Timeline of Activities
Uploaded by
kongkix5601
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save GANT CHART FOR SUBSTATION UPRATING For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
0 ratings
0% found this document useful (0 votes)
24 views
3 pages
Gant Chart For Substation Uprating
Timeline of Activities
Uploaded by
kongkix5601
AI-enhanced title
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save GANT CHART FOR SUBSTATION UPRATING For Later
Share
0%
0% found this document useful, undefined
0%
, undefined
Print
Embed
Report
Download
Save GANT CHART FOR SUBSTATION UPRATING For Later
You are on page 1
/ 3
Search
Fullscreen
Proposed Program of Works / Gantt Chart Customer Zamboanga del Sur Il Electric Cooperative, Inc. Project Name: Uprating of Imelda jon Power Transformer Project Location: Bray. Sta. Barbara, Imelda, Zamboanga Sibugay Date 1 (Wait for Approved Power interruption Schedule) - 16 Hours Item Work Schedule a Work Description Remarkis Frectrocare & 1. | Safety Meeting and Work Briefing / Orientation Rad JOPENING of Automatic Orcut Recloser- TS2kV Side 2 | Goth Existing 10MVA & SMVA Tr) sea Disconnection Switch 13 2KV Sides, 3 |(Goth Existing 1OMVA & SMVA Tr) eee [OPENING of Power Circuit Breaker= GOKV Sides, (Bath 4 |existing 10MVA & SMVA Te) eee JOPENING of Disconnection Switch -6ORV Sides, (Both : © existing 1OMvA & SMVA Te) ee OO ~ | Tapping of Grounding Clusters at- 5RV Sides, (Goth Fractrocare & Existing 10MVA & SMVA Tr) ZAMSURECO-I, ry Disconnection of Al Overhead Lines areal ‘eitioce 7 Jabove of both Existing 1OMVA & SMVA Trt pores [Disconnection of HV and LV Bushing Terminal Leads of PaaS both Existing 10MVA & SMVA Trt FTemporary Disconnection of Control and Protection © |Wires of both Existing 10MVA & SMVA Tit eel FTemporary Disconnection of Grounding Wires of bath — 1° |existing 1OMVA & SMVA Tet eer Liting and Transfer of Existing TOMVA Ta To Temporary = ™ Iisolated Area eae "p |liting and Transfer of Existing BNIVA TH Temporary ae ral in) of New TOMVA Ti fo Avalabie OT Seay jain of New TOMVA Ta To Existing a 4 |suiva Transformer Concrete Mounting Pad oy 18 Etectrocare 7e [Reconnection of Al Overhead Lines directly above of Pare both Existing 10MVA & New 1OMVA Trt[Reconnection of HV and LV Bushing Terminal Leads of 17 [essing tomva Tet cece [Reconnection of Control and Protection Wires of "8 |esisting toMvA Tit epic to [Reconnection of crcuncng Wires of Exsing TORR re [Tapping of Loop / Jumper Leads for Temporary Load 20 lrranster from M6 io Mé i eae 721 [Removal of Grounding Clusters - 69KV Side of Existing ‘| Biectrocare & HOMVA Tif - M4 ZAMSURECO-H1 a [CLOSING of Disconnection Switch - BOK Side of leas Existing 10MVA Trt - Ma ICLOSING of Power Circuir Breaker 69KV Side of Existing 1OMVA Trt - M4 IGLOSING of Disconnection Switch - 13.2KV Side of [Existing 1OMVA Trt M4 [CLOSING of Auiomatic Circuit Recioser (AGA) - 13 2kV] 25 | Side of Existing 1OMVA Te - M4. -| ZAMSURECO-II 26 it Refil of New 1OMVA Tit Electrocare 27 [Testing of New 10MVA Tit Electrocare 28 {01 Filtering, Heating & Degassing of New 10MVA Tet Electrocare [Reconnection of Control and Protection Wires of New 29 roma Tt Electrocare Functional & Simulation Testing of Control & Protection 20 lof Electrical Devices of New 1OMVA Tr eats “1 [Functional & Simulation Testing of Control & Protecion ae lof Mechanical Devices of New 10MVA Trt acne Fectrocare & 32 |Field Test Report Preparation and Submission to NGCP| acto [Reconnection of HV and LV Bushing Terminal Leads of 33 |New 10MVA Tet Electrocare 34 | Reconnection of Grounding Wires of New 10MVA Trt Electrocare [OPENING of Aulomatic Circut Redloser- TS.2KV Side $8 lot Existing 1OMVA Trt - M4 ZAMS USEC, JOPENING of Disconnection Switch - 13 2kV Side of 26 |eisting 1OMVA Trt - M4 ZAMSURECO-II 237 OPENING of Power Circuit Breaker -GOKV Side of eT xis 4OMVA Trt M4 IG of Disconnection Switch - 6OKV Side of 4OMVA T= Ma ZAMSUREC Te Grounding Clusters at GOKV Side of [Existing 10MVA Tit M4 