Q. No Question Status
a. Binomial
b.
Poisson
c. Weibull
d. Exponential
Solution:-
b
Q.2 The queue of trucks at a crusher plant hopper is known to be M/M /1 queue. The
probability that there is no truck to unload is 0.3. Due to rains the mean service
time at the hopper is increased by 30%. As a consequence, the expected number
of trucks in the queuing system ( including the one possibly unloading) becomes
a.
10
b. 12
c. 14
d. 16
Solution:-
a
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 1/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Solution:-
d
a.
Total supply exceeds total demand
b. Total demand exceeds total supply
c.
Total demand is equal to total supply
d. Total supply is either equal or more than total demand
Solution:-
c
Solution:-
b
Q.6 In a PERT network, the activities on the critical path are a, b and c. The standard
deviations of the durations of these activities are 2, 2 and 1 respectively. The
variance of the project duration is
a. 3
b. 5
c.
9
d. 12
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 2/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Solution:-
c
Q.7 The moving average method is to be used for forecasting demand based on m
periods of data. Two values of m are tried, m1 and m2 with m1 > m2, to get two
a. Only P
b. Only Q
c.
Both P and Q
d. Neither P nor Q
Solution:-
c
Q.8 For a transportation problem that has a feasible solution, the North West corner
rule gives a possible solution which is
a.
A basic feasible solution to the problem
b. A near optional solution to the problem
c. The optional solution to the problem
d. One of the many optimal solutions to the problem
Solution:-
a
a.
b.
c.
d.
n!
Solution:-
d
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 3/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Q.10 IN inventory cost structure, set up cost is a part of replenishment cost when it
a.
Has taken place externally
b. is dependent on supply conditions
c. is independent of supply conditions
d.
Has taken place internally
Solution:-
d
a. 60
b. 54
c. 51
d.
49
Solution:-
d
a.
b.
c.
d.
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 4/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Solution:-
c
a.
P-3 Q-4 R-2 S-1
b. P-2 Q-3 R-4 S-1
c. P-3 Q-4 R-1 S-2
d. P-2 Q-4 R-3 S-1
Solution:-
a
Q.14 The feasible region of an LP problem is shown in fig,the maximum value of the
objective function is
a.
20400
b. 20000
c. 19200
d. 16800
Solution:-
a
Q.15
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 5/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
a. 10
b. 20
c. 30
d.
0
Solution:-
d
Solution:-
d
Q.17 A workshop has 4 lathe machines and 4 tasks for completion. Each of the
machines can perform each of the 4 tasks. Each task can be assigned to one and
only one machine. Estimated cost in rupees to complete each task is given in the
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 6/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
matrix below. The total optimum cost in rupees for assigning the tasks to the
machines is
a. 210
b. 215
c.
220
d. 286
Solution:-
c
Q.18 Students arrive at KAME office to receive GATE material. The inter – arrival time
of students at the service counter is Poisson distributed with an average time of
10 mm. The service time at the counter is distributed exponentially with a mean
time of 6 min. Average time spent by a student waiting for his turn to be served
in minutes is
a.
9
b. 12
c. 15
d. 18
Solution:-
a
Q.19 The unit cost matrix of a balanced transportation problem is shown below
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 7/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
the initial basic feasible solution by the North – West corner rule is
a. 1025
b. 1075
c.
1130
d. 1226
Solution:-
c
a. 3
b.
4
c. 5
d. 6
Solution:-
b
days, are indicated. Crashing of any activity costs Rs.1000 per day. If the project
is crashed to the shortest possible duration of 3 days, the total crashing cost in
rupees is ( in the figure, the arrow of 4 to 2 is wrong, it is from 2 to 4 but not from
4 to 2)
a. 25000
b. 34000
c. 13000
d.
19000
Solution:-
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 8/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Q.22 A project is composed of five activities whose three time estimates in months
are given below
a. 2
b.
3
c. 6
d. 9
Solution:-
b
a. (1.5, 0)
b. (1.25, 1.5)
c. (0.5, 1.0)
d.
(2.25, 1.5)
Solution:-
d
Q.24 The assignment problem given requires four different jobs to be done on four
of assignment is ____________
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 9/10
1/27/2018 GATE-2018 | Mechanical Engineering Online Test Series
Solution:-
116
Q.25 For the critical path network shown, the slack for the activity ‘b’ in months is
a. 4
b.
6
c. 9
d. 13
Solution:-
b
http://kulkarniacademy.thinkexam.com/index.php?pageName=timeManagementReport&testid=33&t=cont-4&testType=2 10/10