Shinso Pile Design

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 144

Design Condition

1 Shinso Pile Type - Circular Shaft

2 Shinso Pile Dimension - 7.2 m (D) x 21 m (H)

3 Soil condition

Earth pressure cofficient : Cofficient of Earth pressure at rest (K 0) is used

Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge

W = 10 kN/m2

Pressure due to surcharge = 5 kN/m2

5 Allowable Stresses

Liner Plate sca = 180 N/mm2

Steel Material ssa = 210 N/mm2

6 Young's modulus E = 2.00E+08 kN/m2

7 Groundwater level depth H w = 15 m

8 Shinso Pile Radius = 3.6 m Item Liner Beam

9 Unit volume weight gw = 10 kN/m2 I 0.00000141 1.21E-04

10 Cofficient of Earth Pressure K0 = 0.5 Z 0.000046 0.00037112300308

11 Saturated density of soil gt = 20 kN/m2 A 0.3976 0.8112

12 Submerged density of soil g' = 10 kN/m2

13 Density of Water gwater = 10 kN/m2 Ring Position

14 Dia of the Shaft = 3.6 m Spacing Y coordinate


0 1
Surcharge Pressure due to Pressure due Net Side 6 1
Depth Ring Spacing
Pressure Soil to water Pressure 9.5 1
Case
Psoil +
From to Psurchage Psoil Pwater d No. of Rings 12.5 1
Pwater+Psurcharge
1 0 6.5 5 65 0 70 6.5 1 6.5 14.5 1
2 6.5 10.5 5 105 0 110 4 1 4 16.5 1
3 10.5 13.5 5 135 0 140 3 1 3 18.5 1
4 13.5 16 5 150 10 165 2.5 1 2.5 20 1
5 16 20 5 150 50 205 2 2 4 21.5 1
6 20 21 5 150 60 215 1 1 1 23 1
26 1

Parameter Values Case 1 Case 2 Case 3 Case 4 Case 5 Case 6 27 1

Inertia of Liner IL (m^4/m ) 0.00000141 0.00000141 0.00000141 0.00000141 0.00000141 0.00000141 28 1 Case7

Sectional modulus of Liner ZL (m^3/m) 0.000046 0.000046 0.000046 0.000046 0.000046 0.000046 29 1 1.4E-06

Area of Liner AL (m^2/m) 0.3976 0.3976 0.3976 0.3976 0.3976 0.3976 30 1 4.6E-05

Spacing of H beam d (m) 6.5 4 3 2.5 2 1 31 1 0.3976

Inertia of H Beam IH (m^4/m ) 1.86E-05 3.02E-05 4.02E-05 4.82E-05 6.03E-05 1.21E-04 32 1

Sectional modulus of H beam ZH (m^3/m) 5.7095847E-05 9.278075077E-05 0.00012370767 0.0001484492 0.0001855615 0.000371123 33 1

Area of H Beam AH (m^2/m) 0.1248 0.2028 0.2704 0.32448 0.4056 0.8112 34 1

Gross Area AL + AH (m^2/m) 0.5224 0.6004 0.668 0.72208 0.8032 1.2088 Total
20

Gross Inertia I = IL + IH (m^4/m) 2.00E-05 3.16E-05 4.16E-05 4.97E-05 6.17E-05 1.22E-04

Water Pressure Ph (kN/m^2) 70 110 140 165 205 215

Allowable Buckling load Qa = 2 x E x I / r^3 kN/m^2 171.18 270.61 356.78 425.72 529.13 1046.17

O.K. O.K. O.K. O.K. O.K. O.K.

Axial froce N= Ph x r (kN/m) 252 396 504 594 738 774

Angular Distortion d0 ( 1 % of Pile radius ) m 0.036 0.036 0.036 0.036 0.036 0.036

Marginal buckling load Qk = 3 x E x I / r^3 (kN/m^2) 256.77 405.91 535.17 638.58 793.69 1569.25

Maximum Moment Mmax = do x Ph x r /(1-Ph/ Qk) 12.47 19.56 24.57 28.83 35.82 32.29

Moment Cofficient for Liner IL/ (IL+IH) 0.071 0.045 0.034 0.028 0.023 0.012

Axial coffiient for Liner AL/(AL+ AH) 0.761 0.662 0.595 0.551 0.495 0.329

Moment Shared by Liner ML (kN.m) 0.88537 0.8802 0.83538 0.80724 0.82386 0.38748

Moment shared by H beam MH (kN.m) 11.58463 18.6798 23.73462 28.02276 34.99614 31.90252

Axial froce shared by liner NL = N x AL/(AL+AH) (kN/m) 191.77 262.15 299.88 327.29 365.31 254.65

Stress in Liner ML/ZL + NL/AL 19.72949 19.79411 18.91466 18.37186 18.82879 9.06395

OK OK OK OK OK OK

Axial force shared by H beam NH 60.23 133.85 204.12 266.71 372.69 519.35

Stress in H beam MH/ZH + NH /AH 203.38056 201.99272 192.61542 189.59199 189.51477 86.60234

OK OK OK OK OK OK
CALCULATION OF SECTIONAL PROPERTIES

200

300 276

200

Overall Depth of section = 300 mm


Top Plate Size = 200 x 12
Web Plate Size = 276 x 12
Bottom plate size = 200 x 12

SR. ELEMENT Ai(mm2) Ye (mm) AYi AY2s Ixx (self) It =


1 Top Flange 2400 6 14400 8.6E+04 2.9E+04 1.2E+05
5 Web 3312 150 496800 7.5E+07 2.1E+07 9.6E+07
8 Bottom Plate 2400 294 705600 2.1E+08 2.880E+04 2.1E+08
S 8.1E+03 1.2E+06 3.0E+08

Therefore distance of N.A. from top fibre

= SAyc 1.2E+06
=
SA 8112.00
= 150.00 mm
M.I. About N. A. = 3.0E+08 - 8112 x ( 1.50E+02 )^2
Ixx = 1.21E+08 mm4
yb = D - yt
= 475 - 150.00
= 325.00 mm

Zb = Ixx/Yb = 1.2E+08 / 325.00


= 3.7E+05 mm3
Zt = Ixx/Yt = 1.2E+08 / 150.00
= 8.0E+05 mm3
SHINSO SUMMARY
SHINSO DETAILS

Geotech Findings

Shinso
Sr. Old Pier Substructure BH`s
Pier No Chainage length as Approved
No. ID Type Applicable Shinso
per Shinso
dia, m
drawing, length, m
m Ground
Water Ground Case
Table

1 PA265 500P11 500+460 Column 500+460 7 28.0 34.0 12.3 Not Satisfied

2 PA193 497P04 497+123 Column 497+123 7 29.5 33.5 7.0 Satisfied

3 PA334 503P06 503+192 Column 503+192 7 29.5 30.0 15.0 Satisfied

4 PA220 498P07 498+240 Column 498+240 7 29.5 2.4 Not Satisfied

5 PA297 501P19 501+750 Column 501+750 7 29.5 29.5 15.0 Not Satisfied

6 PA326 502P23 502+883 Column 502+883 7 29.5 29.5 15.0 Not Satisfied

7 PA335 503P07 503+237 Column 503+237 7 29.5 16.0 Not Satisfied

8 PA308 502P05 502+179 Column 502+179 7 29.5 18.2 Not Satisfied

9 PA252 499P14 499+570 Column 499+570 7 28.0 20.5 Not Satisfied

10 PA282 501P04 501+135 Column 501+135 7 28.0 16.5 Not Satisfied

11 PA283 501P05 501+180 Column 501+180 7 28.0 16.0 Not Satisfied

12 PA285 501P07 501+270 Column 501+270 7 28.0 16.5 Not Satisfied

13 PA286 501P08 501+315 Column 501+315 7 28.0 17.3 Not Satisfied

14 PA242 499P04 499+135 Column 499+135 7 28.0 23.0 Not Satisfied

15 PA243 499P05 499+180 Column 499+180 7 28.0 21.0 Not Satisfied

16 PA296 501P18 501+710 Column 501+710 7 28.0 16.2 Not Satisfied

17 PA299 501P21 501+819 Column 501+819 7 28.0 15.0 Not Satisfied

18 PA300 501P22 501+864 Column 501+864 7 28.0 16.0 Not Satisfied

19 PA356 504P03 504+100 Column 504+100 7 28.0 28.0 16.5 Satisfied

20 PA357 504P04 504+136 Column 504+136 7 28.0 17.0 Not Satisfied

21 PA223 498P10 498+365 Cross Over 498+365 7 23.0 2.0 Not Satisfied

22 PA224 498P11 498+405 Cross Over 498+405 7 23.0 18.5 Not Satisfied

23 PA340 503P12 503+446 Column 503+446 7 23.0 18.5 Not Satisfied

24 PA152 495P13 495+486 Column 495+486 7 22.5 6.2 Not Satisfied


25 PA153 495P14 495+531 Column 495+531 7 22.5 4.8 Not Satisfied

26 PA221 498P08 498+285 Cross Over 498+285 7 22.0 2.0 Not Satisfied

27 PA247 499P09 499+345 Column 499+345 7 22.0 20.5 Not Satisfied


SHINSO SUMMARY
SHINSO DETAILS

Geotech Findings

Shinso
Sr. Old Pier Substructure BH`s
Pier No Chainage length as Approved
No. ID Type Applicable Shinso
per Shinso
dia, m
drawing, length, m
m Ground
Water Ground Case
Table

