Capitol Hill Project - Approved PRW Rates List

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ASSOCIATED PROJECTS INFRA

APPROVED PRW RATES FOR SHUTTERING & REBAR WORKS


CAPITOL HILL HOSPITAL BLOCK PROJECT
Sl.No Item Description Unit Unit Rate
Shuttering Works
Labour Charges for fixing of shuttering and deshuttering for PCC sides & Plum Concrete
1 Rmt 25.00
(Thickness Not Exceeding 150MM)
2 Labour Charges for making shuttering boards. Sq.M 70.00
Labour charges for erection, fixing of shuttring and de-shuttering upto a maximum height of
3
4.00Mtrs, at all floor levels including levelling & plumbing in line.
a) For Footings, Raft & Pedestals Sq.M 180.00

b) For Columns, Retaining Walls, Staircases & Core Walls (With Ply Board) Sq.M 250.00

c) For Columns, Retaining Walls, Staircases & Core Walls (With NOVA Pannel Boards) Sq.M 200.00

d) For all Other Items Excluding apart from a), b) & c) Sq.M 250.00
Labour charges for erection, fixing of shuttring and de-shuttering upto a maximum height of
4
4.80Mtrs, at all floor levels including levelling & plumbing in line.
a) For Columns, Retaining Walls, Staircases & Core Walls (With Ply Board) Sq.M 275.00

b) For Columns, Retaining Walls, Staircases & Core Walls (With NOVA Pannel Boards) Sq.M 225.00

c) For All items except Columns, Retaining Walls, Staircases & Core Walls Sq.M 300.00
Labour charges for erection and de-erection of stagging beyond 4.80Mtr as per the
5 Sq.M 50.00
instructions of EIC. (Slab Area shall be payable per Each Mtr Height)
Rebar Works
Labour charges for rebar cutting, bending, placing and tying rod in position by placing spacer
bars and cover blocks fixing as per the specifications of the drawings and as per the
1 instructions of EIC., at all leads and lifts (Binding Wire shall be supplied for free of cost as per
norms. Incase of any excess consumption, the differencial amount towards the same shall
be recovered from R.A.Bills)
a) For 8MM Dia to 16MM Dia M.T 7,500.00
b) For 20MM Dia to 32MM Dia M.T 7,000.00

Terms & Conditions:


Payment Terms: R.A.Bills shall be raised for every 15Days and the payment shall be released within 7Days from the
1
bill Date.
2 TDS Shall be Deducted, As Applicable.
3 No Additional Charges shall be paid towards Columns / Core walls / Retaining Wall Starters.
4 GST is Extra, if Applicable. ESI & PF Amount shall be recovered from the R.A.Bills
If Any Faults / Quality Issues arrises due to poor workmanship, the amount towards the rectification of the same shall
5
be recovered From R.A.Bills.
All Tools & Tackles like Dies & Claw Hammers etc., are to be arranged by sub-contractor only. However, the
6 machinerey & the Consumables like Machines, Blades, Tapes, Binding Wire, Cover Blocks etc., Shall be supplied for
free of cost.
CONTRACTOR ISSUED MATERIALS: Materials issued to the Sub-Contractor (on Returnable Basis) are to be returned
7 to stores after proper cleaning, once the works are completed. If the same are not returned, the Amount Towards the
same shall be recovered from R.A.Bills.

5% of the Bill Value Shall be withheld from each R.A.Bill towards Retention Amount, which shall be released after
8
Final Bill, upon submission of All No Dues from the Project In Charge.
Any Leads Beyond 100Mtrs & Lift Beyond 1st Floor Level, The Contractor will provide a Vehicle / Cranes for the
9 transportation to the work location. However, The scope of loading and un loading shall lies with Sub-Contractor
Only.
All Labour should adhere and follow the HSE & House Keeping Procedures as per Company Policy. Non
10
Complience will be penalized.