What Is Agile Testing

Agile testing follows the principles of agile software development with continuous integration between development and testing. It includes test plans for each release, strategies like confirmatory and investigative testing across iterations, and focuses testing on functionality, usability, and non-functional requirements using the agile testing quadrants. Challenges include less documentation, compressed testing cycles, and changing QA roles.

Uploaded by

sharan kommi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views7 pages

What Is Agile Testing

Agile testing follows the principles of agile software development with continuous integration between development and testing. It includes test plans for each release, strategies like confirmatory and investigative testing across iterations, and focuses testing on functionality, usability, and non-functional requirements using the agile testing quadrants. Challenges include less documentation, compressed testing cycles, and changing QA roles.

Uploaded by

sharan kommi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

What is Agile Testing?

AGILE TESTING is a testing practice that follows the rules and principles of agile
software development. Unlike the Waterfall method, Agile Testing can begin at
the start of the project with continuous integration between development and
testing. Agile Testing methodology is not sequential (in the sense it’s executed
only after coding phase) but continuous.
In this article, we will discuss

 Agile Test Plan.


 Agile Testing Strategies.
 The Agile Testing Quadrant.
 QA challenges with agile software development.
 Risk of Automation in Agile Process.

Agile Test Plan


Agile test plan includes types of testing done in that iteration like test data
requirements, infrastructure, test environments, and test results. Unlike the
waterfall model, in an agile model, a test plan is written and updated for every
release. Typical test plans in agile includes

1. Testing Scope
2. New functionalities which are being tested
3. Level or Types of testing based on the features complexity
4. Load and Performance Testing
5. Infrastructure Consideration
6. Mitigation or Risks Plan
7. Resourcing
8. Deliverables and Milestones

Agile Testing Strategies


Agile testing life cycle spans through four stages
00:05/03:54
10 Sec
6.8M
73
10 Most Common Interview Questions and Answers ????
(a) Iteration 0

During the first stage or iteration 0, you perform initial setup tasks. It includes
identifying people for testing, installing testing tools, scheduling resources
(usability testing lab), etc. The following steps are set to achieve in Iteration 0

a) Establishing a business case for the project

b) Establish the boundary conditions and the project scope

c) Outline the key requirements and use cases that will drive the design trade-
offs

d) Outline one or more candidate architectures

e) Identifying the risk

f) Cost estimation and prepare a preliminary project

(b) Construction Iterations

The second phase of agile testing methodology is Construction Iterations, the


majority of the testing occurs during this phase. This phase is observed as a set
of iterations to build an increment of the solution. In order to do that, within
each iteration, the team implements a hybrid of practices from XP, Scrum,
Agile modeling, and agile data and so on.

In construction iteration, the agile team follows the prioritized requirement


practice: With each iteration, they take the most essential requirements
remaining from the work item stack and implement them.

Construction iteration is classified into two, confirmatory testing and


investigative testing. Confirmatory testing concentrates on verifying that the
system fulfills the intent of the stakeholders as described to the team to date,
and is performed by the team. While the investigative testing detects the
problem that confirmatory team has skipped or ignored. In Investigative
testing, tester determines the potential problems in the form of defect stories.
Investigative testing deals with common issues like integration testing,
load/stress testing, and security testing.

Again for, confirmatory testing there are two aspects developer


testing and agile acceptance testing. Both of them are automated to enable
continuous regression testing throughout the lifecycle. Confirmatory testing is
the agile equivalent of testing to the specification.

Agile acceptance testing is a combination of traditional functional testing and


traditional acceptance testing as the development team, and stakeholders are
doing it together. While developer testing is a mix of traditional unit testing and
traditional service integration testing. Developer testing verifies both the
application code and the database schema.
(c) Release End Game Or Transition Phase

The goal of “Release, End Game” is to deploy your system successfully into
production. The activities include in this phase are training of end users,
support people and operational people. Also, it includes marketing of the
product release, back-up & restoration, finalization of system and user
documentation.

The final agile methodology testing stage includes full system testing and
acceptance testing. In accordance to finish your final testing stage without any
obstacles, you should have to test the product more rigorously while it is in
construction iterations. During the end game, testers will be working on its
defect stories.