28 PA248 499P10 499+405 Column 499+405 7 22.0 19.5 Not Satisfied

29 PA301 501P23 501+909 Column 501+909 7 22.0 17.5 Not Satisfied

30 PA23 490P10 490+372 Column 490+372 7 21.0 3.0 Not Satisfied

31 PA2 489P13 489+507 Column 489+507 7 21.0 14.4 Not Satisfied

32 PA302 501P24 501+949 Column 501+949 7 21.0 15.0 Not Satisfied

33 PA338 503P10 503+367 Column 503+367 7 21.0 18.0 Not Satisfied

34 PA339 503P11 503+407 Column 503+407 7 21.0 19.5 Not Satisfied

35 PA344 503P16 503+606 Column 503+606 7 19.0 14.2 Not Satisfied

36 PA345 503P17 503+646 Column 503+646 7 19.0 10.4 Not Satisfied

37 PA346 503P18 503+686 Column 503+686 7 18.5 18.5 Not Satisfied

38 PA184 496P19 496+757 Column 496+757 7 18.5 13.1 Not Satisfied


39 PA185 496P20 496+791 Column 496+791 7 18.5 16.0 Not Satisfied
40 PA186 496P21 496+836 Column 496+836 7 18.5 15.5 Not Satisfied

41 PA187 496P22 496+881 Column 496+881 7 18.5 19.0 Not Satisfied

42 PA199 497P10 497+393 Column 497+393 7 18.5 16.0 Not Satisfied

43 PA133 494P19 494+713 Column 494+713 7 18.0 15.5 Not Satisfied

44 PA134 494P20 494+783 Column 494+783 7 18.0 16.2 Not Satisfied

45 PA291 501P13 501+505 Cross Over 501+505 7 17.0 16.2 Not Satisfied

46 PA292 501P14 501+550 Cross Over 501+550 7 17.0 15.5 Not Satisfied

47 PA6 489P17 489+667 Column 489+667 7 14.0 13.0 Not Satisfied

48 PA298 501P20 501+786 Column 501+786 7 13.0 17.5 Not Satisfied


1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 34 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 12.3 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 120 0 125 3
2 12 17 0.5 20 10 5 136.5 47 188.5 2.5
3 17 21 0.5 20 10 5 136.5 87 228.5 2
4 21 28.5 0.5 20 10 5 136.5 162 303.5 1.5
5 28.5 34 0.5 20 10 5 136.5 217 358.5 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 125 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 125 kN/m2
Mmax = 19.6 kN.m/m
N = 450 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 19.6
= 5.49E-01 kN.m/m
N = 450 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 263.14 kN/m
NL ML
s = AL + ZL

= 263.14 + 5.49E+05
4.416 52300
= 59.59 + 10.49
= 70.08 < sca = 150 N/mm2

MH = Mmax - ML
= 19.6 - 0.55
= 19.05 kN.m/m

NH = N - NL
= 450 - 263.14
= 186.86 kN/m
NH + MH
sH = AH ZH
= 59.59 + 52.46
= 112.05 < sa = 210 N/mm^2

Case 2 Depth 12 m to 17 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 188.5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 188.5 kN/m2
Mmax = 31.28 kN.m/m
N = 678.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 31.28
= 7.33E-01 kN.m/m
N = 678.6 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 366.38 kN/m

NL ML
s = AL + ZL

= 366.38 + 7.33E+05
4.416 52300
= 82.97 + 14.02
= 96.99 < sca = 150 N/mm2

MH = Mmax - ML
= 31.28 - 0.73
= 30.55 kN.m/m

NH = N - NL
= 678.6 - 366.38
= 312.22 kN/m
NH + MH
sH = AH ZH
= 82.97 + 70.11
= 153.08 < sa = 210 N/mm^2
Case 3 Depth 17 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 228.5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 228.5 kN/m2
Mmax = 37.65 kN.m/m
N = 822.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 37.65
= 7.10E-01 kN.m/m
N = 822.6 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 398.31 kN/m

NL ML
s = AL + ZL

= 398.31 + 7.10E+05
4.416 52300
= 90.2 + 13.57
= 103.77 < sca = 150 N/mm2

MH = Mmax - ML
= 37.65 - 0.71
= 36.94 kN.m/m

NH = N - NL
= 822.6 - 398.31
= 424.29 kN/m
NH + MH
sH = AH ZH
= 90.2 + 67.82
= 158.02 < sa = 210 N/mm^2

Case 4 Depth 21 m to 28.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 303.5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 303.5 kN/m2
Mmax = 50.02 kN.m/m
N = 1092.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 50.02
= 7.10E-01 kN.m/m
N = 1092.6 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 451.43 kN/m

NL ML
s = AL + ZL

= 451.43 + 7.10E+05
4.416 52300
= 102.23 + 13.58
= 115.81 < sca = 150 N/mm2

MH = Mmax - ML
= 50.02 - 0.71
= 49.31 kN.m/m

NH = N - NL
= 1092.6 - 451.43
= 641.17 kN/m
NH + MH
sH = AH ZH
= 102.23 + 67.9
= 170.13 < sa = 210 N/mm^2

Case 5 Depth 28.5 m to 34 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 217 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 217 kN/m2
Mmax = 31.33 kN.m/m
N = 781.2 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 31.33
= 2.98E-01 kN.m/m
N = 781.2 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 249.55 kN/m

NL ML
s = AL + ZL

= 249.55 + 2.98E+05
4.416 52300
= 56.51 + 5.7
= 62.21 < sca = 150 N/mm2

MH = Mmax - ML
= 31.33 - 0.3
= 31.03 kN.m/m

NH = N - NL
= 781.2 - 249.55
= 531.65 kN/m
NH + MH
sH = AH ZH
= 56.51 + 28.48
= 84.99 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 33.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 7m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 110 80 195 3
2 15 20 0.5 20 10 5 110 130 245 2.5
3 20 24 0.5 20 10 5 110 170 285 2
4 24 31.5 0.5 20 10 5 110 245 360 1.5
5 31.5 33.5 0.5 20 10 5 110 265 380 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 195 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 195 kN/m2
Mmax = 34.65 kN.m/m
N = 702 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 34.65
= 9.70E-01 kN.m/m
N = 702 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 410.49 kN/m
NL ML
s = AL + ZL

= 410.49 + 9.70E+05
4.416 52300
= 92.96 + 18.55
= 111.51 < sca = 150 N/mm2

MH = Mmax - ML
= 34.65 - 0.97
= 33.68 kN.m/m

NH = N - NL
= 702 - 410.49
= 291.51 kN/m
NH + MH
sH = AH ZH
= 92.96 + 92.75
= 185.71 < sa = 210 N/mm^2

Case 2 Depth 15 m to 20 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 245 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 245 kN/m2
Mmax = 44.39 kN.m/m
N = 882 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 44.39
= 1.04E+00 kN.m/m
N = 882 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 476.2 kN/m

NL ML
s = AL + ZL

= 476.2 + 1.04E+06
4.416 52300
= 107.84 + 19.9
= 127.74 < sca = 150 N/mm2

MH = Mmax - ML
= 44.39 - 1.04
= 43.35 kN.m/m

NH = N - NL
= 882 - 476.2
= 405.8 kN/m
NH + MH
sH = AH ZH
= 107.83 + 99.49
= 207.32 < sa = 210 N/mm^2
Case 3 Depth 20 m to 24 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 285 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 285 kN/m2
Mmax = 50.33 kN.m/m
N = 1026 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 50.33
= 9.48E-01 kN.m/m
N = 1026 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 496.8 kN/m

NL ML
s = AL + ZL

= 496.8 + 9.48E+05
4.416 52300
= 112.5 + 18.13
= 130.63 < sca = 150 N/mm2

MH = Mmax - ML
= 50.33 - 0.95
= 49.38 kN.m/m

NH = N - NL
= 1026 - 496.8
= 529.2 kN/m
NH + MH
sH = AH ZH
= 112.5 + 90.66
= 203.16 < sa = 210 N/mm^2

Case 4 Depth 24 m to 31.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 360 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 360 kN/m2
Mmax = 62.49 kN.m/m
N = 1296 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 62.49
= 8.87E-01 kN.m/m
N = 1296 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 535.47 kN/m

NL ML
s = AL + ZL

= 535.47 + 8.87E+05
4.416 52300
= 121.26 + 16.97
= 138.23 < sca = 150 N/mm2

MH = Mmax - ML
= 62.49 - 0.89
= 61.6 kN.m/m

NH = N - NL
= 1296 - 535.47
= 760.53 kN/m
NH + MH
sH = AH ZH
= 121.26 + 84.82
= 206.08 < sa = 210 N/mm^2

Case 5 Depth 31.5 m to 33.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 265 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 265 kN/m2
Mmax = 39.25 kN.m/m
N = 954 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 39.25
= 3.73E-01 kN.m/m
N = 954 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 304.75 kN/m

NL ML
s = AL + ZL

= 304.75 + 3.73E+05
4.416 52300
= 69.01 + 7.14
= 76.15 < sca = 150 N/mm2

MH = Mmax - ML
= 39.25 - 0.37
= 38.88 kN.m/m

NH = N - NL
= 954 - 304.75
= 649.25 kN/m
NH + MH
sH = AH ZH
= 69.01 + 35.69
= 104.7 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 30 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 30 185 3
3 18 23 0.5 20 10 5 150 80 235 2.5
4 23 29 0.5 20 10 5 150 140 295 1.5
5 29 30 0.5 20 10 5 150 150 305 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 185 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 185 kN/m2
Mmax = 32.26 kN.m/m
N = 666 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 32.26
= 9.03E-01 kN.m/m
N = 666 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 389.44 kN/m

