Laban Complete Drawings
Laban Complete Drawings
PERSPECTIVE
VICINITY MAP
A1
A1
DPWH
MUNICIPALITY OF CASTILLA
OFFICE OF THE BUILDING OFFICIALS
SITE DEVELOPMENT PLAN A1
A R C H I T E C T U R A L
GROUND FLOOR PLAN A2 BUILDING OFFICIAL
ROOF PLAN A2
FRONT ELEVATION A3
REAR ELEVATION A3
FOUNDATION PLAN S1
ARCHITECTURAL
ROOF BEAM LAYOUT S1
S T R U C T U R A L
WALL FOOTING DETAILS S1
COLUMN SCHEDULE S1
1 PERSPECTIVE
A1 SCALE nts STRUCTURAL
ROOF FRAMING PLAN S2
18.25m
ROOF BEAM PLAN S2
TECHNICAL DESCRIPTION 8.25m 3.75m 6.25m
E L E C T R I C A L
5-6 N18°-43'W 71.02m GROUND FLOOR LIGHTING LAYOUT E1 SANITARY
6-7 S68°-37'W 18.43m
7-8 S31°-49'W 102.81m GROUND FLOOR POWER LAYOUT E1
8-9 N56°-29'E 20.12m
9-10 S46°-59'E 24.80m
10-11 S46°-59'E 49.22m
ELECTRICAL NOTES E1
15.50m
11.00m
11-12 S00°-39'E 41.24m
N76°-01'E 18.51m ELECTRICAL LOAD COMPUTATION E1
13.00m
12-13
13-14 N03°-09'E 69.73m
14-15 N84°-57'E 12.84m THIS SITE
CIRCUIT BREAKER DIAGRAM E1
15-1 S16°-22'E 70.18m
ELECTRICAL
NATIONAL HIGHWAY ELECTRICAL SYMBOLS E1
BARANGAY ROAD
2.00m
P L U M B I N G
SEWER LINE LAYOUT P1
2.50m
7.13m
5.13m
PLUMBING NOTES P1
2.63m
FIRE SAFETY
WATER LINE ISOMETRIC VIEW P1
5.00m 6.77m
11.77m
5.25m 13.00m
ARCHITECT ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
PERSPECTIVE
18.25m
16.25m
8.25m 3.75m 6.25m
GUTTER
DS
W 11
5 GUTTER
11 2
1
10
1.50m
3
W GUTTER BUILDING LINE
4 W 4
5 DS
10 DN
9
1.00m
W
7
5.00m
BEDROOM 4
9 D
3
W
W
4
8
range 8
8 BEDROOM 3 W
closet 4
sink
KITCHEN D
A A
5.00m
2
W DINNING
BUILDING LINE
BUILDING LINE
island fd
6
D
T&B
7
15.50m
4 W
1.75m
GUTTER
GUTTER
D
11.00m
3
closet 2 wc
7
lav.
sho.
13.00m
ref
15.50m
2.75m
W
D 9
2
5
18.00m
D
4.00m
W BEDROOM 2 4
5 5
lav.
D
2
wc
T&B
closet
LIVING ROOM
W
4 4 DS
closet
sho.
