Reynold's Number

The document appears to be a technical document describing the calculation of line sizing for hydraulic systems. It includes input data like pressure, temperature, flow rates and pipe properties. It also includes calculation sheets and results. The document aims to size pipeline based on hydraulic calculations.

Uploaded by

Sagaya Raj Y
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
150 views12 pages

Reynold's Number

The document appears to be a technical document describing the calculation of line sizing for hydraulic systems. It includes input data like pressure, temperature, flow rates and pipe properties. It also includes calculation sheets and results. The document aims to size pipeline based on hydraulic calculations.

Uploaded by

Sagaya Raj Y
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 12

Spread Sheet

Line Hydraulics Calculation

Doc No.

Revision

Date
Revision history

Rev Date Description of Change

Approval Authority: (Enter Role Title)

Owner Developer Reviewer Approver

Summary

CONTENT
WorkSheet
1 Front Page
2 Control Page
3 Content
4 Input
5 Calc Sheet
6 Results
Validated Spreadsheet

Job no. Calculation No. Rev. Page of No.

Customer
Name:
Contract
Name:

Contents List Page No.

Sr No Description
1 VALIDATED SPREAD SHEET
A. INPUT SHEET TWO PHASE 1 to 2
B. CALC SHEET TWO PHASE 3
C. RESULTS SHEET TWO PHASE 4
D. INPUT SHEET - SINGLE PHASE (GAS)….NOTE 1 5 to 6
E. CALC SHEET SINGLE PHASE (GAS)….NOTE 1 7
F. RESULTS SHEET SINGLE PHASE (GAS)….NOTE 1 8
G. INPUT SHEEt SINGLE PHASE (LIQUID)…NOTE 1 9 to 10
F. CALC SHEET - SINGLE PHASE (LIQUID)….NOTE 1 11
H. RESULTS SHEET SINGLE PHASE (LIQUID)….NOTE 1 12
2 MANUAL CROSS CHECK CALCULATION
A. TWO PHASE (001) 13 to 21
B. SINGLE PHASE - GAS (002) 22 to 41
C. SINGLE PHASE - LIQUID (003) 42 to 49
3 USER MANUAL 50 to 66
NOTE 1: VALIDATED SPREAD SHEET (SOFT COPY)IS DISPLAYING EXAMPLE OF TWO PHASE .
FOR SINGLE PHASE CALCULATION CAN BE DERIVED BY CHANGING INPUT SHEET
WITH RESPECTIVE DATA AS MENTIONED IN MANUAL CALCULATION
Calculation Cover Sheet
PEC-BMS-EN-VSS-P-2550 Rev 0

Job No. JU-XXXXX Calculation No. Rev. Page Of No.

Customer Name:

Contract Name:

CTR Title CTR


No.
Calculation Summary
Calculation Title
File Ref: Criticality
Level:
Aim / Objective

Assumptions:

References (Include Revision/ Amendment/ Edition Numbers/ Software Used):

Results and Conclusions:

Revision History In-Discipline


Self Checked
Sign Check Approval Check
Rev. Reason for Revision
Date Sign Date Sign Date
0 Approved
LINE SIZING

Project
K07NC19004 Rev. A Page No. 10 of 13
No.
Project
REVIVAL OF GS-23-1 MONOPOD PLATFORM AT EASTERN OFFSHORE ASSETS
Title:
Document
K07NC19004-PR-A-REP-20029
No:

Ref. Calculation Rev.

INPUT VALUE
LINE SIZING / PRESSURE DROP CALC FOR LINE No.: 0 CALCULATED VALUE

INPUT DATA

OPERATING CONDITIONS: 1 2 3 4 5 6
Pressure P Barg 9.58 6.93 9.58 6.93 41.00 41.00
Temperature T Deg C 63.20 45.37 63.20 45.37 81.00 81.00

LIQUID FLOW DATA:


Flowrate Q liq m3/h
Density Rho liq kg/m3
Viscosity m cP
Surface Tension s dyne/cm

VAPOUR FLOW DATA


Flowrate M vap kg/h 700 700 700 700 72516 69531
Mol Wt. 24.120 23.800 24.120 23.800 22.020 22.020
Compressibility 0.964 0.969 0.964 0.969 0.907 0.907
Viscosity m cP 0.012 0.012 0.012 0.012 0.014 0.014
Cp/Cv 1.231 1.235 1.231 1.235 1.324 1.324
Inlet density Rho vap kg/m3 9.482 7.370 9.482 7.370 34.654 34.654
User Input kg/m3 9.48 7.37 9.48 7.37 34.65 34.65
LINE DATA
Input for pipe data SELECT Schedule Schedule Schedule Schedule Schedule Schedule
Line size (nominal) in 2 2 2 2 16 8
Pipe Spec
Schedule 40 40 40 40 80 80
Actual ID D mm 52.50 52.50 52.50 52.50 363.52 193.68
Elevation difference h m
Actual length m 1 1 1 1 1 1
Total equivalent length L m 1.0 1.0 1.0 1.0 1.0 1.0
Pipe Roughness e mm

Pipe Orientation Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal


Method (2 phase)

Dukler Dukler Dukler Dukler Dukler Dukler


Liquid State

CALCULATE

NOTES
1 Flowrates specified includes 10% margin.
2 The properties specified for Line hydraulic calculation is from Case 1 Max Oil 170 Sm 3/day and Gas 0.45 MMSCMD.
Validated Spreadsheet
PEC-BMS-EN-VSS-P-2550
Job No. Calculation No. Rev. Page Of No.