NL ML
s = AL + ZL

= 389.44 + 9.03E+05
4.416 52300
= 88.19 + 17.27
= 105.46 < sca = 150 N/mm2

MH = Mmax - ML
= 32.26 - 0.9
= 31.36 kN.m/m

NH = N - NL
= 666 - 389.44
= 276.56 kN/m
NH + MH
sH = AH ZH
= 88.19 + 86.36
= 174.55 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 235 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 235 kN/m2
Mmax = 41.89 kN.m/m
N = 846 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 41.89
= 9.82E-01 kN.m/m
N = 846 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 456.76 kN/m

NL ML
s = AL + ZL

= 456.76 + 9.82E+05
4.416 52300
= 103.43 + 18.78
= 122.21 < sca = 150 N/mm2

MH = Mmax - ML
= 41.89 - 0.98
= 40.91 kN.m/m

NH = N - NL
= 846 - 456.76
= 389.24 kN/m
NH + MH
sH = AH ZH
= 103.43 + 93.89
= 197.32 < sa = 210 N/mm^2

Case 4 Depth 23 m to 29 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 305 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 305 kN/m2
Mmax = 50.33 kN.m/m
N = 1098 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 50.33
= 7.15E-01 kN.m/m
N = 1098 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 453.66 kN/m

NL ML
s = AL + ZL

= 453.66 + 7.15E+05
4.416 52300
= 102.73 + 13.67
= 116.4 < sca = 150 N/mm2

MH = Mmax - ML
= 50.33 - 0.71
= 49.62 kN.m/m

NH = N - NL
= 1098 - 453.66
= 644.34 kN/m
NH + MH
sH = AH ZH
= 102.73 + 68.33
= 171.06 < sa = 210 N/mm^2

Case 5 Depth 29 m to 30 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 305 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 305 kN/m2
Mmax = 46.16 kN.m/m
N = 1098 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 46.16
= 4.39E-01 kN.m/m
N = 1098 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 350.75 kN/m

NL ML
s = AL + ZL

= 350.75 + 4.39E+05
4.416 52300
= 79.43 + 8.4
= 87.83 < sca = 150 N/mm2

MH = Mmax - ML
= 46.16 - 0.44
= 45.72 kN.m/m

NH = N - NL
= 1098 - 350.75
= 747.25 kN/m
NH + MH
sH = AH ZH
= 79.43 + 41.97
= 121.4 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 29.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 2.4 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 72 96 173 3
2 12 17 0.5 20 10 5 87 146 238 2.5
3 17 21 0.5 20 10 5 87 186 278 2
4 21 28.5 0.5 20 10 5 87 261 353 1.5
5 28.5 29.5 0.5 20 10 5 87 271 363 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 173 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 173 kN/m2
Mmax = 29.5 kN.m/m
N = 622.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.5
= 8.26E-01 kN.m/m
N = 622.8 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 364.18 kN/m
NL ML
s = AL + ZL

= 364.18 + 8.26E+05
4.416 52300
= 82.47 + 15.8
= 98.27 < sca = 150 N/mm2

MH = Mmax - ML
= 29.5 - 0.83
= 28.67 kN.m/m

NH = N - NL
= 622.8 - 364.18
= 258.62 kN/m
NH + MH
sH = AH ZH
= 82.47 + 78.96
= 161.43 < sa = 210 N/mm^2

Case 2 Depth 12 m to 17 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 238 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 238 kN/m2
Mmax = 42.63 kN.m/m
N = 856.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 42.63
= 9.99E-01 kN.m/m
N = 856.8 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 462.59 kN/m

NL ML
s = AL + ZL

= 462.59 + 9.99E+05
4.416 52300
= 104.75 + 19.11
= 123.86 < sca = 150 N/mm2

MH = Mmax - ML
= 42.63 - 1
= 41.63 kN.m/m

NH = N - NL
= 856.8 - 462.59
= 394.21 kN/m
NH + MH
sH = AH ZH
= 104.75 + 95.54
= 200.29 < sa = 210 N/mm^2
Case 3 Depth 17 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 278 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 278 kN/m2
Mmax = 48.66 kN.m/m
N = 1000.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 48.66
= 9.17E-01 kN.m/m
N = 1000.8 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 484.6 kN/m

NL ML
s = AL + ZL

= 484.6 + 9.17E+05
4.416 52300
= 109.74 + 17.53
= 127.27 < sca = 150 N/mm2

MH = Mmax - ML
= 48.66 - 0.92
= 47.74 kN.m/m

NH = N - NL
= 1000.8 - 484.6
= 516.2 kN/m
NH + MH
sH = AH ZH
= 109.74 + 87.65
= 197.39 < sa = 210 N/mm^2

Case 4 Depth 21 m to 28.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 353 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 353 kN/m2
Mmax = 60.87 kN.m/m
N = 1270.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 60.87
= 8.64E-01 kN.m/m
N = 1270.8 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 525.06 kN/m

NL ML
s = AL + ZL

= 525.06 + 8.64E+05
4.416 52300
= 118.9 + 16.53
= 135.43 < sca = 150 N/mm2

MH = Mmax - ML
= 60.87 - 0.86
= 60.01 kN.m/m

NH = N - NL
= 1270.8 - 525.06
= 745.74 kN/m
NH + MH
sH = AH ZH
= 118.9 + 82.63
= 201.53 < sa = 210 N/mm^2

Case 5 Depth 28.5 m to 29.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 271 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 271 kN/m2
Mmax = 40.26 kN.m/m
N = 975.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 40.26
= 3.83E-01 kN.m/m
N = 975.6 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 311.65 kN/m

NL ML
s = AL + ZL

= 311.65 + 3.83E+05
4.416 52300
= 70.57 + 7.32
= 77.89 < sca = 150 N/mm2

MH = Mmax - ML
= 40.26 - 0.38
= 39.88 kN.m/m

NH = N - NL
= 975.6 - 311.65
= 663.95 kN/m
NH + MH
sH = AH ZH
= 70.57 + 36.61
= 107.18 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 29.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 30 185 3
3 18 23 0.5 20 10 5 150 80 235 2.5
4 23 29 0.5 20 10 5 150 140 295 1.5
5 29 29.5 0.5 20 10 5 150 145 300 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 185 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 185 kN/m2
Mmax = 32.26 kN.m/m
N = 666 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 32.26
= 9.03E-01 kN.m/m
N = 666 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 389.44 kN/m

NL ML
s = AL + ZL

= 389.44 + 9.03E+05
4.416 52300
= 88.19 + 17.27
= 105.46 < sca = 150 N/mm2

MH = Mmax - ML
= 32.26 - 0.9
= 31.36 kN.m/m

NH = N - NL
= 666 - 389.44
= 276.56 kN/m
NH + MH
sH = AH ZH
= 88.19 + 86.36
= 174.55 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 235 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 235 kN/m2
Mmax = 41.89 kN.m/m
N = 846 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 41.89
= 9.82E-01 kN.m/m
N = 846 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 456.76 kN/m

NL ML
s = AL + ZL

= 456.76 + 9.82E+05
4.416 52300
= 103.43 + 18.78
= 122.21 < sca = 150 N/mm2

MH = Mmax - ML
= 41.89 - 0.98
= 40.91 kN.m/m

NH = N - NL
= 846 - 456.76
= 389.24 kN/m
NH + MH
sH = AH ZH
= 103.43 + 93.89
= 197.32 < sa = 210 N/mm^2

Case 4 Depth 23 m to 29 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 300 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 300 kN/m2
Mmax = 49.28 kN.m/m
N = 1080 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 49.28
= 7.00E-01 kN.m/m
N = 1080 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 446.23 kN/m

NL ML
s = AL + ZL

= 446.23 + 7.00E+05
4.416 52300
= 101.05 + 13.38
= 114.43 < sca = 150 N/mm2

MH = Mmax - ML
= 49.28 - 0.7
= 48.58 kN.m/m

NH = N - NL
= 1080 - 446.23
= 633.77 kN/m
NH + MH
sH = AH ZH
= 101.05 + 66.89
= 167.94 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 28 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 20 175 3
3 18 23 0.5 20 10 5 150 70 225 2.5
4 23 28 0.5 20 10 5 150 120 275 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 175 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 175 kN/m2
Mmax = 29.95 kN.m/m
N = 630 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.95
= 8.39E-01 kN.m/m
N = 630 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 368.39 kN/m

NL ML
s = AL + ZL

= 368.39 + 8.39E+05
4.416 52300
= 83.42 + 16.04
= 99.46 < sca = 150 N/mm2

MH = Mmax - ML
= 29.95 - 0.84
= 29.11 kN.m/m

NH = N - NL
= 630 - 368.39
= 261.61 kN/m
NH + MH
sH = AH ZH
= 83.42 + 80.17
= 163.59 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 225 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 225 kN/m2
Mmax = 39.48 kN.m/m
N = 810 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 39.48
= 9.26E-01 kN.m/m
N = 810 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 437.32 kN/m

NL ML
s = AL + ZL

= 437.32 + 9.26E+05
4.416 52300
= 99.03 + 17.7
= 116.73 < sca = 150 N/mm2

MH = Mmax - ML
= 39.48 - 0.93
= 38.55 kN.m/m

NH = N - NL
= 810 - 437.32
= 372.68 kN/m
NH + MH
sH = AH ZH
= 99.03 + 88.47
= 187.5 < sa = 210 N/mm^2