fd
4.00m
BEDROOM 1 GUTTER
W W W
4 4 3
2.00m
3 DS
2.00m
W BUILDING LINE
4
3 1 GUTTER
2.50m
W W W
1 2 5
7.13m
GARAGE
PORCH
2
5.13m
2 4
4.50m
2.63m
1
UP
B 1
1 5.00m
11.77m
6.77m
5.25m 13.00m
1 2 3 4 6 8 10
A C E F G APEX
APEX
2.50m
2.50m
0.35m
TOP BEAM LINE CEILING LINE
0.35m
CEILING LINE
3.00m
GARAGE PORCH LIVING ROOM KIT. BEDROOM 3
3.00m
1.00m
1.00m
ARCHITECT ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
0.60m
0.40m
1.60m
F
F
0.9m
F
1.07m
0.70m
F
0.30
10 9 8 7 6 3
0.20m
A B C D E F G 11 5 4 2 1 FINISH FLR. LINE
W W W
1 2 3
ALUMINUM FRAMED AWNING WINDOW ALUMINUM FRAMED FIXED GLASS ALUMINUM FRAMED AWNING WINDOW
DESCRIPTION DESCRIPTION DESCRIPTION
APEX WITH FIXED GLASS WINDOW WITH FIXED GLASS
2.50m
0.60m 2.00m
0.50m
0.50m
0.35m
0.35m
F F F F 0.60m
6.85m
6.85m
0.90m
CEILING LINE
1.50m
0.70m
1.80m
F F
1.00m
3.00m
3.00m
F
1.40m
FINISH FLOOR LINE
1.00m
0.70m
1.00m
1.00m
NATURAL GRADE LINE
FINISH FLR. LINE
W W W
4 5 6
ALUMINUM FRAMED SLIDING WINDOW ALUMINUM FRAMED SLIDING WINDOW ALUMINUM FRAMED SLIDING WINDOW
DESCRIPTION DESCRIPTION DESCRIPTION WITH FIXED GLASS
WITH FIXED GLASS WITH FIXED GLASS
2.80m 2.40m
0.70m
0.6m
0.70m
1.80m
F F
1.80m
1.40m
0.70m
1 2 3 4 5 6 7 8 9 10 11 G F E D C B A FINISH FLR. LINE
W W W
7 8 9
ALUMINUM FRAMED SLIDING WINDOW
DESCRIPTION ALUMINUM FRAMED SLIDING WINDOW DESCRIPTION DESCRIPTION ALUMINUM FRAMED AWNING WINDOW
WITH FIXED GLASS
2.50m
1.00m 0.90 0.80m 0.70m
TOP OF BEAM
0.35m
0.35m
6.85m
6.85m
CEILING LINE
3.00m
3.00m
2.10m
2.10m
2.10m
2.10m
FINISH FLOOR LINE
1.00m
1.00m
NATURAL GRADE LINE
FINISH FLR. LINE
D D D D
1 2 3 4
DESCRIPTION SOLID WOOD PANEL DOOR DESCRIPTION SOLID WOOD PANEL DOOR DESCRIPTION SOLID WOOD PANEL DOOR DESCRIPTION SOLID WOOD PANEL DOOR
ARCHITECT ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
FRONT ELEVATION
16.25m 16.25m
TB01
RB-02
11 SLAB ON FILL
10mm Ø @ 600 mm
WF01
11
1.50m
1.50m
BOTHWAYS
C1F1 C1F1
4'' THICK CHB WITH 10 mm Ø
TB01
RB-02 VERTICAL REBARS @ 600 mm.,
10 10 &10 mm., Ø HORIZONTAL REBARS
1.00m
1.00m
C1F1 WF01
TB01 C1F1 C1F1 SPACED @ EVERY 3 LAYERS
RB-02
5.00m
5.00m
RB-02
RB-02
9 9 OF CHB.
WF01
TB01
WF01
WF01
C1F1 TB01
RB-02
8 SLAB-ON-FILL
RB-02
WF01
TB01
C1F1 C1F1
TB01
WF01
5.00m
5.00m
RB-02
WF01
TB01
RB-02 RB-02
TB01
WF01 WF01
RB-02
RB-02
RB-02
TB01
WF01
1.75m
1.75m
TB01 TB01
7 7 RB-02 RB-02
3-12 mm Ø LONGITUDINAL
RB-02
TB01 C1F1
WF01
C1F1 C1F1
BOTTOM BARS
6 6
15.50m
15.50m
RB-02 RB-02 RB-02
RB-02
TB01
2.75m
2.75m
WF01
TB01
WF01
1.00
C1F1 C1F1
WF01
18.00m
18.00m
RB-02
RB-02
RB-02
TB01
12 mm Ø TRAVERSE
4.00m
4.00m
RB-02
WF01
TB01
5 WF01
5 BOTTOM BARS SPACED
WF01
RB-02
WF01
C1F1 C1F1 @ 300mm M.O.C.
