The document outlines 30 tasks to develop a software solution for a client, including conducting interviews, designing prototypes, developing algorithms, testing functionality, and getting client feedback. The tasks are assigned target dates and evaluated against criteria.

Uploaded by

akilanramesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views5 pages

Crit B Record of Tasks

The document outlines 30 tasks to develop a software solution for a client, including conducting interviews, designing prototypes, developing algorithms, testing functionality, and getting client feedback. The tasks are assigned target dates and evaluated against criteria.

Uploaded by

akilanramesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Criterion B: Record of tasks

Task Target
Planned action Planned outcome Time estimated Criterion
number completion date

1 Receive
Interview 1 with information about
30 minutes March 3rd A
Ms. Jaya the issue she is
facing

2 Listen to the
Producing a
interview again to
problem 30 minutes March 3rd A
produce a problem
statement
statement

3 Determine a
general course of
Abstract rationale
action for product
for a proposed 1 hour March 5th A
development and
product
the questions to
ask in interview 2

4 Produce questions
that are relevant
Preparation for to the proposed
30 Minutes March 6th A
Interview 2 solution and
questions in
general

5 Discuss the
proposed solution
Interview 2 with curtly and receive
30 Minutes March 8th A
Ms. Jaya information about
computer
specifics, etc.

6 Determine the
specifics and
Concrete whether the
Rationale for the initially proposed 1 hour March 9th A
proposed solution solution is suitable
for the specified
problem
7 Using the
Determining interviews 1 and 2
1 hour March 9th A
Success Criteria formulate a list of
success criterion

8 For viewing and


Flow Chart improving the logic
1 hour March 13th B
Diagram of proposed
rationale

9 To visualize and
Data Flow improving the flow
1 hour March 13th B
Diagrams of data within the
proposed solution

10 Determining the
Ethical
ethicality of the 5 minutes March 13th B
Considerations
planned data flow

11 Planning the
authorization and
Backend Design authentication for 30 minutes March 20th B
data access and
storage planning

12 Developing a
prototype UI to
Front End
test the best
Prototyping/ 1 hour March 21st B
design for optimal
Design
useability and
efficiency

13 Using the
information from
UI Design the prototype to 30 minutes March 21st B
develop a better
UI

14 Testing plan based


Testing plan on success criteria 30 minutes March 21st B
and otherwise

15 Producing a
chronological plan
Record of tasks for the progress of 1 hour March 23rd B
developing the
solution and the IA
16 By either building
on the prototype
or making it from
Finishing the UI 2 hours March 23rd C
scratch produce a
useable and
optimal UI

17 Front-end Created a project


functionality: object and its
parameters and
Project object 4 hours March 24th C
implement its
creation and manipulation and
storage storage

18 Front-end Connected the UI


completion: data entry and the
Connecting the UI project objects 2 hours March 24th C
and the project and their
implementation manipulation

19 Back-end
algorithm Theoretically
development: developed the
core algorithm
Produce the that will determine
algorithm that will 2 hours March 28th C
the number of
calculate the man hours Ms.
number of man Jaya has worked
hours from a on the project
given project

20 Back-end Implemented the


development: planned algorithm
Implementation in Python using 1 hour March 28th C
of planned the relevant
algorithm libraries

21 Back end
development:
Connected all
Connection of the parts of the
algorithm 1 hour March 28th C
backend together
implementation functionally
to the project
storage
22 Develop the
Back-end implementation to
development: produce and send
Implementation signed receipts to
3 hours March 29th C
of data the customer, and
visualization / the periodic data
receipt production visualization
method

23 Back-end Integrate all


completion: aspects of the
Integrate the completed
3 hours March 29th-30th C
separate parts of program and
the implemented ensure
program functionality

24 Commence and
record data for the
Testing 1 hour April 2nd C
testing from test
plan

25 Listing all the


dependencies and
Dependencies and their relevant uses
outlining most and determining 1 hour April 3rd C
relevant complex the most relevant
techniques complex
techniques applied

26 Describing the
complex
Description of the techniques and
complex applied and 2 hours April 3rd C
techniques providing
examples of its
application.

27 Evaluating and
Reading/Spell
correcting the 15 minutes April 3rd C
Checking
documentation

28 Recording a video
Showcasing the of the product
working and 30 minutes April 4th D
solution
passing the
success criteria, as
well as highlighting
extensibility

29 Gain her opinion


as to the
Interview 3 with
evaluation and 30 minutes April 16th E
Ms. Jaya
extensibility of the
product

30 Evaluation of the
passing of the
Address Success success criteria
Criteria Evaluation and the possible 30 Minutes April 16th E
and extensibility improvements/ext
ensions for the
product