Case 4 Depth 23 m to 28 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 275 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 275 kN/m2
Mmax = 44.19 kN.m/m
N = 990 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 44.19
= 6.28E-01 kN.m/m
N = 990 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 409.04 kN/m

NL ML
s = AL + ZL

= 409.04 + 6.28E+05
4.416 52300
= 92.63 + 12
= 104.63 < sca = 150 N/mm2

MH = Mmax - ML
= 44.19 - 0.63
= 43.56 kN.m/m

NH = N - NL
= 990 - 409.04
= 580.96 kN/m
NH + MH
sH = AH ZH
= 92.63 + 59.98
= 152.61 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 23 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 17.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 21 0.5 20 10 5 150 35 190 3
3 21 23 0.5 20 10 5 150 55 210 2

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 190 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 190 kN/m2
Mmax = 33.44 kN.m/m
N = 684 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 33.44
= 9.36E-01 kN.m/m
N = 684 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 399.97 kN/m

NL ML
s = AL + ZL

= 399.97 + 9.36E+05
4.416 52300
= 90.57 + 17.9
= 108.47 < sca = 150 N/mm2

MH = Mmax - ML
= 33.44 - 0.94
= 32.5 kN.m/m

NH = N - NL
= 684 - 399.97
= 284.03 kN/m
NH + MH
sH = AH ZH
= 90.57 + 89.5
= 180.07 < sa = 210 N/mm^2
Case 3 Depth 21 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 210 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 210 kN/m2
Mmax = 33.86 kN.m/m
N = 756 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 33.86
= 6.38E-01 kN.m/m
N = 756 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 366.06 kN/m

NL ML
s = AL + ZL

= 366.06 + 6.38E+05
4.416 52300
= 82.89 + 12.2
= 95.09 < sca = 150 N/mm2

MH = Mmax - ML
= 33.86 - 0.64
= 33.22 kN.m/m

NH = N - NL
= 756 - 366.06
= 389.94 kN/m
NH + MH
sH = AH ZH
= 82.9 + 60.99
= 143.89 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 23 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 2m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 70 100 175 3
2 12 17 0.5 20 10 5 85 150 240 2.5
3 17 23 0.5 20 10 5 85 210 300 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 175 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 175 kN/m2
Mmax = 29.95 kN.m/m
N = 630 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.95
= 8.39E-01 kN.m/m
N = 630 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 368.39 kN/m
NL ML
s = AL + ZL

= 368.39 + 8.39E+05
4.416 52300
= 83.42 + 16.04
= 99.46 < sca = 150 N/mm2

MH = Mmax - ML
= 29.95 - 0.84
= 29.11 kN.m/m

NH = N - NL
= 630 - 368.39
= 261.61 kN/m
NH + MH
sH = AH ZH
= 83.42 + 80.17
= 163.59 < sa = 210 N/mm^2

Case 2 Depth 12 m to 17 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 240 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 240 kN/m2
Mmax = 43.13 kN.m/m
N = 864 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 43.13
= 1.01E+00 kN.m/m
N = 864 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 466.48 kN/m

NL ML
s = AL + ZL

= 466.48 + 1.01E+06
4.416 52300
= 105.63 + 19.33
= 124.96 < sca = 150 N/mm2

MH = Mmax - ML
= 43.13 - 1.01
= 42.12 kN.m/m

NH = N - NL
= 864 - 466.48
= 397.52 kN/m
NH + MH
sH = AH ZH
= 105.63 + 96.66
= 202.29 < sa = 210 N/mm^2
Case 3 Depth 17 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 300 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 300 kN/m2
Mmax = 49.28 kN.m/m
N = 1080 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 49.28
= 7.00E-01 kN.m/m
N = 1080 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 446.23 kN/m

NL ML
s = AL + ZL

= 446.23 + 7.00E+05
4.416 52300
= 101.05 + 13.38
= 114.43 < sca = 150 N/mm2

MH = Mmax - ML
= 49.28 - 0.7
= 48.58 kN.m/m

NH = N - NL
= 1080 - 446.23
= 633.77 kN/m
NH + MH
sH = AH ZH
= 101.05 + 66.89
= 167.94 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 22.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 6.2 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 106 88 199 3
2 15 17.5 0.5 20 10 5 106 113 224 2.5
3 17.5 21.5 0.5 20 10 5 106 153 264 2
4 21.5 22.5 0.5 20 10 5 106 163 274 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 199 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 199 kN/m2
Mmax = 35.63 kN.m/m
N = 716.4 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 35.63
= 9.98E-01 kN.m/m
N = 716.4 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 418.91 kN/m
NL ML
s = AL + ZL

= 418.91 + 9.98E+05
4.416 52300
= 94.86 + 19.08
= 113.94 < sca = 150 N/mm2

MH = Mmax - ML
= 35.63 - 1
= 34.63 kN.m/m

NH = N - NL
= 716.4 - 418.91
= 297.49 kN/m
NH + MH
sH = AH ZH
= 94.86 + 95.37
= 190.23 < sa = 210 N/mm^2

Case 2 Depth 15 m to 17.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 224 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 224 kN/m2
Mmax = 39.24 kN.m/m
N = 806.4 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 39.24
= 9.20E-01 kN.m/m
N = 806.4 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 435.38 kN/m

NL ML
s = AL + ZL

= 435.38 + 9.20E+05
4.416 52300
= 98.59 + 17.59
= 116.18 < sca = 150 N/mm2

MH = Mmax - ML
= 39.24 - 0.92
= 38.32 kN.m/m

NH = N - NL
= 806.4 - 435.38
= 371.02 kN/m
NH + MH
sH = AH ZH
= 98.59 + 87.94
= 186.53 < sa = 210 N/mm^2
Case 3 Depth 17.5 m to 21.5 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 264 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 264 kN/m2
Mmax = 45.41 kN.m/m
N = 950.4 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 45.41
= 8.56E-01 kN.m/m
N = 950.4 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 460.19 kN/m

NL ML
s = AL + ZL

= 460.19 + 8.56E+05
4.416 52300
= 104.21 + 16.36
= 120.57 < sca = 150 N/mm2

MH = Mmax - ML
= 45.41 - 0.86
= 44.55 kN.m/m

NH = N - NL
= 950.4 - 460.19
= 490.21 kN/m
NH + MH
sH = AH ZH
= 104.21 + 81.79
= 186 < sa = 210 N/mm^2

Case 4 Depth 21.5 m to 22.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 274 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 274 kN/m2
Mmax = 40.78 kN.m/m
N = 986.4 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 40.78
= 3.88E-01 kN.m/m
N = 986.4 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 315.1 kN/m

NL ML
s = AL + ZL

= 315.1 + 3.88E+05
4.416 52300
= 71.35 + 7.42
= 78.77 < sca = 150 N/mm2

MH = Mmax - ML
= 40.78 - 0.39
= 40.39 kN.m/m

NH = N - NL
= 986.4 - 315.1
= 671.3 kN/m
NH + MH
sH = AH ZH
= 71.35 + 37.08
= 108.43 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 22 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 2m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 70 100 175 3
2 12 17 0.5 20 10 5 85 150 240 2.5
3 17 22 0.5 20 10 5 85 200 290 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 175 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 175 kN/m2
Mmax = 29.95 kN.m/m
N = 630 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.95
= 8.39E-01 kN.m/m
N = 630 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 368.39 kN/m
NL ML
s = AL + ZL

= 368.39 + 8.39E+05
4.416 52300
= 83.42 + 16.04
= 99.46 < sca = 150 N/mm2

MH = Mmax - ML
= 29.95 - 0.84
= 29.11 kN.m/m

NH = N - NL
= 630 - 368.39
= 261.61 kN/m
NH + MH
sH = AH ZH
= 83.42 + 80.17
= 163.59 < sa = 210 N/mm^2

Case 2 Depth 12 m to 17 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 240 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 240 kN/m2
Mmax = 43.13 kN.m/m
N = 864 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 43.13
= 1.01E+00 kN.m/m
N = 864 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 466.48 kN/m

NL ML
s = AL + ZL

= 466.48 + 1.01E+06
4.416 52300
= 105.63 + 19.33
= 124.96 < sca = 150 N/mm2

MH = Mmax - ML
= 43.13 - 1.01
= 42.12 kN.m/m

NH = N - NL
= 864 - 466.48
= 397.52 kN/m
NH + MH
sH = AH ZH
= 105.63 + 96.66
= 202.29 < sa = 210 N/mm^2
Case 3 Depth 17 m to 22 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 290 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 290 kN/m2
Mmax = 47.22 kN.m/m
N = 1044 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 47.22
= 6.71E-01 kN.m/m
N = 1044 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 431.35 kN/m

NL ML
s = AL + ZL

= 431.35 + 6.71E+05
4.416 52300
= 97.68 + 12.82
= 110.5 < sca = 150 N/mm2

MH = Mmax - ML
= 47.22 - 0.67
= 46.55 kN.m/m

NH = N - NL
= 1044 - 431.35
= 612.65 kN/m
NH + MH
sH = AH ZH
= 97.68 + 64.1
= 161.78 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 22 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 17.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 21 0.5 20 10 5 150 35 190 3
3 21 22 0.5 20 10 5 150 45 200 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 190 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 190 kN/m2
Mmax = 33.44 kN.m/m
N = 684 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 33.44
= 9.36E-01 kN.m/m
N = 684 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 399.97 kN/m

