Tukang OH 0.0330 131,062.50 4,325.06
3 Tukang Kayu OH 0.3300 132,111.00 43,596.63
4 Pekerja OH 0.6600 128,441.25 84,771.23
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Pekerja OH 2.0000 128,441.25 256,882.50
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)
A. BAHAN
Sub Total A -
B. UPAH
1 Pekerja OH 0.0400 128,441.25 5,137.65
2 Mandor OH 0.0040 130,014.00 520.06
Harga Jumlah
No. Uraian Sat Volume Satuan Harga
(Rp.) (Rp.)