Customer
Name:
Contract
Name:

Ref. Calculation Rev.

FITTINGS DATA

L/D CASE 1 CASE 2 CASE 3 CASE 4 CASE 5 CASE 6


Shutdown valve 13.00 0.00 0.00 0.00 0.00 0.00 0.00

Ball valves (FB) 3.00 0.00 0.00 0.00 0.00 0.00 0.00

Ball valves (RB) (Dia>50mm) 45.00 0.00 0.00 0.00 0.00 0.00 0.00

Ball Valves (Dia< 40mm) 65.00 0.00 0.00 0.00 0.00 0.00 0.00

Elbows (90°, std rad) 30.00 0.00 0.00 0.00 0.00 0.00 0.00

Elbows (90°, long rad) 20.00 0.00 0.00 0.00 0.00 0.00 0.00

Elbows (45o) 16.00 0.00 0.00 0.00 0.00 0.00 0.00

Flow Branch Tee 65.00 0.00 0.00 0.00 0.00 0.00 0.00

Flow Thru' Run Tee 20.00 0.00 0.00 0.00 0.00 0.00 0.00

Gate valve (RB) (Dia<40mm) 65.00 0.00 0.00 0.00 0.00 0.00 0.00

Gate valve (FB) 13.00 0.00 0.00 0.00 0.00 0.00 0.00

Butterfly valve (2"-8") 45.00 0.00 0.00 0.00 0.00 0.00 0.00

Butterfly valve (10"-14") 35.00 0.00 0.00 0.00 0.00 0.00 0.00

Butterfly valve (16"-24") 25.00 0.00 0.00 0.00 0.00 0.00 0.00

Globe Valve (Y Pattern) 160.00 0.00 0.00 0.00 0.00 0.00 0.00

Globe valve (Angle pattern) 145.00 0.00 0.00 0.00 0.00 0.00 0.00

Globe valve 340.00 0.00 0.00 0.00 0.00 0.00 0.00

Entrance 64.00 0.00 0.00 0.00 0.00 0.00 0.00

Exit 32.00 0.00 0.00 0.00 0.00 0.00 0.00

Suction strainer 250.00 0.00 0.00 0.00 0.00 0.00 0.00

Swing check valve 135.00 0.00 0.00 0.00 0.00 0.00 0.00

Check Valve (Ball or Piston type) 340.00 0.00 0.00 0.00 0.00 0.00 0.00

Plug Valve 45.00 0.00 0.00 0.00 0.00 0.00 0.00

Bend , 900, R=4D 14.00 0.00 0.00 0.00 0.00 0.00 0.00

Bend , 900, R=5D 16.00 0.00 0.00 0.00 0.00 0.00 0.00

Bend , 1800, R=4D 25.00 0.00 0.00 0.00 0.00 0.00 0.00

Bend , 1800, R=5D 28.00 0.00 0.00 0.00 0.00 0.00 0.00

Expander (For Expander Enter the Higher Line Size in inches) 0.00 0.00 0.00 0.00 0.00 0.00

Reducer (For Reducer Enter the Lower Line Size in Inches) 0.00 0.00 0.00 0.00 0.00 0.00

Total Length (m) 0.00 0.00 0.0 0.0 0.0 0.0


LINE SIZING

Job No. K07NC19004 Rev. A Page No. 11 of 13

Customer
REVIVAL OF GS-23-1 MONOPOD PLATFORM AT EASTERN OFFSHORE ASSETS
Name:
Contract
K07NC19004-PR-A-REP-20029
Name:

Ref. Calculation Rev.