NL ML
s = AL + ZL

= 399.97 + 9.36E+05
4.416 52300
= 90.57 + 17.9
= 108.47 < sca = 150 N/mm2

MH = Mmax - ML
= 33.44 - 0.94
= 32.5 kN.m/m

NH = N - NL
= 684 - 399.97
= 284.03 kN/m
NH + MH
sH = AH ZH
= 90.57 + 89.5
= 180.07 < sa = 210 N/mm^2
Case 3 Depth 21 m to 22 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 200 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 200 kN/m2
Mmax = 28.62 kN.m/m
N = 720 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 28.62
= 2.72E-01 kN.m/m
N = 720 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 230 kN/m

NL ML
s = AL + ZL

= 230 + 2.72E+05
4.416 52300
= 52.08 + 5.21
= 57.29 < sca = 150 N/mm2

MH = Mmax - ML
= 28.62 - 0.27
= 28.35 kN.m/m

NH = N - NL
= 720 - 230
= 490 kN/m
NH + MH
sH = AH ZH
= 52.08 + 26.02
= 78.1 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 21 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 21 0.5 20 10 5 150 60 215 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 215 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 215 kN/m2
Mmax = 39.71 kN.m/m
N = 774 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 39.71
= 1.11E+00 kN.m/m
N = 774 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 452.59 kN/m

NL ML
s = AL + ZL

= 452.59 + 1.11E+06
4.416 52300
= 102.49 + 21.26
= 123.75 < sca = 150 N/mm2

MH = Mmax - ML
= 39.71 - 1.11
= 38.6 kN.m/m

NH = N - NL
= 774 - 452.59
= 321.41 kN/m
NH + MH
sH = AH ZH
= 102.49 + 106.3
= 208.79 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 19 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 10.4 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 127 46 178 3
2 15 17.5 0.5 20 10 5 127 71 203 2.5
3 17.5 19 0.5 20 10 5 127 86 218 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 178 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 178 kN/m2
Mmax = 30.64 kN.m/m
N = 640.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 30.64
= 8.58E-01 kN.m/m
N = 640.8 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 374.71 kN/m
NL ML
s = AL + ZL

= 374.71 + 8.58E+05
4.416 52300
= 84.85 + 16.41
= 101.26 < sca = 150 N/mm2

MH = Mmax - ML
= 30.64 - 0.86
= 29.78 kN.m/m

NH = N - NL
= 640.8 - 374.71
= 266.09 kN/m
NH + MH
sH = AH ZH
= 84.85 + 82.01
= 166.86 < sa = 210 N/mm^2

Case 2 Depth 15 m to 19 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 218 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 218 kN/m2
Mmax = 37.84 kN.m/m
N = 784.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 37.84
= 8.87E-01 kN.m/m
N = 784.8 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 423.72 kN/m

NL ML
s = AL + ZL

= 423.72 + 8.87E+05
4.416 52300
= 95.95 + 16.96
= 112.91 < sca = 150 N/mm2

MH = Mmax - ML
= 37.84 - 0.89
= 36.95 kN.m/m

NH = N - NL
= 784.8 - 423.72
= 361.08 kN/m
NH + MH
sH = AH ZH
= 95.95 + 84.8
= 180.75 < sa = 210 N/mm^2
Case 3 Depth 17.5 m to 19 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 218 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 218 kN/m2
Mmax = 33.37 kN.m/m
N = 784.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 33.37
= 4.74E-01 kN.m/m
N = 784.8 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 324.26 kN/m

NL ML
s = AL + ZL

= 324.26 + 4.74E+05
4.416 52300
= 73.43 + 9.06
= 82.49 < sca = 150 N/mm2

MH = Mmax - ML
= 33.37 - 0.47
= 32.9 kN.m/m

NH = N - NL
= 784.8 - 324.26
= 460.54 kN/m
NH + MH
sH = AH ZH
= 73.43 + 45.3
= 118.73 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 13.1 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 140.5 19 164.5 3
2 15 18.5 0.5 20 10 5 140.5 54 199.5 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 164.5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 164.5 kN/m2
Mmax = 27.63 kN.m/m
N = 592.2 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 27.63
= 7.74E-01 kN.m/m
N = 592.2 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 346.29 kN/m
NL ML
s = AL + ZL

= 346.29 + 7.74E+05
4.416 52300
= 78.42 + 14.79
= 93.21 < sca = 150 N/mm2

MH = Mmax - ML
= 27.63 - 0.77
= 26.86 kN.m/m

NH = N - NL
= 592.2 - 346.29
= 245.91 kN/m
NH + MH
sH = AH ZH
= 78.42 + 73.97
= 152.39 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 199.5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 199.5 kN/m2
Mmax = 35.75 kN.m/m
N = 718.2 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 35.75
= 1.00E+00 kN.m/m
N = 718.2 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 419.96 kN/m

NL ML
s = AL + ZL

= 419.96 + 1.00E+06
4.416 52300
= 95.1 + 19.14
= 114.24 < sca = 150 N/mm2

MH = Mmax - ML
= 35.75 - 1
= 34.75 kN.m/m

NH = N - NL
= 718.2 - 419.96
= 298.24 kN/m
NH + MH
sH = AH ZH
= 95.1 + 95.7
= 190.8 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 25 180 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 180 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 180 kN/m2
Mmax = 31.09 kN.m/m
N = 648 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 31.09
= 8.71E-01 kN.m/m
N = 648 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 378.92 kN/m

NL ML
s = AL + ZL

= 378.92 + 8.71E+05
4.416 52300
= 85.81 + 16.65
= 102.46 < sca = 150 N/mm2

MH = Mmax - ML
= 31.09 - 0.87
= 30.22 kN.m/m

NH = N - NL
= 648 - 378.92
= 269.08 kN/m
NH + MH
sH = AH ZH
= 85.8 + 83.22
= 169.02 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 17 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 17 0.5 20 10 5 150 15 170 2

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 17 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 170 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 170 kN/m2
Mmax = 26.19 kN.m/m
N = 612 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 26.19
= 4.94E-01 kN.m/m
N = 612 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 296.34 kN/m

NL ML
s = AL + ZL

= 296.34 + 4.94E+05
4.416 52300
= 67.11 + 9.44
= 76.55 < sca = 150 N/mm2

MH = Mmax - ML
= 26.19 - 0.49
= 25.7 kN.m/m

NH = N - NL
= 612 - 296.34
= 315.66 kN/m
NH + MH
sH = AH ZH
= 67.1 + 47.18
= 114.28 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 13 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 17.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 120 0 125 3
2 12 13 0.5 20 10 5 130 0 135 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 125 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 125 kN/m2
Mmax = 19.6 kN.m/m
N = 450 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 19.6
= 5.49E-01 kN.m/m
N = 450 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 263.14 kN/m
NL ML
s = AL + ZL

= 263.14 + 5.49E+05
4.416 52300
= 59.59 + 10.49
= 70.08 < sca = 150 N/mm2

MH = Mmax - ML
= 19.6 - 0.55
= 19.05 kN.m/m

NH = N - NL
= 450 - 263.14
= 186.86 kN/m
NH + MH
sH = AH ZH
= 59.59 + 52.46
= 112.05 < sa = 210 N/mm^2

Case 2 Depth 12 m to 13 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 5 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 5 kN/m2
Mmax = 0.65 kN.m/m
N = 18 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 0.65
= 6.18E-03 kN.m/m
N = 18 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 5.75 kN/m

NL ML
s = AL + ZL

= 5.75 + 6.18E+03
4.416 52300
= 1.3 + 0.12
= 1.42 < sca = 150 N/mm2

MH = Mmax - ML
= 0.65 - 0.01
= 0.64 kN.m/m

NH = N - NL
= 18 - 5.75
= 12.25 kN/m
NH + MH
sH = AH ZH
= 1.3 + 0.59
= 1.89 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 18.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 17.5 0.5 20 10 5 150 0 155 2.5
3 17.5 18.5 0.5 20 10 5 150 0 155 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 155 kN/m2
Mmax = 24.5 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 24.5
= 5.74E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 301.27 kN/m

NL ML
s = AL + ZL

= 301.27 + 5.74E+05
4.416 52300
= 68.22 + 10.98
= 79.2 < sca = 150 N/mm2

MH = Mmax - ML
= 24.5 - 0.57
= 23.93 kN.m/m

NH = N - NL
= 558 - 301.27
= 256.73 kN/m
NH + MH
sH = AH ZH
= 68.22 + 54.92
= 123.14 < sa = 210 N/mm^2
Case 3 Depth 17.5 m to 18.5 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 155 kN/m2
Mmax = 21.67 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 21.67
= 2.06E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 178.25 kN/m

NL ML
s = AL + ZL

= 178.25 + 2.06E+05
4.416 52300
= 40.36 + 3.94
= 44.3 < sca = 150 N/mm2

MH = Mmax - ML
= 21.67 - 0.21
= 21.46 kN.m/m

NH = N - NL
= 558 - 178.25
= 379.75 kN/m
NH + MH
sH = AH ZH
= 40.36 + 19.7
= 60.06 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 28 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 20.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 0 155 3
3 18 23 0.5 20 10 5 150 25 180 2.5
4 23 28 0.5 20 10 5 150 75 230 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m

NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 180 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 180 kN/m2
Mmax = 29.5 kN.m/m
N = 648 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 29.5
= 6.92E-01 kN.m/m
N = 648 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 349.86 kN/m

NL ML
s = AL + ZL

= 349.86 + 6.92E+05
4.416 52300
= 79.23 + 13.22
= 92.45 < sca = 150 N/mm2

MH = Mmax - ML
= 29.5 - 0.69
= 28.81 kN.m/m

NH = N - NL
= 648 - 349.86
= 298.14 kN/m
NH + MH
sH = AH ZH
= 79.23 + 66.12
= 145.35 < sa = 210 N/mm^2