0.20
WF01
RB-02
RB-02
WF01
4 4
RB-02
4.00m
4.00m
TB01
WF01
RB-02
TB01
C1F1 C1F1 C1F1
2.00m
2.00m
0.45
100 mm THK GRAVEL BED,
WF01
95 % COMPACTION
WF01
RB-02 RB-02
3 TB01 TB01
3
C2F2 C1F1 C1F1 C1F1
RB-01
RB-01
RB-01
2.00m
2.00m
WF01
WF01 SECTION
TB01
2 2
TB01
4.50m
4.50m
TB01 RB-01
C2F2
1 TB01
1 RB-01
C2F2 C2F2
10mm Ø LATERAL
10mm Ø LATERAL
TIES @ 5 - 50mm,
TIES @ 5 - 50mm,
@5 - 100mm, 0.25
@5 - 100mm, 0.20
REST @ 150mm
1.00m REST @ 150mm
0.25m
0.25
0.20
6-16mm ∅
5-12mm. ∅ 0.20m
4-12mm. ∅
BOTHWAYS BOTHWAYS
VERIFY
VERIFY
C-01 C-02
0.25m
1.00m
0.20m
0.20m
0.20m
ARCHITECT CIVIL ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
FOUNDATION PLAN
18.25m
2-16mm ∅ 2-16mm ∅
0.30m
0.30m
5-10mm ∅ spaced @ 50mm
2-16mm ∅ 2-16mm ∅
TRUSS 13
L/4 E.S M.S
rest spaced @ 150mm
RB-01
6
TR
TRUSS 14
S
US
BOTTOM BAR : 2-16mm ∅
US
TR
TR
TRUSS 9
US
6
S
5-10mm ∅ spaced @ 100mm
3
6
L/3
U SS
TR
TRUSS 15
L
TRUSS 14
SECTION
TR
TRUSS 10
TRUSS 7
US
0.20m 0.20m
S
4
TRUSS 11
15.50m
TRUSS 1
TRUSS 1
2-16mm ∅
RB-01 4-16mm ∅
11.00m
TRUSS 2
0.35m
0.35m
13.00m
TRUSS 8
S
2-16mm ∅ 4-16mm ∅
US
TR
E.S M.S
TRUSS 14
4
S
TR
US
RB-02
TRUSS 11
TR
TRUSS 14
US
US
S
TR
TOP BAR : 4-16mm ∅ TOP BAR : 2-16mm ∅
3
BOTTOM BAR : 2-16mm ∅ BOTTOM BAR : 4-16mm ∅
TRUSS 15
5-10mm ∅ spaced @ 50mm
TRUSS 16
TRUSS 11
TRUSS 11
TRUSS 5
TRUSS 8
TRUSS 5
L/4
rest spaced @ 150mm
2.00m
2.50m
0.20m 0.20m
7.13m
3-16mm ∅ 2-16mm ∅
5.13m
0.30m
0.30m
2.63m
L/3 5-10mm ∅ spaced @ 100mm
2-16mm ∅ 3-16mm ∅
L
E.S M.S
SECTION
5.00m 6.77m TB-01
11.77m
5.25m 13.00m
2.50m
m
2.16m
2.16m
2.10m
1.96m
1.20m 1.20m 1.20m 1.20m 1.20m 1.20m 1.90m 1.35m 1.35m 1.35m 1.20m 1.20m 1.20m 1.90m 1.20m 1.20m 1.20m 1.20m 1.20m 1.20m 1.82m 1.20m 1.20m 1.20m 1.20m 1.20m 1.78m 1.20m 1.20m 1.20m 1.20m 2.27m
1.90m 1.35m 1.20m 1.20m 1.20m 1.20m 1.20m 1.37m
11.00m 10.90m 9.02m 7.78m 7.37m 7.07m
6.8
7.12 5m 5.6
m 0m 5.6 4.7
2.50m
8 m 0m
2.25m
2.16m
1.96m
1.72m
m 6m
m
1.37m
1.23m
1.14m
1.20m 1.20m 1.20m 1.20m 1.58m 1.20m 1.20m 2.02m
1.20m 1.20m 1.20m 1.20m 1.95m 1.00m 1.20m 1.20m 1.20m 1.65m 1.20m 1.20m 1.20m 1.65m 1.20m 1.20m 1.20m 0.78m 1.59m 1.20m 1.71m
1.20m 1.20m 1.10m
6.75m 6.38m 6.25m 5.25m 4.38m 4.42m 3.50m
4.50m
0.78m
1.20m 1.18m 1.20m 0.80m
2.38m 2.00m
TRUSS 15 TRUSS 16
4 TRUSS DETAILS
S 2 SCALE 1:100 Mts.