Blecirocare & ZAMSURECO-I)[Transfer of Loop Tapping / Jumpar Leads back to ME Loading (now, New 10MVA Tf) | ZAMSURECO-II [Removal of Grounding Clusters - GOK Side of Existing Flectrocare & HOMVA Trf - Ma. ZAMSURECO-I! [CLOSING of Disconnection Switch - BOKV Side of [Existing 10MVA Tef - M4 ZAMSURECO-1| ICLOSING of Power Circuir Breaker GOKV Side of Existing 1OMVA Trt - M4 ZAMSURECO-II [CLOSING of Disconnection Switch - 1S 2kV Side of [Existing 1OMVA Tet - Ma ZAMSURECO-1| [CLOSING of Automatic Circuit Recloser (ACR) - 13 2KV] Side of Existing 10MVA Tif - M4 ZAMSURECO-II [Removal of Grounding Clusters ~B9KV Side of New Electrocare & HOMVA Tet - M6 ZAMSURECO-I [CLOSING of Disconnection Switch - GOKV Side of New 1OMVA Trf with NGCP Clearance - M5 ZAMSURECO-I1 [CLOSING of Power Circuir Breaker - 69KV Side of New HOMVA Tet - M6 ZAMSURECO-1/ [CLOSING of Disconnection Switch - TS.2KV Side of Now 1OMVA Tet - M6 ZAMSURECO-II CLOSING of Automatic Circuit Recleser (ACR) - 15 2KV] Side of New 10MVA Trf = ZAMSURECO-II 8 and Equipment of both M4 & M6 (Energization to Normal Operation) ZAMSURECO-II Operation Briefing for M6 New Control and Protection Panel and Turnover Housekeeping Works
You might also like
HWX Manual PDF
PDF
67% (9)
HWX Manual PDF
16 pages
Maintenance Procedure For Substations and Switchgear
PDF
No ratings yet
Maintenance Procedure For Substations and Switchgear
7 pages
ANNUAL Maintenance Format
PDF
No ratings yet
ANNUAL Maintenance Format
7 pages
Work Instruction Sheet (WIS) : SL No. Action Plan Responsibility
PDF
No ratings yet
Work Instruction Sheet (WIS) : SL No. Action Plan Responsibility
3 pages
Tayug I Substation Operating Procedures and Guidelines
PDF
No ratings yet
Tayug I Substation Operating Procedures and Guidelines
6 pages
Null 1
PDF
No ratings yet
Null 1
10 pages
Null 2
PDF
No ratings yet
Null 2
11 pages
Substations Maintenance Plan
PDF
No ratings yet
Substations Maintenance Plan
8 pages
Mos Coring
PDF
No ratings yet
Mos Coring
17 pages
MRT SS Operator General Guide-1
PDF
No ratings yet
MRT SS Operator General Guide-1
9 pages
Manual Cubicle 20kV Siemens
PDF
No ratings yet
Manual Cubicle 20kV Siemens
10 pages
HT - LT - Comm
PDF
No ratings yet
HT - LT - Comm
38 pages
Mwakibete Substation-Final Report
PDF
No ratings yet
Mwakibete Substation-Final Report
6 pages
Isolation and Earthing
PDF
No ratings yet
Isolation and Earthing
7 pages
Substation Maintenance Section Presentation Draft
PDF
No ratings yet
Substation Maintenance Section Presentation Draft
49 pages
SWMS Electrical-1
PDF
No ratings yet
SWMS Electrical-1
4 pages
Main Distribution Board MDB Testing
PDF
No ratings yet
Main Distribution Board MDB Testing
3 pages
4 Patpka#-Yvxv, : Circuit-Breaker IZM
PDF
No ratings yet
4 Patpka#-Yvxv, : Circuit-Breaker IZM
42 pages
Disjuntor Caixa Aberta Izm Moeller Eaton
PDF
No ratings yet
Disjuntor Caixa Aberta Izm Moeller Eaton
266 pages
FLS Ferds
PDF
No ratings yet
FLS Ferds
34 pages
General Back Ground of Switchyard: Presenter: Sonam Tobgay Head, Smu
PDF
No ratings yet
General Back Ground of Switchyard: Presenter: Sonam Tobgay Head, Smu
38 pages
Rdeeps233418 Wycliffe Ochieng Attachment Work Report
PDF
No ratings yet
Rdeeps233418 Wycliffe Ochieng Attachment Work Report
42 pages
Format-II Punch Points of 6.6 0.433kV, 2.5MVA, ONAN, DYN11, DISTRIBUTION TRANSFORMER
PDF
No ratings yet
Format-II Punch Points of 6.6 0.433kV, 2.5MVA, ONAN, DYN11, DISTRIBUTION TRANSFORMER
10 pages
Monthly Work Report
PDF
No ratings yet
Monthly Work Report
13 pages
Check List
PDF
No ratings yet
Check List
36 pages
Switchyard O&m Final
PDF
100% (4)
Switchyard O&m Final
73 pages
Elite Precommissioning Procedures and Formats For SS Bay Equipment
PDF
100% (2)
Elite Precommissioning Procedures and Formats For SS Bay Equipment
92 pages
Operating Sequence of On Load Tap Changer: Changing Back and Forth Between Tap Positions 2 and 3
PDF
No ratings yet
Operating Sequence of On Load Tap Changer: Changing Back and Forth Between Tap Positions 2 and 3
25 pages
Accountabily Sheet.