Case 4 Depth 23 m to 28 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 230 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 230 kN/m2
Mmax = 35.56 kN.m/m
N = 828 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 35.56
= 5.05E-01 kN.m/m
N = 828 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 342.11 kN/m

NL ML
s = AL + ZL

= 342.11 + 5.05E+05
4.416 52300
= 77.47 + 9.66
= 87.13 < sca = 150 N/mm2

MH = Mmax - ML
= 35.56 - 0.5
= 35.06 kN.m/m

NH = N - NL
= 828 - 342.11
= 485.89 kN/m
NH + MH
sH = AH ZH
= 77.47 + 48.28
= 125.75 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 28 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 21 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 0 155 3
3 18 23 0.5 20 10 5 150 20 175 2.5
4 23 28 0.5 20 10 5 150 70 225 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m

NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 175 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 175 kN/m2
Mmax = 28.47 kN.m/m
N = 630 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 28.47
= 6.67E-01 kN.m/m
N = 630 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 340.14 kN/m

NL ML
s = AL + ZL

= 340.14 + 6.67E+05
4.416 52300
= 77.02 + 12.76
= 89.78 < sca = 150 N/mm2

MH = Mmax - ML
= 28.47 - 0.67
= 27.8 kN.m/m

NH = N - NL
= 630 - 340.14
= 289.86 kN/m
NH + MH
sH = AH ZH
= 77.02 + 63.8
= 140.82 < sa = 210 N/mm^2

Case 4 Depth 23 m to 28 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 225 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 225 kN/m2
Mmax = 34.65 kN.m/m
N = 810 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 34.65
= 4.92E-01 kN.m/m
N = 810 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 334.67 kN/m

NL ML
s = AL + ZL

= 334.67 + 4.92E+05
4.416 52300
= 75.79 + 9.41
= 85.2 < sca = 150 N/mm2

MH = Mmax - ML
= 34.65 - 0.49
= 34.16 kN.m/m

NH = N - NL
= 810 - 334.67
= 475.33 kN/m
NH + MH
sH = AH ZH
= 75.79 + 47.04
= 122.83 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 29.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 18.2 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 0 155 3
3 18 23 0.5 20 10 5 150 48 203 2.5
4 23 29.5 0.5 20 10 5 150 113 268 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m

NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 203 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 203 kN/m2
Mmax = 34.43 kN.m/m
N = 730.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 34.43
= 8.07E-01 kN.m/m
N = 730.8 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 394.56 kN/m

NL ML
s = AL + ZL

= 394.56 + 8.07E+05
4.416 52300
= 89.35 + 15.43
= 104.78 < sca = 150 N/mm2

MH = Mmax - ML
= 34.43 - 0.81
= 33.62 kN.m/m

NH = N - NL
= 730.8 - 394.56
= 336.24 kN/m
NH + MH
sH = AH ZH
= 89.35 + 77.16
= 166.51 < sa = 210 N/mm^2

Case 4 Depth 23 m to 29.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 268 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 268 kN/m2
Mmax = 42.81 kN.m/m
N = 964.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 42.81
= 6.08E-01 kN.m/m
N = 964.8 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 398.63 kN/m

NL ML
s = AL + ZL

= 398.63 + 6.08E+05
4.416 52300
= 90.27 + 11.62
= 101.89 < sca = 150 N/mm2

MH = Mmax - ML
= 42.81 - 0.61
= 42.2 kN.m/m

NH = N - NL
= 964.8 - 398.63
= 566.17 kN/m
NH + MH
sH = AH ZH
= 90.27 + 58.11
= 148.38 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 29.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 20 175 3
3 18 23 0.5 20 10 5 150 70 225 2.5
4 23 29.5 0.5 20 10 5 150 135 290 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 175 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 175 kN/m2
Mmax = 29.95 kN.m/m
N = 630 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.95
= 8.39E-01 kN.m/m
N = 630 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 368.39 kN/m

NL ML
s = AL + ZL

= 368.39 + 8.39E+05
4.416 52300
= 83.42 + 16.04
= 99.46 < sca = 150 N/mm2

MH = Mmax - ML
= 29.95 - 0.84
= 29.11 kN.m/m

NH = N - NL
= 630 - 368.39
= 261.61 kN/m
NH + MH
sH = AH ZH
= 83.42 + 80.17
= 163.59 < sa = 210 N/mm^2
Case 3 Depth 18 m to 23 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 225 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 225 kN/m2
Mmax = 39.48 kN.m/m
N = 810 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 39.48
= 9.26E-01 kN.m/m
N = 810 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 437.32 kN/m

NL ML
s = AL + ZL

= 437.32 + 9.26E+05
4.416 52300
= 99.03 + 17.7
= 116.73 < sca = 150 N/mm2

MH = Mmax - ML
= 39.48 - 0.93
= 38.55 kN.m/m

NH = N - NL
= 810 - 437.32
= 372.68 kN/m
NH + MH
sH = AH ZH
= 99.03 + 88.47
= 187.5 < sa = 210 N/mm^2

Case 4 Depth 23 m to 29.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 290 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 290 kN/m2
Mmax = 47.22 kN.m/m
N = 1044 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 47.22
= 6.71E-01 kN.m/m
N = 1044 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 431.35 kN/m

NL ML
s = AL + ZL

= 431.35 + 6.71E+05
4.416 52300
= 97.68 + 12.82
= 110.5 < sca = 150 N/mm2

MH = Mmax - ML
= 47.22 - 0.67
= 46.55 kN.m/m

NH = N - NL
= 1044 - 431.35
= 612.65 kN/m
NH + MH
sH = AH ZH
= 97.68 + 64.1
= 161.78 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 28 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 21 0.5 20 10 5 150 45 200 3
3 21 25 0.5 20 10 5 150 85 240 2.5
4 25 28 0.5 20 10 5 150 115 270 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 200 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 200 kN/m2
Mmax = 35.88 kN.m/m
N = 720 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 35.88
= 1.00E+00 kN.m/m
N = 720 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 421.02 kN/m

NL ML
s = AL + ZL

= 421.02 + 1.00E+06
4.416 52300
= 95.34 + 19.21
= 114.55 < sca = 150 N/mm2

MH = Mmax - ML
= 35.88 - 1
= 34.88 kN.m/m

NH = N - NL
= 720 - 421.02
= 298.98 kN/m
NH + MH
sH = AH ZH
= 95.34 + 96.06
= 191.4 < sa = 210 N/mm^2
Case 3 Depth 21 m to 25 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 240 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 240 kN/m2
Mmax = 43.13 kN.m/m
N = 864 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 43.13
= 1.01E+00 kN.m/m
N = 864 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 466.48 kN/m

NL ML
s = AL + ZL

= 466.48 + 1.01E+06
4.416 52300
= 105.63 + 19.33
= 124.96 < sca = 150 N/mm2

MH = Mmax - ML
= 43.13 - 1.01
= 42.12 kN.m/m

NH = N - NL
= 864 - 466.48
= 397.52 kN/m
NH + MH
sH = AH ZH
= 105.63 + 96.66
= 202.29 < sa = 210 N/mm^2

Case 4 Depth 25 m to 28 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 270 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 270 kN/m2
Mmax = 43.2 kN.m/m
N = 972 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 43.2
= 6.13E-01 kN.m/m
N = 972 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 401.6 kN/m

NL ML
s = AL + ZL

= 401.6 + 6.13E+05
4.416 52300
= 90.94 + 11.73
= 102.67 < sca = 150 N/mm2

MH = Mmax - ML
= 43.2 - 0.61
= 42.59 kN.m/m

NH = N - NL
= 972 - 401.6
= 570.4 kN/m
NH + MH
sH = AH ZH
= 90.94 + 58.65
= 149.59 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 28 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 23 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 21 0.5 20 10 5 150 0 155 3
3 21 26 0.5 20 10 5 150 30 185 2.5
4 26 28 0.5 20 10 5 150 50 205 2

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m

NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2
Case 3 Depth 21 m to 26 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 185 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 185 kN/m2
Mmax = 30.54 kN.m/m
N = 666 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 30.54
= 7.16E-01 kN.m/m
N = 666 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 359.58 kN/m

NL ML
s = AL + ZL

= 359.58 + 7.16E+05
4.416 52300
= 81.43 + 13.69
= 95.12 < sca = 150 N/mm2

MH = Mmax - ML
= 30.54 - 0.72
= 29.82 kN.m/m

NH = N - NL
= 666 - 359.58
= 306.42 kN/m
NH + MH
sH = AH ZH
= 81.43 + 68.44
= 149.87 < sa = 210 N/mm^2

Case 4 Depth 26 m to 28 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 205 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 205 kN/m2
Mmax = 32.86 kN.m/m
N = 738 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 32.86
= 6.19E-01 kN.m/m
N = 738 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 357.35 kN/m

NL ML
s = AL + ZL

= 357.35 + 6.19E+05
4.416 52300
= 80.92 + 11.84
= 92.76 < sca = 150 N/mm2

MH = Mmax - ML
= 32.86 - 0.62
= 32.24 kN.m/m

NH = N - NL
= 738 - 357.35
= 380.65 kN/m
NH + MH
sH = AH ZH
= 80.92 + 59.19
= 140.11 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18.5 0.5 20 10 5 150 25 180 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 180 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 180 kN/m2
Mmax = 31.09 kN.m/m
N = 648 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 31.09
= 8.71E-01 kN.m/m
N = 648 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 378.92 kN/m

