CONSULTING SERVICES
Shopping Document
PROCUREMENT FOR
GOVERNMENT OF TELANGANA
IRRIGATION & CAD DEPARTMENT
Superintending Engineer
0
GOVERNMENT OF TELANGANA
IRRIGATION & CAD DEPARTMENT
NATIONAL HYDROLOGY PROJECT
WORLD BANK FUNDED
INVITATION FOR QUOTATIONS (IFQ)
-
Name of Non-Consulting Services Digitization of maps of existing Master plan records
of Krishna & Godavari basins with in Telangana
State.
Date:11/03/2024
Bid No.: NHP/TSSW/NCS/Shopping/1
1. The Government of India has received financing from the World Bank towards the cost
of National Hydrology Project and intends to apply part of the proceeds toward
payments under the contract for which this Invitation for Bids is issued. Bidding will be
conducted through National Competitive Bidding procedures agreed with the World
Bank. Bidding is open to all eligible bidders as defined in the World Bank’s Guidelines:
Procurement of Goods, Works and Non-consulting Services under IBRD Loans and
IDA Credits & Grants by World Bank Borrowers, January 2011, revised July 2014
setting forth the World Bank’s policy on conflict of interest. Bidders are advised to
note the minimum qualification criteria specified in the Bidding Documents in
order to qualify for the award of the Contract.
1
3. Bids must be accompanied by Bid Security for the amount and in the form specified in
the Bidding Document. Bid security shall have to be valid for 45 days beyond the
validity of the bid. Bids should be valid for 60 days after the deadline specified for
submission.The bidders are required to submit original bid security in approved form
furnished with bid document to the Superintending Engineer, Hydrology, O/o the
Engineer-in-Chief (General), I & CAD Department, 2nd floor Jalasoudha, Errum
Manzil, Hyderabad, Telangana-500082 before the opening of the technical part of
the Bid given above, either by registered post/ speed post/ courier or by hand, failing
which the bids will be declared non-responsive and will not be opened.
4. The bid document is available online and quotations are to be submitted online, in two
parts, through e-tendering portal https://eprocurement.telangana.gov.in/ Digital
Signature is mandatory to participate in the e-tendering. Bidders already possessing the
digital signature (signing and encryption) issued from the authorized CAs can use the
same in this tender.
5. If the office happens to be closed on the date of opening of the bids as specified, the
bids will be opened on the next working day at the same time and venue. The procedure
followed for opening of bid is specified in Clause 7.1 of I T B.
Sd/- 05/03/2024
Superintending Engineer, Hydrology
Nodal Officer (NHP -TSSW)
I & CAD Department, Telangana,
O/o.Engineer-in-Chief(G),
Jalasoudha Building, Errumanzil,
Hyderabad - 500082
Telangana (India)
Telephones: 7673902441
e-Mail: [email protected]
2
NATIONAL HYDROLOGY PROJECT
WORLD BANK FUNDED
Invitation for Bids for Non-Consulting services
Contact person for obtaining the maps of Masterplan Records & other data
Qty of
masterplans Location/
Name of consignee Address of office
& Rainfall Contact No.
Data
Deputy Executive As per ToR Division – II, Hydrology Unit, O/o. Engineer- Hyderabad
Engineer, Division -II, in-Chief(G), I & CAD Department, Jalasoudha Mob No.-
(Section 3)
Hydrology Unit, O/o. Building, Errummanzil, Hyderabad-82 9989334869
Engineer-in-Chief(General)
Sd/- 05/03/2024
Superintending Engineer, Hydrology
Nodal Officer (NHP -TSSW)
I & CAD Department, Telangana,
O/o.Engineer-in-Chief(G),
Jalasoudha Building, Errumanzil,
Hyderabad - 500082
Telangana (India)
Telephones: 7673902441
e-Mail: [email protected]
3
TABLE OF CONTENTS
4
PART 1 – BIDDING PROCEDURES
5
Section 1 - Instructions to Bidders (ITB)
A. General
1. Scope of Works Scanning, Digitization, Georeferencing & creating spatial data for
maps of existing Master plan records of Krishna & Godavari basins
& sub-basins with in Telangana State & digitization of Rainfall data
The Superintending Engineer, Hydrology & Nodal Officer(NHP-
TSSW), O/oEngineer-in-Chief(G), I & CAD Department, Govt.of
Telangana invites online quotations in electronic tendering system for
the non-consulting services as given in Terms of Reference attached.