ARCHITECT CIVIL ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
PLANTERS
ROOF LINE
PLANTERS ACU
- All Electrical works shall be done in accordance with the latest edition of the Philippine Electrical
2 2
3 b b 3 CKT
Code (PEC), the rules and regulations of the Local Enforcing Authority, the National Building Code,
and the requirements of the Local Power Company or Utility
10
4 4
a
DN DN
ACU
- Other Codes, standards governing the specific designs shall served as a guide or basis on the
b b
WP CKT
actual implementation and execution of Electrical works
BEDROOM 4 9 BEDROOM 4
Sa a
RANGE - All Electrical works shall be under the direct supervision of either of the following with valid license:
b range b range
CKT Professional Electrical Engineer
12
Registered Electrical Engineer
BEDROOM 3 BEDROOM 3
Registered Master Electrician
a b
closet closet
sink sink
b
CKT
- Electrical Supply shall be as required for specific use whether:
ROOF LINE
ROOF LINE
2 Sab
KITCHEN island DINNING fd KITCHEN island DINNING fd 220 V Single Phase 2 - Wire 60 Hz system
a Sab Sa
a 110 / 220 V Single Phase 3 - Wire 60 Hz system
T&B T&B
a a
b Sa
b
closet
lav.
wc closet
lav.
wc
- All wires and cables to be used shall be copper, insulation required will depend on its specific use to wit:
sho. sho.
Lightings - THHN Type
Sa
CKT CKT
b b
6 11 Convenience outlets - THHN Type
ref ref
Sab REF
Power (ACU's, Motors, Heaters, etc)- THHN Type
Service Entrance - THHN Type
b b PLANTERS PLANTERS Service Lateral - THHN Type
a
c
Service Service Drop - THW Type
Sabc b b CKT
Sa
MPB 4 MPB
- The minimum size of wire and conduit to be used shall be:
BEDROOM 2 BEDROOM 2
a
lav. lav. Lightings - 2.0 mm2, 15 mm dia. Pipe
CKT Sabc
1
b
ACU
C.O. - 3.5 mm2, 15 mm dia. Pipe
wc a b wc
T&B T&B
closet
closet
CKT
CKT
7
8
- Type of wiring shall be in rigid PVC pipe in concrete slab and floor as required.
closet
closet
LIVING ROOM LIVING ROOM
b b
sho.
fd
a ACU
sho.
fd
- Panel boards shall be located on load center to minimize length of home runs
a
BEDROOM 1 BEDROOM 1 - All circuit breakers shall be Inverse Time Type, and of required Interrupting Capacity Rating as designed,and
b
of Residential Type Category
- Grounding system shall be implemented as required. All metal parts of all equipment shall be bonded and
c
grounded in accordance with Article 2.50 of the PEC. Ground resistance shall be tested and should passed
CKT
WP 5
2 PLANTERS 2 PLANTERS
Motor loads in general, if any
a
1 1
Note: Results shall passed the required insulation value in MEGA OHMS
UP UP - Installation of Standby Generator shall be accompanied with Transfer Switches to supply power in case of
blackouts is optional.If in case, its rating in kVA shall be based on the emergency power requirement of the
ROOF LINE
b b installations or as required. Shifting of power shall be done manually or automatic or as required.
- Scheduled (post) electrical inspection and testing is highly recommended.