NL ML
s = AL + ZL

= 378.92 + 8.71E+05
4.416 52300
= 85.81 + 16.65
= 102.46 < sca = 150 N/mm2

MH = Mmax - ML
= 31.09 - 0.87
= 30.22 kN.m/m

NH = N - NL
= 648 - 378.92
= 269.08 kN/m
NH + MH
sH = AH ZH
= 85.8 + 83.22
= 169.02 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 19 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18.5 0.5 20 10 5 150 0 155 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m

NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 15.5 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18.5 0.5 20 10 5 150 30 185 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 185 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 185 kN/m2
Mmax = 32.26 kN.m/m
N = 666 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 32.26
= 9.03E-01 kN.m/m
N = 666 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 389.44 kN/m

NL ML
s = AL + ZL

= 389.44 + 9.03E+05
4.416 52300
= 88.19 + 17.27
= 105.46 < sca = 150 N/mm2

MH = Mmax - ML
= 32.26 - 0.9
= 31.36 kN.m/m

NH = N - NL
= 666 - 389.44
= 276.56 kN/m
NH + MH
sH = AH ZH
= 88.19 + 86.36
= 174.55 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18.5 0.5 20 10 5 150 25 180 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 180 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 180 kN/m2
Mmax = 31.09 kN.m/m
N = 648 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 31.09
= 8.71E-01 kN.m/m
N = 648 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 378.92 kN/m

NL ML
s = AL + ZL

= 378.92 + 8.71E+05
4.416 52300
= 85.81 + 16.65
= 102.46 < sca = 150 N/mm2

MH = Mmax - ML
= 31.09 - 0.87
= 30.22 kN.m/m

NH = N - NL
= 648 - 378.92
= 269.08 kN/m
NH + MH
sH = AH ZH
= 85.8 + 83.22
= 169.02 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 22.5 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 4.8 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 99 102 206 3
2 15 17.5 0.5 20 10 5 99 127 231 2.5
3 17.5 21.5 0.5 20 10 5 99 167 271 2
4 21.5 22.5 0.5 20 10 5 99 177 281 1

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 206 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 206 kN/m2
Mmax = 37.38 kN.m/m
N = 741.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 37.38
= 1.05E+00 kN.m/m
N = 741.6 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 433.65 kN/m
NL ML
s = AL + ZL

= 433.65 + 1.05E+06
4.416 52300
= 98.2 + 20.01
= 118.21 < sca = 150 N/mm2

MH = Mmax - ML
= 37.38 - 1.05
= 36.33 kN.m/m

NH = N - NL
= 741.6 - 433.65
= 307.95 kN/m
NH + MH
sH = AH ZH
= 98.2 + 100.05
= 198.25 < sa = 210 N/mm^2

Case 2 Depth 15 m to 17.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 231 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 231 kN/m2
Mmax = 40.92 kN.m/m
N = 831.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 40.92
= 9.59E-01 kN.m/m
N = 831.6 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 448.99 kN/m

NL ML
s = AL + ZL

= 448.99 + 9.59E+05
4.416 52300
= 101.67 + 18.34
= 120.01 < sca = 150 N/mm2

MH = Mmax - ML
= 40.92 - 0.96
= 39.96 kN.m/m

NH = N - NL
= 831.6 - 448.99
= 382.61 kN/m
NH + MH
sH = AH ZH
= 101.67 + 91.71
= 193.38 < sa = 210 N/mm^2
Case 3 Depth 17.5 m to 21.5 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 271 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 271 kN/m2
Mmax = 47.02 kN.m/m
N = 975.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 47.02
= 8.86E-01 kN.m/m
N = 975.6 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 472.4 kN/m

NL ML
s = AL + ZL

= 472.4 + 8.86E+05
4.416 52300
= 106.97 + 16.94
= 123.91 < sca = 150 N/mm2

MH = Mmax - ML
= 47.02 - 0.89
= 46.13 kN.m/m

NH = N - NL
= 975.6 - 472.4
= 503.2 kN/m
NH + MH
sH = AH ZH
= 106.97 + 84.69
= 191.66 < sa = 210 N/mm^2

Case 4 Depth 21.5 m to 22.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.362 > Ph = 281 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 2121.54 kN/m2
Ph = 281 kN/m2
Mmax = 41.98 kN.m/m
N = 1011.6 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 41.98
= 3.99E-01 kN.m/m
N = 1011.6 kN/m
AL = 4416 mm^2
AH = 9408 mm^2
NL = AL xN
AL+AH
NL = 323.15 kN/m

NL ML
s = AL + ZL

= 323.15 + 3.99E+05
4.416 52300
= 73.18 + 7.64
= 80.82 < sca = 150 N/mm2

MH = Mmax - ML
= 41.98 - 0.4
= 41.58 kN.m/m

NH = N - NL
= 1011.6 - 323.15
= 688.45 kN/m
NH + MH
sH = AH ZH
= 73.18 + 38.17
= 111.35 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 18 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 16.2 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 150 0 155 3
2 15 18 0.5 20 10 5 150 18 173 3

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 155 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 155 kN/m2
Mmax = 25.59 kN.m/m
N = 558 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 25.59
= 7.17E-01 kN.m/m
N = 558 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 326.29 kN/m
NL ML
s = AL + ZL

= 326.29 + 7.17E+05
4.416 52300
= 73.89 + 13.7
= 87.59 < sca = 150 N/mm2

MH = Mmax - ML
= 25.59 - 0.72
= 24.87 kN.m/m

NH = N - NL
= 558 - 326.29
= 231.71 kN/m
NH + MH
sH = AH ZH
= 73.89 + 68.49
= 142.38 < sa = 210 N/mm^2

Case 2 Depth 15 m to 18 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 5.45E+07 mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 173 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 173 kN/m2
Mmax = 29.5 kN.m/m
N = 622.8 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 29.5
= 8.26E-01 kN.m/m
N = 622.8 kN/m
AL = 4416 mm^2
AH = 3136 mm^2
NL = AL xN
AL+AH
NL = 364.18 kN/m

NL ML
s = AL + ZL

= 364.18 + 8.26E+05
4.416 52300
= 82.47 + 15.8
= 98.27 < sca = 150 N/mm2

MH = Mmax - ML
= 29.5 - 0.83
= 28.67 kN.m/m

NH = N - NL
= 622.8 - 364.18
= 258.62 kN/m
NH + MH
sH = AH ZH
= 82.47 + 78.96
= 161.43 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 21 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 3m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth
pressure at rest Wet Under Water Pressure Soil to water Net Side Pressure
S. No.
From to K0 Psoil +
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 15 0.5 20 10 5 90 120 215 3
2 15 17.5 0.5 20 10 5 90 145 240 2.5
3 17.5 21 0.5 20 10 5 90 180 275 1.5

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 15 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 215 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 215 kN/m2
Mmax = 39.71 kN.m/m
N = 774 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 39.71
= 1.11E+00 kN.m/m
N = 774 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 452.59 kN/m
NL ML
s = AL + ZL

= 452.59 + 1.11E+06
4.416 52300
= 102.49 + 21.26
= 123.75 < sca = 150 N/mm2

MH = Mmax - ML
= 39.71 - 1.11
= 38.6 kN.m/m

NH = N - NL
= 774 - 452.59
= 321.41 kN/m
NH + MH
sH = AH ZH
= 102.49 + 106.3
= 208.79 < sa = 210 N/mm^2

Case 2 Depth 15 m to 17.5 m


Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 573.817 > Ph = 240 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 860.73 kN/m2
Ph = 240 kN/m2
Mmax = 43.13 kN.m/m
N = 864 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 43.13
= 1.01E+00 kN.m/m
N = 864 kN/m
AL = 4416 mm^2
AH = 3763.2 mm^2
NL = AL xN
AL+AH
NL = 466.48 kN/m

NL ML
s = AL + ZL

= 466.48 + 1.01E+06
4.416 52300
= 105.63 + 19.33
= 124.96 < sca = 150 N/mm2

MH = Mmax - ML
= 43.13 - 1.01
= 42.12 kN.m/m

NH = N - NL
= 864 - 466.48
= 397.52 kN/m
NH + MH
sH = AH ZH
= 105.63 + 96.66
= 202.29 < sa = 210 N/mm^2
Case 3 Depth 17.5 m to 21 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 1.5 m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.392 > Ph = 275 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1421.09 kN/m2
Ph = 275 kN/m2
Mmax = 44.19 kN.m/m
N = 990 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 44.19
= 6.28E-01 kN.m/m
N = 990 kN/m
AL = 4416 mm^2
AH = 6272 mm^2
NL = AL xN
AL+AH
NL = 409.04 kN/m

NL ML
s = AL + ZL

= 409.04 + 6.28E+05
4.416 52300
= 92.63 + 12
= 104.63 < sca = 150 N/mm2

MH = Mmax - ML
= 44.19 - 0.63
= 43.56 kN.m/m

NH = N - NL
= 990 - 409.04
= 580.96 kN/m
NH + MH
sH = AH ZH
= 92.63 + 59.98
= 152.61 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 14 m (H)
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (K0) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

4 Surcharge
W = 10 kN/m2
Pressure due to surcharge = 5 kN/m2
5 Allowable Stresses
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 2.00E+08 kN/m2
7 Groundwater level depth Hw = 13 m
8 Shinso Pile Radius = 3.6 m
9 Unit volume weight gw = 10 kN/m2