Line Particulars ---->
Case ------>
Stream No. 2"-GU-5302 2"-GU-5304 2"-GU-5305 2"-GU-5306 2"-GU-5308 2"-GU-5321
Phase Vapour Vapour Vapour Vapour Vapour Vapour
Pressure (bar(g)) 9.58 6.93 9.58 6.93 41.00 41.00
Temp (oC) 63.20 45.37 63.20 45.37 81.00 81.00
Elevation Diff (m)
Input' for line data Schedule Schedule Schedule Schedule Schedule Schedule
Liquid (Flow)
Flow Rate (m3/h)
Density (kg/m3)
Viscosity (cP)
Surface tension (dynes/cm)
Vapor (Flow kg/hr)
Flow Rate (kg/h) 700 700 700 700 72516 69531
Vapour Mol Wt. 24 24 24 24 22 22
Compressibility 1 1 1 1 1 1
Density (kg/m3) (Inlet) 9 7 9 7 35 35
Viscosity (cP) 0.012 0.012 0.012 0.012 0.014 0.014
Cp/Cv 1.231 1.235 1.231 1.235 1.324 1.324
Line Data:
Line Size (in) 2 2 2 2 16 8
Pipe Spec
Schedule 40 40 40 40 80 80
Pipe I.D. (mm) 52.50 52.50 52.50 52.50 363.52 193.68
Line Length (m) 1.00 1.00 1.00 1.00 1.00 1.00
Pipe Roughness (mm)
Pipe Orientation. (2 phase) Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal
Method (2 phase) Dukler Dukler Dukler Dukler Dukler Dukler
Pressure Drop Calc
Liquid
Velocity (m/s)
Pressure Out (bar(g))
Pressure Drop (Bar)
Pr. Drop/100m (bar)
Vapour
Velocity (m/s) 9.47 12.19 9.47 12.19 5.60 18.92
Press Out (bar(g)) 9.578 6.928 9.578 6.928 41.000 40.995
Pressure Drop (Bar) 1.6061E-03 2.0659E-03 1.6061E-03 2.0659E-03 1.9166E-04 4.5825E-03
Pr. Drop/100m (bar) 0.161 0.207 0.161 0.207 0.019 0.458
Vapor Density (Outlet) 9.480 7.370 9.480 7.370 34.650 34.650
RhoV^2 850.954 1094.579 850.954 1094.579 1087.035 12404.369
RhoV^3 8062.229 13339.417 8062.229 13339.417 6088.547 234698.554
Two Phase
Press Out (bar(g))
Pressure Drop (Bar)
Pr. Drop/100m (bar)
Mix Density
Mix Velocity
RhoV^2
RhoV^3
Ve (Erosion Velocity)
Allowable Limits
Liquid State
Pr. Dr/km
Velocity
RhoV^2 6000 6000 6000 6000 7500 7500
RhoV^3 150000 150000 150000 150000 150000 150000
Liquid Froude No.
Gas Froude No.
Flow Regime
Sonic Velocity 370.84811531292 364.830625257154 370.84811531292 364.830625257154 400.644273607423 400.644273607423
Outlet Mach No. 0.025547761770487 0.033404001611876 0.025547761770487 0.033404001611876 0.013980129392797 0.047225523987288
Re_Liq
Re_Gas 392962 392962 392962 392962 5075661 9134772
Validated Spreadsheet

Job No. Calculation No. Rev. Page Of No.

Customer
Name:
Contract
Name:

Ref. Calculation Rev.

LINE SIZING / PRESSURE DROP CALC FOR LINE No.: 0

RESULTS

LIQUID PHASE 1 2 3 4 5 6
Velocity m/s 0.000 0.000 0.000 0.000 0.000 0.000
Outlet pressure barg 0.000 0.000 0.000 0.000 0.000 0.000
Pressure drop bar 0.000 0.000 0.000 0.000 0.000 0.000
Delta P / 100m bar 0.000 0.000 0.000 0.000 0.000 0.000

VAPOUR PHASE
Velocity m/s 9.47 12.19 9.47 12.19 5.60 18.92
Outlet pressure barg 9.58 6.93 9.58 6.93 41.00 41.00
Pressure drop bar 1.606E-03 2.066E-03 1.606E-03 2.066E-03 1.917E-04 4.582E-03
Delta P / 100m bar 0.16 0.21 0.16 0.21 0.02 0.46
Outlet density kg/m3 9.48 7.37 9.48 7.37 34.65 34.65
Orientation Horizontal Horizontal Horizontal Horizontal Horizontal Horizontal

TWO-PHASE FLOW
Outlet pressure barg 0.00 0.00 0.00 0.00 0.00 0.00
Pressure drop bar 0.00 0.00 0.000 0.00 0.00 0.00
Delta P / 100m bar 0.00 0.00 0.00 0.00 0.00 0.00
Mixture density kg/m3 0.00 0.00 0.00 0.00 0.00 0.00
Mixture velocity m/s 0.00 0.00 0.00 0.00 0.00 0.00
Rho v2 kg/m.s2 0.0 0.00 0.0 0.00 0.00 0.00
Erosional velocity m/s 0.00 0.00 0.00 0.00 0.00 0.00
Flow regime
Sonic velocity m/s 370.848 364.831 370.848 364.831 400.644 400.644274
Outlet mach number 0.026 0.033 0.026 0.033 0.014 0.04722552
Orientation
Method used