B 8453 b165 Assembly Model
B 8453 b165 Assembly Model
B 8453 b165 Assembly Model
173
P369 PL10*210 1 ASTM A36/*** 234 3.6 3.6
TOTAL WEIGHT FOR ONE ASSEMBLY 84.4
P098 BOLT LIST ONE ASSEMBLY B-8453-B165
SITE/SHOP BOLT DESCRIPTION QTY/ONE QTY/ALL GRADE FINISH
Site M 16 x 40 4 4 A325M/A563 Nuts Galvanized
P116 Site M 20 x 45 3 3 A325M/A563 Nuts Galvanized
120
120
Site M 24 x 55 3 3 A325M/A563 Nuts Galvanized
P113
P227 P227
-
UB254*146*37 x 1860
73
P098 P113
P113 P098 P227
3 ø 22 2 ø 18
1) SURFACE PREPARATION FOR GALVANIZATION:
46
53
53
SANDBLASTING SA21/2.
75
P227 P227 2 ø 18 3) WELDING WHERE NOT INDICATED SHALL BE CONTINUOUS
3 ø 22 P369 P369
FILLET WELD. DIMENSION "S" OF NON-DIMENSIONED FILLET
75
75
T1
P227 WELDS SHALL AT LEAST BE EQUAL TO:
S = 0.80 * T for Fy <= 250 MPa
Where: S
42 75 75 42 P227
DOCUMENT STATUS SIGNED DATE
12 12
10
P113
1 - ACCEPTED AS SUBMITTED (submit certified as final)
3 ø 22
347
10
REVISE AND RESUBMIT
- 2 -
INCORPORATE COMMENTS, UP-REV AND RESUBMIT
35 115
P227 REJECTED - Document unacceptable, REVise and resubmit
200
- 3 -
140
140
210
3 ø 26
234
SCF - SUPPLIER CERTIFIED AS FINAL
70
70
120
60
ISSUE OF CERTIFIED FINAL DOCUMENT DOES NOT RELIUPES SUPPLIER OF
234 RESPONSIBILITY OR LIABILITY UNDER THE CONTRACT/PURCHASE ORDER
70
12 12
30
15
P116 15 P113 CWP No:A10-WP5.4-020-FI-MC-101
-
2 ø 18
495 -
- -
295 75 75 50 -
-
-
OB RE-ISSUED FOR REVIEW UP 30/06/23 ET 30/06/23 EA 30/06/23
40 1820 OA RE-ISSUED FOR REVIEW UP 01/03/23 ET 01/03/23 EA 01/03/23
1860 O ISSUED FOR REVIEW UP 02/02/23 ET 02/02/23 EA 02/02/23
REV DESCRIPTION DWN DATE CHKD DATE APPD DATE
- REVISIONS
53
This Document is confidential. The copyright therein is vested in Nigeria LNG Ltd, Nigeria.
Recipient must obtain the written authority of the said company before wholly or partially duplicating.
P098
All rights reserved.
75
PO No: 1423030
3 ø 22
VENDOR DRAWING. No. NIGERIA LIQUEFIED NATURAL GAS
TGIL-AD-19589-310 NLNG - BONNY
75
DRAWN: UP PROJECT
DATE: 30/06/23 NLNG TRAIN 7
CHECKED: ET
VENDOR NAME
DATE: 30/06/23
- THOMPSON & GRACE INVESTMENTS LTD.
APPROVED: EA
LOCATION DISCIPLINE UNIT No
DATE: 30/06/23
BONNY ISLAND, NIGERIA CIV 2000
APPD. LNG:
TITLE
1 No.BEAM REQUIRED AS DRAWN MARKED B-8453-B165 DATE: PO 1423030 Thompson & Grace: ASSEMBLY DRAWING
{QRCODE} CONTRACTOR DRAWING. No.
L020-CD-B-19589 FOR STEEL STRUCTURE FOR B-8453
Tekla structures