(d) Production
After the release stage, the product will move to the production stage.

Sponsored by Katalon.com

Simplify Test Automation


See More

The Agile Testing Quadrants

The agile testing quadrants separate the whole process in four Quadrants and
help to understand how agile testing is performed.

a) Agile Quadrant I – The internal code quality is the main focus in this
quadrant, and it consists of test cases which are technology driven and are
implemented to support the team, it includes

1. Unit Tests

2.Component Tests

b) Agile Quadrant II – It contains test cases that are business driven and are
implemented to support the team. This Quadrant focuses on the requirements.
The kind of test performed in this phase is

1. Testing of examples of possible scenarios and workflows


2. Testing of User experience such as prototypes

3. Pair testing

c) Agile Quadrant III – This quadrant provides feedback to quadrants one and
two. The test cases can be used as the basis to perform automation testing. In
this quadrant, many rounds of iteration reviews are carried out which builds
confidence in the product. The kind of testing done in this quadrant is

1. Usability Testing

2. Exploratory Testing

3. Pair testing with customers

4. Collaborative testing

5. User acceptance testing

d) Agile Quadrant IV – This quadrant concentrates on the non-functional


requirements such as performance, security, stability, etc. With the help of this
quadrant, the application is made to deliver the non-functional qualities and
expected value.

1. Non-functional tests such as stress and performance testing

2. Security testing with respect to authentication and hacking

3. Infrastructure testing

4. Data migration testing

5. Scalability testing

6. Load testing

QA challenges with agile software development


a) Chances of error are more in agile, as documentation is given less priority,
eventually puts more pressure on QA team

b) New features are introduced quickly, which reduces the available time for
test teams to identify whether the latest features are according to the
requirement and does it truly address the business suits
c) Testers are often required to play a semi-developer roled

d) Test execution cycles are highly compressed

e) Very less time to prepare test plan

f) For regression testing, they will have minimal timing

g) Change in their role from being a gate-keeper of quality to being a partner in


Quality

h) Requirement changes and updates are inherent in an agile method,


becoming the biggest challenge for QA

Risk of Automation in Agile Process


 Automated UI provides a high level of confidence, but they are slow to
execute, fragile to maintain and expensive to build. Automation may not
significantly improve test productivity unless the testers know how to test
 Unreliable tests are a major concern in automated testing. Fixing failing
tests and resolving issues related to brittle tests should be a top priority
in order to avoid false positives
 If the automated test are initiated manually rather than through CI
(Continuous Integration) then there is a risk that they are not regularly
running and therefore may cause failing of tests
 Automated tests are not a replacement for an exploratory manual testing.
To obtain the expected quality of the product, a mixture of testing types
and levels is required
 Many commercially available automation tools provide simple features
like automating the capture and replay of manual test cases. Such tool
encourages testing through the UI and leads to an inherently brittle and
difficult to maintain tests. Also, storing test cases outside the version
control system creates unnecessary complexity
 In order to save time, much times the automation test plan is poorly
planned or unplanned which results in the test fail
 A test set up and tear down procedures are usually missed out during test
automation, while Performing manual testing, a test set up and tear
down procedures sounds seamless
 Productivity metrics such as a number of test cases created or executed
per day can be terribly misleading, and could lead to making a large
investment in running useless tests
 Members of the agile automation team must be effective consultants:
approachable, cooperative, and resourceful, or this system will quickly
fail
 Automation may propose and deliver testing solutions that require too
much ongoing maintenance relative to the value provided
 Automated testing may lack the expertise to conceive and deliver
effective solutions
 Automated testing may be so successful that they run out of important
problems to solve, and thus turn to unimportant problems.

Conclusion
Agile methodology in software testing involves testing as early as possible in the
software development lifecycle. It demands high customer involvement and
testing code as soon as it becomes available. The code should be stable enough
to take it to system testing. Extensive regression testing can be done to make
sure that the bugs are fixed and tested. Mainly, Communication between the
teams makes agile model testing success!!!