2. Qualification of
The bidder shall provide qualification information which shall
the Bidder
include:-
(a) Income tax clearance certificate from the concerned IT circle
(b) Report on his financial standing; and
(c) Details of any litigation, current or during the last 3 years in which
the bidder is involved, the parties’ concerned and disputed amount in
each case.
6
or
b. Two similar completed works each costing not less than the amount
equal to INR 15,00,000.
or
c. One similar completed work costing not less than the amount equal to
INR 24,00,000.
Completed work mean- Completed work means the executed/completed
portion of Work Order / AMC / RC, even if the work has not been
completed in totality (but must not be less than a or b or c as the case may
be).
Similar Work Means- Scanning, Georeferencing, Digitization, &
creating shape files etc.
(C) Essential Documents:
The bidders shall have to submit the following documents in order to meet
the Qualifying
Requirements:
1. Copies of Audited Annual Accounts reports certified by Chartered
Accountant in support of Financial Capability.
2. Copy(s) of Credential Certificate(s) in support of Technical Capability.
3. Copy of Service Tax Registration Certificate.
4. Copy of PAN Card.
5. Copy of Partnership deed/ Affidavit of Proprietorship/ Article of
Association including any change in the constitution business duly
attested by a Notary Public.
a. The contract shall be for the whole works as described in the TOR.
4. Bid Price
Corrections, if any, shall be made by crossing out, initialing, dating
and rewriting.
b. All duties, taxes and other levies payable by the bidder under the
contract shall be included in the total price.
c. The rates quoted by the bidder shall be fixed for the duration of the
contract and shall not be subject to adjustment on any account.
d. The rates should be quoted in Indian Rupees only.
5. Submission of 5.1 The bidder is advised to visit the site of works at his own expense
Quotations and obtain all information that may be necessary for preparing the
quotation.
7
5.2 Each bidder shall submit only one quotation.
5.3 The Bidder shall furnish, as part of his Bid, a Bid security in the
amount as specified in IFB for this particular work in the form of
a Bank guarantee. The bidders are required to submit original bid
security in approved form furnished with bid document to the
Superintending Engineer, Hydrology, O/o the Engineer-in-
Chief (General), I & CAD Department, 2nd floor Jalasoudha,
Errum Manzil, Hyderabad, Telangana-500082 before opening
of the technical part of the Bid given above, either by registered
post/ speed post/ courier or by hand, failing which the bids will
be declared non-responsive and will not be opened.
5.3.1 Bank guarantees issued as surety for the quotation shall be valid
for 45 days beyond the validity of the bid.
5.3.2 Any quotation not accompanied by an acceptable Bid Security
shall be rejected by the Employer as non-responsive.
5.3.3 The Bid Security of unsuccessful bidders will be returned within
28 days of the end of the bid validity period.
5.3.4 The Bid Security of the successful bidder will be discharged
when the bidder has signed the Agreement and furnished the
required Performance Security. The Bid Security of the
successful Bidder shall be required to be kept valid and / or
validity extended till such time the Performance Security is
accepted by the Employer.
5.3.5 The Bid Security may be forfeited
(a) If the Bidder withdraws the Bid after Bid opening during the
period of Bid validity;
(b) In the case of a successful Bidder, if the Bidder fails within the
specified time limit to
(i) Sign the Agreement; or
(ii) Furnish the required Performance Security.
8
Name of Firm:
Address for communication:
Telephone No.(s): Office:
Mobile No.:
Facsimile (FAX) No.:
Electronic Mail Identification (E-mail ID):
9
quotations are invited. The prospective bidder can submit
quotations on line; however, the bidder is required to have
enrolment/registration in the website and should have valid
Digital Signature Certificate (DSC) in the form of smart card/e-
token. The DSC can be obtained from any authorized certifying
agencies. The bidder should register in the web site
https://eprocurement.telangana.gov.in/ in using the relevant
option available. Then the Digital Signature registration has to be
done with the e-token, after logging into the site. After this, the
bidder can login the site through the secured login by entering the
password of the e-token & the user id/password chosen during
registration. After getting the bid schedules, the Bidder should go
through them carefully and then submit the documents as asked,
otherwise, the quotation will be rejected.
b) The completed quotation comprising of documents indicated in
ITB clause 11, should be uploaded on the website given above
through e-tendering along with scanned copies of requisite
certificates as are mentioned in different sections in the bidding
document.