PDF
No ratings yet
Accountabily Sheet.
170 pages
Switching Procedure & Maintenance Proceedures 2020 - Phoenix
PDF
No ratings yet
Switching Procedure & Maintenance Proceedures 2020 - Phoenix
6 pages
Electrical PM Checklists and Formats
PDF
No ratings yet
Electrical PM Checklists and Formats
10 pages
ATS, GEDP, Grounding Etc
PDF
No ratings yet
ATS, GEDP, Grounding Etc
52 pages
Identifying Training Gaps
PDF
No ratings yet
Identifying Training Gaps
2 pages
Areva - HWX VCB - Installation Operation & Maintenance Manual
PDF
81% (16)
Areva - HWX VCB - Installation Operation & Maintenance Manual
16 pages
MWCI Replacement of 4MVA Transformer - Rev.1
PDF
No ratings yet
MWCI Replacement of 4MVA Transformer - Rev.1
1 page
Checklist For Construction Testing and Turnover
PDF
No ratings yet
Checklist For Construction Testing and Turnover
19 pages
107-125 Check Sheet
PDF
No ratings yet
107-125 Check Sheet
19 pages
7-JSA - 33 - KV - HT - Panel Breaker Maintennece
PDF
50% (2)
7-JSA - 33 - KV - HT - Panel Breaker Maintennece
17 pages
Automatic Reclosing CT VT Presentation v2
PDF
No ratings yet
Automatic Reclosing CT VT Presentation v2
10 pages
PSSC V2 U20 PoleMountedSubstationMaintenance FG V1.0
PDF
No ratings yet
PSSC V2 U20 PoleMountedSubstationMaintenance FG V1.0
6 pages
Transformer Installation Caylor
PDF
No ratings yet
Transformer Installation Caylor
2 pages
Question 1 2 3 4 5 6
PDF
No ratings yet
Question 1 2 3 4 5 6
7 pages
SWGR Maint & Testing
PDF
No ratings yet
SWGR Maint & Testing
47 pages
Projects by Techworx Industrial Services
PDF
No ratings yet
Projects by Techworx Industrial Services
4 pages
MV Switchgear Operation Procedure and Interlock Condition: Unit 4
PDF
No ratings yet
MV Switchgear Operation Procedure and Interlock Condition: Unit 4
58 pages
Non Outage TNB MOS (Sample)
PDF
100% (1)
Non Outage TNB MOS (Sample)
39 pages
Check List of 6.6kv Panel
PDF
100% (2)
Check List of 6.6kv Panel
22 pages
Format For Data Collection Name of Project: Name of Substation
PDF
No ratings yet
Format For Data Collection Name of Project: Name of Substation
3 pages
Objectives of Report Writing
PDF
No ratings yet
Objectives of Report Writing
9 pages
AMW Services SDN BHD Presentation - 9. January 2012-New
PDF
No ratings yet
AMW Services SDN BHD Presentation - 9. January 2012-New
26 pages
MS - LVAC Cable Sleve Installation Works
PDF
No ratings yet
MS - LVAC Cable Sleve Installation Works
17 pages
Task List Electrical
PDF
No ratings yet
Task List Electrical
64 pages
Mondelez Report
PDF
No ratings yet
Mondelez Report
11 pages
MSG Transformer 130422
PDF
No ratings yet
MSG Transformer 130422
21 pages
Minimum Clearences in Substations
PDF
No ratings yet
Minimum Clearences in Substations
5 pages
2 Check List For 4.16KV VCB
PDF
0% (1)
2 Check List For 4.16KV VCB
6 pages