CPF-OIL Detail Construction Schedule

23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9

24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Site Supervisor
Area Person In
SN. Description Description Construction Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE
Team
114 Oil Treatment Unit Area Target MC Completion Date 20231231 Changqingzeng 12/3/2023 1/24/2024

1 Civil Civil Chang Qingzeng Sun Ying CIV 12/6/2023 12/25/2023

Pipe Support Foundation Inside Stabilizer


1.1 塔底泵泵棚内及周围支墩(包括稳定塔周围) Bottom Pump shelter&Around (Including Chang Qingzeng Sun Ying CIV 12/6/2023 12/18/2023
surround Stabilizer)

1.1.1 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 3 12/6/2023 12/8/2023

1.1.2 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 3 12/9/2023 12/11/2023

1.1.3 模板 Formwork Chang Qingzeng Sun Ying CIV 2 12/12/2023 12/13/2023

Concrete(Bottom Foundation and Pedestal be


1.1.4 混凝土(底板和短柱分两次浇筑) Chang Qingzeng Sun Ying CIV 2 12/14/2023 12/15/2023
Poured twice separately)
Concrete Curing、Formwork Removal、Bitumen
1.1.5 养护、拆模、刷漆 Chang Qingzeng Sun Ying CIV 2 12/16/2023 12/17/2023
Painting
1.1.6 回填 Backfilling Chang Qingzeng Sun Ying CIV 1 12/18/2023 12/18/2023

Platform foundation between Medium-Water


1.2 换热器与K管廊/A管廊之间平台支墩 Chang Qingzeng Sun Ying CIV 12/7/2023 12/18/2023
Heat Exchanger(114-E-09) and Piperack K/A

1.2.1 放线、开挖 Excavation Chang Qingzeng Sun Ying CIV 1 12/7/2023 12/7/2023
1.2.2 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 2 12/8/2023 12/9/2023
1.2.3 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 2 12/10/2023 12/11/2023
1.2.4 模板 Formwork Chang Qingzeng Sun Ying CIV 2 12/12/2023 12/13/2023
Concrete(Bottom Foundation and Pedestal be
1.2.5 混凝土(底板和短柱分两次浇筑) Chang Qingzeng Sun Ying CIV 2 12/14/2023 12/15/2023
Poured twice separately)
Concrete Curing、Formwork Removal、Bitumen
1.2.6 养护、拆模、刷漆 Chang Qingzeng Sun Ying CIV 2 12/16/2023 12/17/2023
Painting
1.2.7 回填 Backfilling Chang Qingzeng Sun Ying CIV 1 12/18/2023 12/18/2023

Floor Concrete Inside Recyle Pump shelter


1.3 114再循环泵泵棚内及周围地坪 Chang Qingzeng Sun Ying CIV 12/8/2023 12/15/2023
and surround

1.3.1 压实、钢筋、模板、埋件、混凝土(需中机清理场 Compaction、Rebar Chang Qingzeng Sun Ying CIV 5 12/8/2023 12/12/2023
地) work、Formwork、Embedded Parts、Concrete
1.3.2 养护 Concrete Curing Chang Qingzeng Sun Ying CIV 3 12/13/2023 12/15/2023

Support foudation between Electrostatic


1.4 电脱盐、电脱水与A管廊之间支墩施工(15个) Chang Qingzeng Sun Ying CIV 12/9/2023 12/25/2023
Dehydrator/Desalter and Piperack A(15 Nos)

1.4.1 放线、开挖(人工开挖) Mannul Excavation Chang Qingzeng Sun Ying CIV 4 12/10/2023 12/13/2023
1.4.2 压实、垫层施工 Compaction、Lean Concrete Chang Qingzeng Sun Ying CIV 2 12/14/2023 12/15/2023
1.4.3 放线、钢筋 Rebar Work Chang Qingzeng Sun Ying CIV 3 12/16/2023 12/18/2023
1.4.4 模板 Formwork Chang Qingzeng Sun Ying CIV 2 12/19/2023 12/20/2023

Concrete(Bottom Foundation and Pedestal be


1.4.5 混凝土(底板和短柱分两次浇筑) Chang Qingzeng Sun Ying CIV 2 12/21/2023 12/22/2023
Poured twice separately)

