ITEM# ITEM DESCRIPTION UNITS QUANTITY

1 Supply of welded mesh for slab on grade sqm 12,905.00


2 Reinforced concrete, for Slab on grade 200 mm thick after compacti m3 2,570.00
3 Underground Fire Tank (concrete work) M3 96.00
4 Underground Water Tank (concrete work) M3 120.00
5 Underground Septic Tank (concrete work) M3 84.00
6 Underground Settling pond (concrete work) M3 1.00
7 Boundary wall sub structural works LM 466.00
8 Supply of deform bars TON 31.70
9 Supply and placing of concrete M3 170.00
10 supply of deform bars TON 1.00
11 Footing concrete M3 30.00
12 Column Neck concrete M3 3.00
13 Grade beam concrete M3 34.00
14 Slab on grade concrete M3 58.00
15 GF column concrete M3 7.00
16 GF roof slab M3 160.00
17 Super wall breaker in coc sqm 887.00
18 MGO boards or plastering sqm 5,400.00
19 False ceiling sqm 240.00
20 Supply of doors nos 36.00
21 Installation of doors nos 36.00
22 Supply of Almuium window and doors sqm 117.00
23 Supply of tile sqm 810.00
24 Fixing of tile sqm 810.00
25 Application of paint sqm 5,912.00
26 Roof water proofing sqm 448.00
27 Supply of steel rolled section for fence grill LS 70,470.00
28 Installation of fence grill LMT 482.00
29 Painting of fence grill LMT 482.00
30 Supply of steel rolled section and other accessories for sliding gates LS 30,000.00
31 Installation of sliding gates NOS 4.00
32 Painting of sliding gates NOS 4.00
33 Supply of super wall material M2 887.00
34 Installation of supperwall M2 887.00
35 Supply of MGO board M2 2,600.00
36 Fixing of MGO board M2 2,600.00
37 Supply of paint Material M2 2,600.00
38 Apllication of paint for hanger wall M2 2,600.00
39 Supply of roll up shutters PCS 4.00
40 installation of rull up shutter PCS 4.00
41 Supply of steel doors PCS 30.00
42 Installation of steel doors PCS 30.00
43 Fire fighting system L/S 1
44 supply of piping and other accessories LS 1
45 Installation of pipings LS 1
46 Supply of pumps with complete syatem LS 1
47 Installation of network and testing LS 1
48 Backfillin and formation for asphalt (without material) M2 5,383
49 Fixing of curbstone LMT 1,069
50 fixing of interlock M2 517
51 Supply and placing of Asphalt M2 5,383
52 Epoxy Flooring M2 5,000
TOTAL AMOUNT (SR)
UNIT PRICE IN SR. TOTAL PRICE IN SR. REMARKS

15.00 193,575.00 PENDING


320.00 822,400.00 PENDING
400.00 38,400.00 PENDING
400.00 48,000.00 50%
400.00 33,600.00 50%
400.00 400.00 PENDING
120.00 55,920.00 PENDING
3,000.00 95,100.00 PENDING
400.00 68,000.00 PENDING
3,000.00 3,000.00 PENDING
300.00 9,000.00 PENDING
300.00 900.00 PENDING
300.00 10,200.00 PENDING
250.00 14,500.00 PENDING
250.00 1,750.00 PENDING
300.00 48,000.00 PENDING
15.00 13,305.00 PENDING
12.00 64,800.00 PENDING
80.00 19,200.00 PENDING
2,500.00 90,000.00 PENDING
480.00 17,280.00 PENDING
450.00 52,650.00 PENDING
75.00 60,750.00 PENDING
15.00 12,150.00 PENDING
50.00 295,600.00 PENDING
80.00 35,840.00 PENDING
2.00 140,940.00 70%
50.00 24,100.00 30%
35.00 16,870.00 PENDING
- PENDING
1,800.00 7,200.00 PENDING
1,200.00 4,800.00 PENDING
45.00 39,915.00 PENDING
15.00 13,305.00 PENDING
40.00 104,000.00 PENDING
12.00 31,200.00 PENDING
40.00 104,000.00 PENDING
40.00 104,000.00 PENDING
20,000.00 80,000.00 PENDING
3,000.00 12,000.00 PENDING
3,500.00 105,000.00 PENDING
600.00 18,000.00 PENDING
300,000 300,000.00 PENDING
120,000 PENDING
36,000 PENDING
90,000 PENDING
18,000 PENDING
30 161,490.00 PENDING
12 12,826.44 PENDING
12 6,204.00 PENDING
100 538,300.00 PENDING
40 200,000.00 PENDING