5.4.2 Offline submission of tender documents: Submission of
Original Documents: The bidders are required to submit
(i) Original Power of Attorney (ii) Original affidavit regarding
correctness of information furnished with bid document before
the date and time as indicated in clause ITB 5.5.2 at the address
indicated in clause 5.5.2 of ITB, either by registered post, courier
or by hand, failing which there bids will not be open online and
will be declared non responsive.
5.5.1 “The bidder shall submit online two separate files: Part I &
Part II:-
Part I, marked as Part I: Technical Qualification Part and
Part II; marked as Part II: Financial Qualification Part”.
10
The envelope should be marked (Bid name of work and Bid No.)
7.2 The file containing the Part I of the quotation will be opened
first.
9. Evaluation of 9.1 The Employer will evaluate and compare the quotations
Quotations determined to be substantially responsive i.e. which
9.1.1 During the evaluation of Technical Qualification–Part-1 of
Quotations, the Employer will determine whether each
Quotation (a) meets the eligibility criteria defined in Clauses 3
(b) has been digitally signed; (c) is accompanied by the cost of
bid documents; and (d) is substantially responsive to the
requirements of the bidding documents.
9.1.2 A substantially responsive Quotation is one which conforms to
all the terms, conditions, and specifications of the Bidding
documents, without material deviation or reservation. A
11
material deviation or reservation is one (a) which affects in any
substantial way the scope, quality, or performance of the Works;
(b) which limits in any substantial way, inconsistent with the
Bidding documents, the Employer's rights or the Bidder's
obligations under the Contract; or (c) whose rectification would
affect unfairly the competitive position of other Bidders
presenting substantially responsive Quotations.
9.1.3 If a Quotation is not substantially responsive, it will be rejected
by the Employer, and may not subsequently be made responsive
by correction or withdrawal of the non - conforming deviation
or reservation.
i) Evaluation of Part I of quotations furnished in Part I of the
quotation in pursuant to Clause 5.4 of ITB, shall be taken up and
completed, and a list will be drawn up of the qualified bidders
whose Part II of quotations will be eligible for opening.
ii) The result of evaluation of Part I of the Quotations shall be made
public on e-procurement portal
https://eprocurement.telangana.gov.in/
iii) The Employer shall inform, the bidders, who have qualified
during evaluation of Part I of quotations, of the date, time of
online opening of Part II of the quotation. In the event of the
specified date being declared a holiday for the Employer, the
quotations will be opened at the appointed time and location on
the next working day.
iv) Part II of quotations of only these bidders will be opened
online, who have qualified in Part I of the quotation.
v)The e-procurement system automatically calculates the total
amount from unit rates and quantities and the system also
automatically populates the amount in words from the amount
in figures and therefore there is no scope of discrepancy and
need for arithmetic correction.
10. Award of The Employer will award the contract to the bidder whose quotation
contract has been determined to be substantially responsive and who has offered
the lowest evaluated quotation price and who meets the specified
qualification criteria.
12
- a bank guarantee in the provided format.
- valid for the period of contract in favour of Superintending
Engineer, Hydrology, O/o Engineer-in-Chief(General), I & CAD
Department, Hyderabad
The Performance Security shall be valid until a date 28 days from
the date of completion of work or maintenance of the work,
specified in clause 12.
13. Fraud and The Bank requires compliance with its policy in regard to corrupt and
Corruption fraudulent practices as set forth in Section-5 of Part-4.
In further pursuance of this policy, Contractor shall permit and shall
cause its agents, Experts, Sub-consultants, sub-contractors, services
providers, or suppliers to permit the Bank to inspect all accounts,
records, and other documents relating to the submission of the Proposal
and contract performance (in case of an award), and to have them
audited by auditors appointed by the Bank.