Concrete Curing、Formwork Removal、Bitumen


1.4.6 养护、拆模、刷漆 Chang Qingzeng Sun Ying CIV 2 12/23/2023 12/24/2023
Painting

1.4.7 回填 Backfilling Chang Qingzeng Sun Ying CIV 1 12/25/2023 12/25/2023

Backfilling of UG Pipe Trench below Piperack A in


1.5 114区域A管廊底地管管沟回填 Chang Qingzeng Sun Ying CIV 3 12/9/2023 12/11/2023
Unit 114 Area

Backfilling of UG Pipe Trench below Piperack K in


1.6 114区域K管廊底地管管沟回填 Chang Qingzeng Sun Ying CIV 3 12/13/2023 12/15/2023
Unit 114 Area

2 Structure Structure Chang Qingzeng Li Chengwei Structure 12/5/2023 12/29/2023

2.1 A3管廊格栅板、栏杆固定 Grating Plate 、Railing Fixed Chang Qingzeng Li Chengwei Structure 20 12/5/2023 12/25/2023

Intallation of valve operation platform for Meduim-


2.3 媒水换热器钢结构阀门操作平台安装 Chang Qingzeng Li Chengwei Structure 5 12/25/2023 12/29/2023
Water Heat Exchanger

2.4 再循环泵泵棚 Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 12/25/2023 1/7/2024

Instllation of Crane Track&Crane(Including


2.4.1 行车轨道及行车安装(含脚手架) Chang Qingzeng Li Chengwei Structure 8 12/25/2023 1/1/2024 根据行车到货
Scaffording)

2.4.2 泵棚安装完成 Instllation of Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 6 1/2/2024 1/7/2024

2.5 稳定塔塔底泵泵棚 Stabilizer Bottom Pump Shelter Chang Qingzeng Li Chengwei Structure 12/25/2023 1/9/2024

Instllation of Crane Track&Crane(Including


2.5.1 行车轨道及行车安装(含脚手架) Chang Qingzeng Li Chengwei Structure 10 12/25/2023 1/3/2024 根据行车到货
Scaffording)

2.5.2 泵棚安装完成 Instllation of Recycle Pump Shelter Chang Qingzeng Li Chengwei Structure 6 1/4/2024 1/9/2024

2.6 各种操作平台 Installation of Operation Platform Chang Qingzeng Li Chengwei Structure 12/15/2023 1/9/2024 根据管道安装需求

3 UG Piping UG Pipe Chang Qingzeng Shi Yanbing PIP 12/11/2023 12/12/2023

Hydrotest of Branch UG pipe front Stabilizer


3.1 塔底泵泵棚前地管分支试压 Chang Qingzeng Shi Yanbing 2 12/11/2023 12/12/2023
Bottom Pump

4 AG Pipe AG Pipe Chang Qingzeng Shi Yanbing PIP 12/16/2023 1/24/2024

Instllation of Support&AG Pipe inside Stabilizer


4.1 塔底泵泵棚内及周围支架及管道安装 Chang Qingzeng Shi Yanbing PIP 7 12/19/2023 12/25/2023
Bottom Pump and Around
Installation of AG Pipe and Insulation arround
4.2 稳定塔周围管道及保温施工 Chang Qingzeng Shi Yanbing PIP 12/16/2023 1/24/2024
Stabilizer
4.2.1 稳定塔管道脚手架搭设 Scaffording of Stabilizer for AG pipe Chang Qingzeng Shi Yanbing PIP 3 12/26/2023 12/28/2023

4.2.2 稳定塔周围管道安装 Installation of AG Pipe around Stabilizer Chang Qingzeng 3 12/29/2023 12/31/2023

4.2.3 稳定塔保温脚手架搭设 Scaffording of Stabilizer for Insulation Chang Qingzeng Shi Yanbing PIP 12 1/1/2024 1/12/2024

4.2.4 稳定塔保温施工 Stabilizer Insulation Chang Qingzeng Shi Yanbing PIP 12 1/13/2024 1/24/2024
Installation of Support&AG pipe arround Medium-
4.3 换热器周围支架及管道安装 Chang Qingzeng Shi Yanbing PIP 7 12/19/2023 12/25/2023
Water Exchanger

Installation of Support&AG pipe inside Recycle


4.4 114再循环泵泵棚内及周围支架及管道安装 Chang Qingzeng Shi Yanbing PIP 7 12/16/2023 12/22/2023
Pump shelter and arround

5 设备 Mechanical Chang Qingzeng Lian Junhai 12/15/2023 12/31/2023

5.1 电脱水尾项清理 Punchlist Clearing for Electrostatic Dehydrator Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023

