0% found this document useful (0 votes)
24 views3 pages

Gant Chart For Substation Uprating

Timeline of Activities

Uploaded by

kongkix5601
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
24 views3 pages

Gant Chart For Substation Uprating

Timeline of Activities

Uploaded by

kongkix5601
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 3
Proposed Program of Works / Gantt Chart Customer Zamboanga del Sur Il Electric Cooperative, Inc. Project Name: Uprating of Imelda jon Power Transformer Project Location: Bray. Sta. Barbara, Imelda, Zamboanga Sibugay Date 1 (Wait for Approved Power interruption Schedule) - 16 Hours Item Work Schedule a Work Description Remarkis Frectrocare & 1. | Safety Meeting and Work Briefing / Orientation Rad JOPENING of Automatic Orcut Recloser- TS2kV Side 2 | Goth Existing 10MVA & SMVA Tr) sea Disconnection Switch 13 2KV Sides, 3 |(Goth Existing 1OMVA & SMVA Tr) eee [OPENING of Power Circuit Breaker= GOKV Sides, (Bath 4 |existing 10MVA & SMVA Te) eee JOPENING of Disconnection Switch -6ORV Sides, (Both : © existing 1OMvA & SMVA Te) ee OO ~ | Tapping of Grounding Clusters at- 5RV Sides, (Goth Fractrocare & Existing 10MVA & SMVA Tr) ZAMSURECO-I, ry Disconnection of Al Overhead Lines areal ‘eitioce 7 Jabove of both Existing 1OMVA & SMVA Trt pores [Disconnection of HV and LV Bushing Terminal Leads of PaaS both Existing 10MVA & SMVA Trt FTemporary Disconnection of Control and Protection © |Wires of both Existing 10MVA & SMVA Tit eel FTemporary Disconnection of Grounding Wires of bath — 1° |existing 1OMVA & SMVA Tet eer Liting and Transfer of Existing TOMVA Ta To Temporary = ™ Iisolated Area eae "p |liting and Transfer of Existing BNIVA TH Temporary ae ral in) of New TOMVA Ti fo Avalabie OT Seay jain of New TOMVA Ta To Existing a 4 |suiva Transformer Concrete Mounting Pad oy 18 Etectrocare 7e [Reconnection of Al Overhead Lines directly above of Pare both Existing 10MVA & New 1OMVA Trt [Reconnection of HV and LV Bushing Terminal Leads of 17 [essing tomva Tet cece [Reconnection of Control and Protection Wires of "8 |esisting toMvA Tit epic to [Reconnection of crcuncng Wires of Exsing TORR re [Tapping of Loop / Jumper Leads for Temporary Load 20 lrranster from M6 io Mé i eae 721 [Removal of Grounding Clusters - 69KV Side of Existing ‘| Biectrocare & HOMVA Tif - M4 ZAMSURECO-H1 a [CLOSING of Disconnection Switch - BOK Side of leas Existing 10MVA Trt - Ma ICLOSING of Power Circuir Breaker 69KV Side of Existing 1OMVA Trt - M4 IGLOSING of Disconnection Switch - 13.2KV Side of [Existing 1OMVA Trt M4 [CLOSING of Auiomatic Circuit Recioser (AGA) - 13 2kV] 25 | Side of Existing 1OMVA Te - M4. -| ZAMSURECO-II 26 it Refil of New 1OMVA Tit Electrocare 27 [Testing of New 10MVA Tit Electrocare 28 {01 Filtering, Heating & Degassing of New 10MVA Tet Electrocare [Reconnection of Control and Protection Wires of New 29 roma Tt Electrocare Functional & Simulation Testing of Control & Protection 20 lof Electrical Devices of New 1OMVA Tr eats “1 [Functional & Simulation Testing of Control & Protecion ae lof Mechanical Devices of New 10MVA Trt acne Fectrocare & 32 |Field Test Report Preparation and Submission to NGCP| acto [Reconnection of HV and LV Bushing Terminal Leads of 33 |New 10MVA Tet Electrocare 34 | Reconnection of Grounding Wires of New 10MVA Trt Electrocare [OPENING of Aulomatic Circut Redloser- TS.2KV Side $8 lot Existing 1OMVA Trt - M4 ZAMS USEC, JOPENING of Disconnection Switch - 13 2kV Side of 26 |eisting 1OMVA Trt - M4 ZAMSURECO-II 237 OPENING of Power Circuit Breaker -GOKV Side of eT xis 4OMVA Trt M4 IG of Disconnection Switch - 6OKV Side of 4OMVA T= Ma ZAMSUREC Te Grounding Clusters at GOKV Side of [Existing 10MVA Tit M4 Blecirocare & ZAMSURECO-I) [Transfer of Loop Tapping / Jumpar Leads back to ME Loading (now, New 10MVA Tf) | ZAMSURECO-II [Removal of Grounding Clusters - GOK Side of Existing Flectrocare & HOMVA Trf - Ma. ZAMSURECO-I! [CLOSING of Disconnection Switch - BOKV Side of [Existing 10MVA Tef - M4 ZAMSURECO-1| ICLOSING of Power Circuir Breaker GOKV Side of Existing 1OMVA Trt - M4 ZAMSURECO-II [CLOSING of Disconnection Switch - 1S 2kV Side of [Existing 1OMVA Tet - Ma ZAMSURECO-1| [CLOSING of Automatic Circuit Recloser (ACR) - 13 2KV] Side of Existing 10MVA Tif - M4 ZAMSURECO-II [Removal of Grounding Clusters ~B9KV Side of New Electrocare & HOMVA Tet - M6 ZAMSURECO-I [CLOSING of Disconnection Switch - GOKV Side of New 1OMVA Trf with NGCP Clearance - M5 ZAMSURECO-I1 [CLOSING of Power Circuir Breaker - 69KV Side of New HOMVA Tet - M6 ZAMSURECO-1/ [CLOSING of Disconnection Switch - TS.2KV Side of Now 1OMVA Tet - M6 ZAMSURECO-II CLOSING of Automatic Circuit Recleser (ACR) - 15 2KV] Side of New 10MVA Trf = ZAMSURECO-II 8 and Equipment of both M4 & M6 (Energization to Normal Operation) ZAMSURECO-II Operation Briefing for M6 New Control and Protection Panel and Turnover Housekeeping Works

You might also like