Cofficient of earth Unit Volume weight Surcharge Pressure due to Pressure due Ring Spacing
Depth Net Side Pressure
pressure at rest Wet Under Water Pressure Soil to water
S. No.
Psoil +
From to K0
gt g' Psurchage Psoil Pwater Pwater+Psurcharge d
1 0 12 0.5 20 10 5 120 0 125 3
2 12 14 0.5 20 10 5 135 10 150 2

The allowable buckling load qa when the annulus is subjected to uniformly distributed load is calculated by the the following formula

2EI
qa = r3
I : Moment of inertia of area (I = IL+ IH)
Case 1 Depth 0 m to 12 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 125 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 720.63 kN/m2
Ph = 125 kN/m2
Mmax = 19.6 kN.m/m
N = 450 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 19.6
= 5.49E-01 kN.m/m
N = 450 kN/m
AL = 4416 mm^2
AH = 3.14E+03 mm^2
NL = AL xN
AL+AH
NL = 263.14 kN/m
NL ML
s = AL + ZL

= 263.14 + 5.49E+05
4.416 52300
= 59.59 + 10.49
= 70.08 < sca = 150 N/mm2

MH = Mmax - ML
= 19.6 - 0.55
= 19.05 kN.m/m

NH = N - NL
= 450 - 263.14
= 186.86 kN/m
NH + MH
sH = AH ZH
= 59.59 + 52.46
= 112.05 < sa = 210 N/mm^2

Case 2 Depth 12 m to 14 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 2m
IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m
Moment of inertia of area of reinforcement
IH : material/Installation interval = 8.17E+07 mm4/m
I = 1569200 + 8.17E+07
= 8.33E+07 mm4/m
qa = 713.908 > Ph = 150 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

qk = 1070.86 kN/m2
Ph = 150 kN/m2
Mmax = 22.61 kN.m/m
N = 540 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.88E-02 x 22.61
= 4.26E-01 kN.m/m
N = 540 kN/m
AL = 4416 mm^2
AH = 4704 mm^2
NL = AL xN
AL+AH
NL = 261.47 kN/m

NL ML
s = AL + ZL

= 261.47 + 4.26E+05
4.416 52300
= 59.21 + 8.15
= 67.36 < sca = 150 N/mm2

MH = Mmax - ML
= 22.61 - 0.43
= 22.18 kN.m/m

NH = N - NL
= 540 - 261.47
= 278.53 kN/m
NH + MH
sH = AH ZH
= 59.21 + 40.72
= 99.93 < sa = 210 N/mm^2
1 Design Condition
1 Shinso Pile Type - Circular Shaft
2 Shinso Pile Dimension - 7.2 m (D) x 29.5 m (H)
Depth of Upper surface of Shinso Pile H: - 1.5 m
3 Soil condition
Earth pressure cofficient : Cofficient of Earth pressure at rest (Ka) is used
Earth Pressure Strength : Constant at a depth of 15 m or more

Cofficient of earth Unit Volume weight


Depth
No. pressure at rest Wet Under Water
From to Ka gt g'
1 1.5 19.5 0.5 20 10
2 19.5 22 0.5 20 10
3 22 29.5 0.5 20 10
4 29.5 31 0.5 20 10

4 Surcharge
W = 10 kN/m2
5 Allowable Stress Liner
Liner Plate sca = 150 N/mm2
Steel Material ssa = 210 N/mm2
6 Young's modulus E = 200000 N/mm2
7 Groundwater level depth Hw = 15 m ( As Being the Most Critical Case)
Unit volume weight gw = 10 kN/m2

G.L. 5

15 15
155

19.5 19.5 45
155
22 155 22 70

29.5 155 29.5 145

31 155 31 160

Height Earth
S.No. pressure
intensity
From to
1 0 19.5 155
2 19.5 22 155
3 22 29.5 155
4 29.5 31 155

Maximum Side Pressure in the design section


Height Earth
S.No. pressure
From to intensity
1 1.5 19.5 200
2 19.5 22 225
3 22 29.5 300
4 29.5 31 315

The allowable buckling load qa when the annulus is subjected to


uniformly distributed load is calculated by the the following formula
2EI
qa = r3

E : Young's Modulus = 2.00E+08 kN/m2


r : Shinso Pile Radius = 3.6 m
I : Moment of inertia of area (I = IL+ IH) mm4/m
1 Depth 1.5 m to 19.5 m
Reinforce the H beam to LP (Normal) t =3 mm at intervals of 3m

IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m

Moment of inertia of area of reinforcement 5.45E+07


IH : material/Installation interval = mm4/m
I = 1569200 + 5.45E+07
= 5.60E+07 mm4/m
qa = 480.423 > Ph = 200 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

Depth 1.5 m to 19.5 m


Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 3m

qk = 720.63 kN/m2
Ph = 200 kN/m2
Mmax = 35.88 kN.m/m
N = 720 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.80E-02 x 35.88
= 1.00E+00 kN.m/m
N = 720 kN/m
AL = 4416 mm^3
AH = 3136 mm^3
NL = AL xN
AL+AH
NL = 421.02 kN/m
NL ML
s = AL + ZL

= 421.02 + 1.00E+06
4.416 52300
= 95.34 + 19.21
= 114.55 < sca = 150 N/mm2

MH = Mmax - ML
= 35.88 - 1
= 34.88 kN.m/m

NH = N - NL
= 720 - 421.02
= 298.98 kN/m
NH + MH
sH = AH ZH
= 95.34 + 96.06
= 191.4 < sa = 210 N/mm^2

2 Depth 19.5 m to 22 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 2.5 m

IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m


Moment of inertia of area of reinforcement
IH : material/Installation interval = 6.54E+07 mm4/m
I = 1569200 + 6.54E+07
= 6.69E+07 mm4/m
qa = 5.74E+02 > Ph = 225 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

Depth 19.5 m to 22 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 2.5 m

qk = 860.73 kN/m2
Ph = 225 kN/m2
Mmax = 39.48 kN.m/m
N = 810 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 2.34E-02 x 39.48
= 9.26E-01 kN.m/m
N = 810 kN/m
AL = 4416 mm^3
AH = 3763.2 mm^3
NL = AL xN
AL+AH
NL = 437.32 kN/m

NL ML
s = AL + ZL

= 437.32 + 9.26E+05
4.416 52300
= 99.03 + 17.7
= 116.73 < sca = 150 N/mm2
MH = Mmax - ML
= 39.48 - 0.93
= 38.55 kN.m/m

NH = N - NL
= 810 - 437.32
= 372.68 kN/m
NH + MH
sH = AH ZH
= 99.03 + 88.47
= 187.5 < sa = 210 N/mm^2

3 Depth 22 m to 29.5 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 1.5 m

IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m


Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.09E+08 mm4/m
I = 1569200 + 1.09E+08
= 1.11E+08 mm4/m
qa = 947.39 > Ph = 300 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

Depth 22 m to 29.5 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 1.5 m

qk = 1421.09 kN/m2
Ph = 300 kN/m2
Mmax = 49.28 kN.m/m
N = 1080 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 1.42E-02 x 49.28
= 7.00E-01 kN.m/m
N = 1080 kN/m
AL = 4416 mm^3
AH = 6272 mm^3
NL = AL xN
AL+AH
NL = 446.23 kN/m

NL ML
s = AL + ZL

= 446.23 + 7.00E+05
4.416 52300
= 101.05 + 13.38
= 114.43 < sca = 150 N/mm2

MH = Mmax - ML
= 49.28 - 0.7
= 48.58 kN.m/m

NH = N - NL
= 1080 - 446.23
= 633.77 kN/m
NH + MH
sH = AH ZH
= 101.05 + 66.89
= 167.94 < sa = 210 N/mm^2
4 Depth 29.5 m to 31 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 1m

IL : Moment of Inertia of area of Liner plate = 1569200 mm4/m


Moment of inertia of area of reinforcement
IH : material/Installation interval = 1.63E+08 mm4/m
I = 1569200 + 1.63E+08
= 1.65E+08 mm4/m
qa = 1414.36 > Ph = 315 kN/m^2
2 Examination of bending compressive stress
The maximum distortion at the construction work shall be 1% of Shinso pile radius
d0 x Ph x r
Mmax = (1-Ph/qk)

N = Ph x r
3EI
qk = r^3
d0 = 36 mm (1% of Pile Radius)

Depth 29.5 m to 31 m
Reinforce the H beam to LP (Normal) t =2.7 mm at intervals of 1m

qk = 2121.54 kN/m2
Ph = 315 kN/m2
Mmax = 47.94 kN.m/m
N = 1134 kN/m
The bending moment shall be the ratio of moment of Inertia of area of liner plate to that to of the reinforcement
material, and the axial force shall be the ratio of the respective cross sectional areas.
Therefore, the generated stress sL of the liner plate is as the below

IL x Mmax
ML = IL+IH
= 9.51E-03 x 47.94
= 4.56E-01 kN.m/m
N = 1134 kN/m
AL = 4416 mm^3
AH = 9408 mm^3
NL = AL xN
AL+AH
NL = 362.25 kN/m

NL ML
s = AL + ZL

= 362.25 + 4.56E+05
4.416 52300
= 82.03 + 8.72
= 90.75 < sca = 150 N/mm2

MH = Mmax - ML
= 47.94 - 0.46
= 47.48 kN.m/m

NH = N - NL
= 1134 - 362.25
= 771.75 kN/m
NH + MH
sH = AH ZH
= 82.03 + 43.59
= 125.62 < sa = 210 N/mm^2