2 Environmental - Internal Noise monitoring results higher than Complaint from the public - Apply TNB power supply at project
Monitoring baseline noise monitoring result beginning to reduce usage of genset
Stop work order and summon
from local council
3 Environmental - External Noise monitoring results higher than Complaint from the public -Conduct Noise monitoring by daily
Monitoring baseline noise monitoring result basis until piling works using drop
Stop work order and summon hammer finish
from local council
4 Environmental - Internal Lack of understanding of Scheduled Subcontractors do not dispose Brief on Schedule Waste Management
Knowledge Waste Management by scheduled wastes at designated during Induction training and toolbox.
Subcontractors disposal area Monitor and control during Environment
Inspection.
Non-compliance to scheduled
waste regulation.
5 Environmental - Internal Major spillage and leakage of oil Non-compliance to scheduled
Performance from company’s machinery waste regulation. -No company machinery at site.
6 Environmental - External Major spillage and leakage of oil Non-compliance to scheduled -Periodic inspection (Monthly) witness
Subcontractor from subcontractor’s machinery waste regulation. by HSSE.
-Daily inspection by operator