- Breakers shall be bolt-on Type
1 GROUND FLOOR LIGHTING LAYOUT 2 GROUND FLOOR POWER LAYOUT 3 ELECTRICAL NOTES
E1 SCALE 1:1OO Mts. E1 SCALE 1:1OO Mts. E 1
ARCHITECT PROFESSIONAL ELECTRICAL ENGINEER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
2 PLANTERS 2 PLANTERS
3 3 3. THE DRAWINGS SHOW THE GENERAL ARRANGEMENT OF ALL THE PIPINGS, HOWEVER, WHERE LOCAL OR ACTUAL CONDITIONS AT THE JOB
4 4
CO SITE
NECESSITATE A DEVIATION OR ARRANGEMENT FOR THE ENGINEER/ARCHITECTS APPROVAL..
DN DN
4. THE PLUMBING SYSTEM SHALL BE LAID OUT AND INSTALLED CONSISTENTLY THROUGHOUT WITH THE GIVEN SLOPES IN THE PLANS AND
BEDROOM 4 BEDROOM 4
CB
DS
SHALL CONFORM
TO THE ACTUAL LOCATION DEPTH AND INVERT ELEVATION OF EXISTING PIPES.
range 1/2 Ø PPR PIPE range
5. ALL ABOVE GROUND STORM DRAIN AND UNDER GROUND PASSING UNDER SLAB SHALL BE POLYVINYL CHLORIDE (PVC).
BEDROOM 3 BEDROOM 3
sink
closet
sink
closet
6. ALL SANITARY SEWER LINES SHALL BE POLYVINYL CHLORIDE (PVC) PIPES AND FITTINGS SCH. 40. THE SLOPE FOR HORIZONTAL SEWER
LINES SHALL
KITCHEN island DINNING KITCHEN island DINNING
fd fd
BE IN 1% FOR Ø100 mm PIPES AND ABOVE AND 2% FOR Ø75 mm AND BELOW.
T&B T&B
closet closet
7. ALL VENT PIPING SHALL BE POLYVINYL CHLORIDE (PVC) SCH. 40 AS APPROVED AS BY THE ENGINEER/ARCHITECT. ALL PLUMBING
wc wc
lav.
sho.
lav.
sho.
FIXTURES SHALL
1/2 Ø PPR PIPE
BE INDIVIDUALLY VENTED UNLESS OTHERWISE INDICATED THE VENT BRANCH OF THE SEWER LINES SHALL BE TAKEN AT A VERTICAL
1/2 Ø PPR PIPE
ref ref ANGLE OR FROM THE TOP OF THE HORIZONTAL.
8. ALL PLUMBING WORKS SHALL BE DONE UNDER THE DIRECT SUPERVISION OF A SANITARY ENGINEER OR A MASTER PLUMBER.
PLANTERS PLANTERS
9. ALL CHANGES IN DIRECTION SHALL BE MADE IN APPROPRIATE USE OF 45° WYE LONG SWEEP QUARTER BEND.
BEDROOM 2 BEDROOM 2
10. ALL CHANGES IN DIRECTION SHALL BE MADE IN APPROPRIATE USE OF 45° WYES, LONG SWEEP QUARTER BENDS, HALF WYES EXCEPT
lav. lav.
THAT SINGLE
wc wc
SANITARY TEES MAY BE TO OTHER USED ON VERTICAL ATTACKS, AND SHORT QUARTER BENDS MAY BE USED IN SOIL AND WASTE LINES
T&B T&B
closet
closet
WHERE THE
LIVING ROOM LIVING ROOM
closet
closet
CHANGE IN THE DIRECTION OF FLOW IS FROM THE HORIZONTAL TO THE VERTICAL. TEES AND CROSSES MAY BE USED IN VENT PIPES.
sho. sho.
fd fd
DS
GVWMCV GV
M
BEDROOM 1 CB BEDROOM 1 11. NO DOUBLE HUB, DOUBLE T BRANCH SHALL BE USED ON HORIZONTAL SOIL OR WASTE LINE, THE DRILLING AND TAPPING OF HOUSE DRAIN,
1/2 Ø PPR PIPE
FROM WATER
SOURCE
SOIL WASTE
OR VENT PIPES AND THE USE OF SADDLE HUBS AND BEND ARE PROHIBITED.