Sd/- 05/03/2024
Superintending Engineer, Hydrology
Nodal Officer (NHP -TSSW)
I & CAD Department, Telangana,
O/o.Engineer-in-Chief(G),
Jalasoudha Building, Errumanzil,
Hyderabad - 500082
Telangana (India)
Telephones: 7673902441
e-Mail: [email protected]
13
Section – 2: BIDDING FORMS
14
QUALIFICATION INFORMATION
1 For Bidders
1.1 Name and Address of prime Bidder/Firm: ______________________________
1.2 Principal place of business: ______________________________
1.3 Power of attorney of signatory of Quotation.
[Attach copy]
1.4 Year of Incorporation:
1.5 Financial Turnover
(a) 2018-19: -------Million INR
(b) 2019-20: -------Million INR
(c) 2020-21: -------Million INR
(d) 2021-22: -------Million INR
(e) 2022-23: -------Million INR
1.6 Work performed/similar experiences as prime contractor over the last Five years.
Remark
Date
explaini
of
Value Stipulate ng
issue Actual
Proje Name of descripti of d period reasons
contra of date of
ct Employ on of contra of for delay
ct No. wor completi
Name ee work ct (Rs. completi and
k on
Lakhs) on work
orde
complete
r
d
15
1.4 Proposed subcontracts and firms involved.
1.5 Evidence of access to financial resources to meet the requirements of working capital: cash in
hand, lines of credit, etc. List them below and attach copies of support documents.
1.6 Name, address, and telephone, telex, and fax numbers of the Bidders’ bankers who may provide
references if contacted by the Employer.
16
LETTER OF ACCEPTANCE CUM NOTICE
TO PROCEED WITH THE NON-CONSULTING SERVICE
DATED: ____________________________
Dear Sirs,
This is to notify you that your Quotation dated ___________________ for Digitization of maps of
existing Master plan records of Krishna & Godavari basins with in Telangana State for the contract
price of Rupees _________________________________________ [amount in words and
figures], is hereby accepted by us.
You are hereby requested to furnish performance security for an amount of Rs. ____________________
(equivalent to 5% of the contract price) within 15 days of the receipt of the letter. The Performance Security
in the form of Bank guarantee or a Bank draft shall be valid till the expiry of the period of contract i.e. upto
___________________.
Failure to furnish the Performance Security will entail cancellation of the award of contract.
You are also requested to sign the agreement form and proceed with the work not later than
____________________________ under the instructions of the Engineer,
___________________________ and ensure its completion within the contract period.
With the issuance of this acceptance letter and your furnishing the Performance Security, contract for the
above said work stands concluded.
Yours faithfully,
(Authorized Signature)
17
QUOTATION
To:
Superintending Engineer, Hydrology, Nodal Officer (NHP-TSSW)
O/o.Engineer-in-Chief(G), I & CAD Dept.,
Jalasoudha, Errummanzil, Hyderabad-82
Subject: Digitization of maps of existing Master plan records of Krishna & Godavari basins with in
Telangana State under National Hydrology Project
Sir,
We offer to execute the non-consulting services as described in your Invitation for Quotation
referred to above in accordance with the Conditions of Contract enclosed there with for a total
Contract Price of -
Rs.** _________________________________________________ [ in figures ]
Rs. _____________________________________ ____________ [ in words ].
This quotation and your written acceptance of it shall constitute a binding contract between us.
We understand that you are not bound to accept the lowest or any quotation you receive.
We hereby confirm that this quotation is valid for 45 days as required in Clause 6 of the
Instructions to Bidders.
Yours faithfully,
Authorized Signature : Date: ______________
** To be filled in by the Bidder, together with his particulars and date of submission at the
bottom of this Form.
18
Priced Bill of Quantities: Digitization of maps of existing Master plan records of Krishna
& Godavari basins with in Telangana State under National Hydrology Project.
Date: _________________________
IFB No: _____________________
Alternative No: ________________
Page N ______ of ______
1 2 3 4 5
Service Description of Services Unit Unit price Total
N exclusive Price incl
of GST/ all GST/other
other taxes etc
taxes/levie
s etc
[insert [insert name of Services] [insert [insert
number of lumpsum lumpsum
the price excl price incl
Service ] GST} GST]
1 Digitization of maps of existing Master plan Lumpsum
records of Krishna & Godavari basins & sub-
basins with in Telangana State as per ToR
(Number & size of maps as enclosed in ToR)
Total Bid Price exclusive of GST/ all other taxes/levies etc
Total GST@………..% on above
Total Bid Price inclusive of GST…%/ all other taxes….% etc
We agree to supply the above services in accordance with the technical specifications for a total
contract price of Rs. ................. (amount in figures ) (Rs. ................. amount in words) within the
period specified in the Invitation for Quotations.