5.2 电脱盐尾项清理 Punchlist Clearing for Electrostatic Desalter Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023

5.3 媒水换热器尾项清理 Punchlist Clearing for Medium-Water Exchanger Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023
CPF-OIL Detail Construction Schedule

23/12/10
23/12/11
23/12/12
23/12/13
23/12/14
23/12/15
23/12/16
23/12/17
23/12/18
23/12/19
23/12/20
23/12/21
23/12/22
23/12/23
23/12/24
23/12/25
23/12/26
23/12/27
23/12/28
23/12/29
23/12/30
23/12/31
23/12/1
23/12/2
23/12/3
23/12/4
23/12/5
23/12/6
23/12/7
23/12/8
23/12/9

24/1/10
24/1/11
24/1/12
24/1/13
24/1/14
24/1/15
24/1/16
24/1/17
24/1/18
24/1/19
24/1/20
24/1/21
24/1/22
24/1/23
24/1/24
24/1/25
24/1/1
24/1/2
24/1/3
24/1/4
24/1/5
24/1/6
24/1/7
24/1/8
24/1/9
Site Supervisor
Area Person In
SN. Description Description Construction Discipline Duration Plan Start Plan Finish Actual Start Actual Finish Remark
Charge CAMCE
Team
5.4 稳定塔尾项清理 Punchlist Clearing for Stabilizer Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023

5.5 再循环泵尾项清理 Punchlist Clearing for Recycle Pumps Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023

5.6 稳定塔塔底泵尾项清理 Punchlist Clearing for Stabilizer Bottom Pumps Chang Qingzeng Lian Junhai EQ 16 12/15/2023 12/31/2023

Xi Chunming/Jia
6 Electrical and Instrument/Telecom Electrical and Instrument/Telecom Chang Qingzeng ELE/INT/TEL 12/3/2023 1/15/2024
Changyu
Xi Chunming/Jia
6.1 114再循环泵电缆桥架安装 Instllation of Cable Tray for 114 Recycle Pumps Chang Qingzeng ELE/INT/TEL 3 12/16/2023 12/18/2023
Changyu
Xi Chunming/Jia
6.2 114再循环泵电缆敷设及接线 Cable laying and Connetion for Recycle Pumps Chang Qingzeng ELE/INT/TEL 18 12/19/2023 1/5/2024
Changyu
Instllation of Cable Tray for Electrostatic Xi Chunming/Jia
6.3 电脱盐、电脱水电缆桥架安装 Dehydrator/Desalter
Chang Qingzeng
Changyu
ELE/INT/TEL 3 12/26/2023 12/28/2023

Cabe Laying and Connection for Electrostatic Xi Chunming/Jia


6.4 电脱盐、电脱水电缆敷设及接线 Dehydrator/Desalter
Chang Qingzeng
Changyu
ELE/INT/TEL 18 12/29/2023 1/15/2024

Installation of Cable Tray for Stabilizer Bottom Xi Chunming/Jia


6.5 塔底泵电缆桥架安装 Pumps
Chang Qingzeng
Changyu
ELE/INT/TEL 3 12/19/2023 12/21/2023

Cable Laying and Connection for Stabilizer Xi Chunming/Jia


6.6 塔底泵电缆敷设及接线 Bottom Pumps
Chang Qingzeng
Changyu
ELE/INT/TEL 22 12/22/2023 1/12/2024

Installation of Cable Tray for Medium-Water Xi Chunming/Jia


6.7 媒水换热器换热器电缆桥架安装 Exchanger
Chang Qingzeng
Changyu
ELE/INT/TEL 2 12/19/2023 12/20/2023

Cable Laying and Connection for Medium-Water Xi Chunming/Jia


6.8 电缆敷设及接线 Exchanger
Chang Qingzeng
Changyu
ELE/INT/TEL 5 12/21/2023 12/25/2023

路灯基础开挖、就位(22盏灯),只有示意图,无 Lighting foundation excavation、in place(no


6.9 平面布置图,需设计现场确定位置,出红线图,12 layout draws ,need design to confirm Chang Qingzeng Sun Ying CIV 4 12/9/2023 12/12/2023
月6日现场核实。 location,redmark.)
Xi Chunming/Jia
6.10 照明 Installation of lighting fixture Chang Qingzeng
Changyu
ELE/INT/TEL 12/3/2023 1/14/2024