2 PLANTERS 2 PLANTERS 14. VERIFY AND DETERMINE, SUBJECT TO THE ENGINEER/ARCHITECT'S APPROVAL THE BEST LOCATION AT WHICH TO CONNECT THE
1 1 DRAINAGE SYSTEM
TO EXISTING STREET DRAIN OR TO OTHER CONVENIENT ACCEPTABLE APPROVED WATER DISCHARGE RECEIVER IN ALL CASES, PROVIDE
UP UP STORM
DRAINAGE LINES WITH 2% MINIMUM SLOPE TOWARDS DIRECTIONS OF DRAIN.
LAV LAVATORY
1.00m
4 MANHOLE MANHOLE MANHOLE
M
OO
DR
BE clo
set 4
fd
OM
RO
B sh
o. BE
D
clo
set
fd
1OOmm Ø PVC
INLET PIPE
1OOmm Ø
PVC TEE 1OOmm Ø PVC
OUTLET PIPE
WC WATER CLOSET
T& wc
lav
.
B o.
sh
RS T&
TE wc PLAN
NK 3 AN
SE
PT
IC
TA
ED
R OO
M PL lav
.
TE
R S FD FLOOR DRAIN
B E K 3 AN
PIP TA
N
OM PL
PR IC CO RO 1OOmm Ø thick Concrete 1OOmm x 5OOmm x 5OOmm 15Omm CHB WALL w/ 12mm Ø
ØP PT D Slab w/ 12mm reinforcement Concrete Manhole w/ 3-1Omm Vertical Bars S.P @ 6OOmm
1/2 SE BE bars S.P. @ 125mm O.C. BW Bars B.W. & Bar Handel O.C & 12mm Ø Horizontal BarS
S.P @ every 3 layer of CHB
CO CO CO CO
t
se GV
GV GATE VALVE
E
PIP clo
RS PP
R 1
TE Ø OO
M
AN 1/2 R et
3OOmm Air Space
PL G BE
D
S clo
s
CB
1OOmm Ø PVC
AL 1 DS
1 IN ER M
INLET PIPE
NN clo
AN NT O
DI RO
2 se
t C A
PL
3
D
4
GE NG BE
INA CV
CV
DN
DR
A
1
2
3 DI
NN
I clo
set
1OOmm Ø
PVC Tee CHECK VALVE
4
ge TO
ran
DN
d
isl
an
OM ge
EN ran DIGESTIVE
2.00m
RO LEACHING LEACHING
sin
k
KIT
CH
LIV
IN
G
DS
CB an
d
M CHAMBER WELL 1 WELL 2
M M WATER METER
isl
ref EN OO
RS
H GR
H ITC
.
lav B RC k IN
T& TE sin K LIV
wc fd PO AN ref
2 PL S
E . H
o. B ER
M lav
RC
FAU FAUCET
PIP clo sh
R
PP R OO se
t T& PO NT
wc A
ED fd 16mm thick
PL
Ø 4
1/2 B 3 CONCRETE
2 2 o.
PLASTERING
1 OM clo sh
RO
se
t
D 4
E BE 3
2 CO
PIP
CO
1
CLEANOUT
0.20m
PR UP
ØP
1/2
E
AG
G AR UP
GRAVEL FILL
GE
CV
GV
DS
CB
GA
RA 0.40m CB CB CATCH BASIN
WM
GV M
TE
WA CE
OM UR
R
SECTION DS DOWNSPOUT
FR SO
4 WATER LINE ISOMETRIC VIEW 5 SEWER LINE ISOMETRIC VIEW 6 SEPTIC TANK DETAILS 7 PLUMBING NOTES
P 1 SCALE 1:1OO Mts. P 1 SCALE 1:1OO Mts. P 1 SCALE 1:1OO Mts. P 1 SCALE 1:1OO Mts.
ARCHITECT MASTER PLUMBER PROJECT TITLE & LOCATION APPROVED BY: DATE REVISION SHEET CONTENTS SHEET NO.
WATER LINE LAYOUT