114 Remaining Construction Work Schedule-20231206-A
114 Remaining Construction Work Schedule-20231206-A
114 Remaining Construction Work Schedule-20231206-A
23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9
24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Site Supervisor
Area Person In
SN. Description Description Construction Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE
Team
114 Oil Treatment Unit Area Target MC Completion Date 20231231 Changqingzeng 12/3/2023 1/24/2024
1.1.1 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 3 12/6/2023 12/8/2023
1.1.2 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 3 12/9/2023 12/11/2023
1.2.1 放线、开挖 Excavation Chang Qingzeng Sun Ying CIV 1 12/7/2023 12/7/2023
1.2.2 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 2 12/8/2023 12/9/2023
1.2.3 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 2 12/10/2023 12/11/2023
1.2.4 模板 Formwork Chang Qingzeng Sun Ying CIV 2 12/12/2023 12/13/2023
Concrete(Bottom Foundation and Pedestal be
1.2.5 混凝土(底板和短柱分两次浇筑) Chang Qingzeng Sun Ying CIV 2 12/14/2023 12/15/2023
Poured twice separately)
Concrete Curing、Formwork Removal、Bitumen
1.2.6 养护、拆模、刷漆 Chang Qingzeng Sun Ying CIV 2 12/16/2023 12/17/2023
Painting
1.2.7 回填 Backfilling Chang Qingzeng Sun Ying CIV 1 12/18/2023 12/18/2023
1.3.1 压实、钢筋、模板、埋件、混凝土(需中机清理场 Compaction、Rebar Chang Qingzeng Sun Ying CIV 5 12/8/2023 12/12/2023
地) work、Formwork、Embedded Parts、Concrete
1.3.2 养护 Concrete Curing Chang Qingzeng Sun Ying CIV 3 12/13/2023 12/15/2023
1.4.1 放线、开挖(人工开挖) Mannul Excavation Chang Qingzeng Sun Ying CIV 4 12/10/2023 12/13/2023
1.4.2 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 2 12/14/2023 12/15/2023
1.4.3 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 3 12/16/2023 12/18/2023
1.4.4 模板 Formwork Chang Qingzeng Sun Ying CIV 2 12/19/2023 12/20/2023
2.1 A3管廊格栅板、栏杆固定 Grating Plate 、Railing Fixed Chang Qingzeng Li Chengwei Structure 20 12/5/2023 12/25/2023
2.4 再循环泵泵棚 Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 12/25/2023 1/7/2024
2.4.2 泵棚安装完成 Instllation of Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 6 1/2/2024 1/7/2024
2.5 稳定塔塔底泵泵棚 Stabilizer Bottom Pump Shelter Chang Qingzeng Li Chengwei Structure 12/25/2023 1/9/2024
2.5.2 泵棚安装完成 Instllation of Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 6 1/4/2024 1/9/2024
2.6 各种操作平台 Installation of Operation Platform Chang Qingzeng Li Chengwei Structure 12/15/2023 1/9/2024 根据管道安装需求
4.2.2 稳定塔周围管道安装 Installation of AG Pipe around Stabilizer Chang Qingzeng 3 12/29/2023 12/31/2023
4.2.3 稳定塔保温脚手架搭设 Scaffording of Stabilizer for Insulation Chang Qingzeng Shi Yanbing PIP 12 1/1/2024 1/12/2024
4.2.4 稳定塔保温施工 Stabilizer Insulation Chang Qingzeng Shi Yanbing PIP 12 1/13/2024 1/24/2024
Installation of Support&AG pipe arround Medium-
4.3 换热器周围支架及管道安装 Chang Qingzeng Shi Yanbing PIP 7 12/19/2023 12/25/2023
Water Exchanger
5.1 电脱水尾项清理 Punchlist Clearing for Electrostatic Dehydrator Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
5.2 电脱盐尾项清理 Punchlist Clearing for Electrostatic Desalter Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
5.3 媒水换热器尾项清理 Punchlist Clearing for Medium-Water Exchanger Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
CPF-OIL Detail Construction Schedule
23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9
24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Site Supervisor
Area Person In
SN. Description Description Construction Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE
Team
5.4 稳定塔尾项清理 Punchlist Clearing for Stabilizer Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
5.5 再循环泵尾项清理 Punchlist Clearing for Recycle Pumps Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
5.6 稳定塔塔底泵尾项清理 Punchlist Clearing for Stabilizer Bottom Pumps Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
Xi Chunming/Jia
6 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Chang Qingzeng ELE/INT/TEL 12/3/2023 1/15/2024
Changyu
Xi Chunming/Jia
6.1 114再循环泵电缆桥架安装 Instllation of Cable Tray for 114 Recycle Pumps Chang Qingzeng ELE/INT/TEL 3 12/16/2023 12/18/2023
Changyu
Xi Chunming/Jia
6.2 114再循环泵电缆敷设及接线 Cable laying and Connetion for Recycle Pumps Chang Qingzeng ELE/INT/TEL 18 12/19/2023 1/5/2024
Changyu
Instllation of Cable Tray for Electrostatic Xi Chunming/Jia
6.3 电脱盐、电脱水电缆桥架安装 Dehydrator/Desalter
Chang Qingzeng
Changyu
ELE/INT/TEL 3 12/26/2023 12/28/2023