0% found this document useful (0 votes)
24 views2 pages

PTR 2

Uploaded by

petroexams
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views2 pages

PTR 2

Uploaded by

petroexams
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

Thermal expansion and contraction for different temperatures is


given in Table C-1. To determine total expansion net effect shall
be considered.

2. Working pressure for flanges and flanged fittings can be read


from pressure-temperature ratings of flange. The hydrostatic
test pressure is taken as 1.5 times the pressure rating at 100º F,
rounded to the next 25 psi.

3. “Repair” on piping system means work necessary to restore a


piping system to the design conditions.

4. “Alteration” means any change in piping components that affects


the design conditions.

5. API 570 shall not be used for new construction. It shall not
violate jurisdiction requirements.

6. Authorized inspection agency means any of the following:

a. Inspection organization of jurisdiction


b. Inspection organization authorized by
jurisdiction
c. Inspection organization of owner user
d. Inspection organization or contracted by owner
user
e. Inspection organization of insurance company
that undertakes insurance of piping system

7. Repair Organization means any of the following:

a. Owner user who repairs or alters his own piping


b. A contractor authorized by owner user and who
carries out work as per API 570

____________________________________________________________________________________________________________
c. Organization authorized/accepted or not prohibited by
jurisdiction and who carries out work in accordance with
API 570

8. Ultimate responsibility for executing the work as per API 570


rests with owner/user.

9. Soil-to-Air interface is subjected to combined action


from atmosphere as well as soil, and is taken up to 6”
above and 12” below the soil.

10. Deadlegs means piping components where there is no significant


flow (almost stagnant fluid).

11. Piping Circuit is part of piping system which is subjected to


similar corrosivity.

12. Piping system is the piping subjected to same design conditions.

13. Examiner is NDT person who assists the API 570 inspector but
does not decide acceptance / rejection of NDT results.

14. Risk Based Inspection (RBI) means: Assessment of likelihood of


failure and consequences of failure and evolving inspection
scheme keeping in view both.

15. Injection points may cause accelerated or localized corrosion.


During scheduled inspections, extensive inspection should be
applied beginning 12 inches upstream.

16. Deadlegs: Stagnant liquids in deadlegs can cause more corrosion


than the active piping in the process.
---------------------------------------End--------------------------------------