We hereby certify that we have taken steps to ensure that no person acting for us or on our behalf
will engage in bribery or collusive agreements with competitors.
Signature of Contractor
19
PART 2 – SUPPLY REQUIREMENT
20
Activity Schedule/ Terms of
Reference (ToR) for
Activity: CODE –A.1.10.02: Updating the Existing Master plan records for Sub basins of
Krishna & Godavari Basins with in Telangana State ( NHP-2021-2022-TSSW-442203)
With Sub Activity
Digitization of maps of Existing Master plan records for Sub basins of Krishna &
Godavari Basins with in Telangana State
1. BACKGROUND :
In Telangana State, there are two major river basins- Godavari and Krishna. In
Godavari Basin, there are seven sub basins lying in Telangana State either fully or partly. In
Krishna Basin, there are six sub-basins lying either fully or partly and a sub group in the
Tummileru basin. The Masterplan records of Godavari and Krishna basin available hither to
have been prepared considering the rainfall records up to 1966 and some of them are updated
up to 1997. The State of Telangana was formed on June 2nd, 2014, with 10 districts.
Subsequently on developmental note 21 new districts were formed in 2016 and two more
districts were formed in 2019, totaling to 33 districts. In the last five years Government has
given priority for irrigation projects and many new irrigation schemes have been taken up in
various districts of Telangana.
Due to change in climatic conditions and other environmental changes, there is
a change in rainfall during the past two decades and number of Rain Guage Stations are
increased. It is also observed that more Ayacut is being irrigated than the contemplated
ayacut, thus there is change in utilization when compared with proposed schemes. Thus,
there arises a need to update the Master Plan records of Godavari and Krishna Basins. The
department is planning to expedite the digitalization of the existing Masterplans in-hard
copies within the State of Telangana, Scan the existing Maps, Digitize / Vectorize and Geo-
reference the vector data.
The intended project will also assist the Department to reduce the loss / wear
and tear of existing masterplan records, update the masterplan records, maintain River
Basins, Sub-Basins, and Sub-Groups.
21
2. OBJECTIVES :
The main objectives of the assignment are:
(a) To Scan and digitize the 100+ (more than 100) existing maps of Master plan Records
of different sizes & scales of Godavari & Krishna water basins in Telangana.
(b) To Geo-referencing of the digitized maps
(c) To Prepare all vector maps of existing subgroups & group boundaries of sub basins of
River basins within Telangana State.
(d) To Reorganize & Prepare all vector maps of existing subgroups & group boundaries of
sub basins of River basins by Territorial Chief Engineers (I) / Engineer-in-Chiefs (I) wise
based on the State re-organization.
(e) To Reorganize and prepare vectors maps of existing sub-groups and Group boundaries
of all sub basins district wise.
(f) To create Basin-wise, District-wise, Territorial Chief Engineers (I) / Engineer-in-Chiefs
(I), Sub-basin wise and sub-group wise maps in 1:50,000 and 1:2,50,000.
(g) To digitize the past 40-year rainfall data of each Rain gauge Station.
(h) Photoshop editing of digitized old maps.
22
referenced & vectorised to scale of 1:50,000 are around 300 numbers(Indicative
only). The Consultant must bring them to WGS84 UTM Projected coordinate system.
iii. Map composition of Godavari and Krishna River basins by Sub basin wise, District
wise, Territorial CE/ENC wise with all group, sub group layers etc,.
iv. The details of Sub Basin wise subgroups are detailed below(indicative only)
Godavari Basin lying in Telangana State
• G4 (Manjira sub basin) – 91 sub-groups.
• G5 (Middle Godavari) – 198 sub-groups.
• G6 (Maner Sub basin)- 164 sub-groups.
• G7 (Penganga sub basin) – 09 sub-groups.
• G8 (Wardha sub basin) – 05 sub-groups.
• G9 (Pranahita sub basin) – 67 sub-groups.
• G10 (Lower Godavari basin) – 97 sub-groups.
Krishna Basin lying in Telangana State
• K6 (Lower Bhima sub basin) – 29 sub-groups.
• K7 (Lower Krishna sub basin) – 113 sub-groups.
• K8 (Tungabhadra Sub basin) – 07 sub-groups.
• K10 (Musi sub basin) – 83 sub-groups.
• K11 (Paleru sub basin) – 14 sub-groups.
• K12 (Munneru sub basin) – 60 sub-groups.
• Tammileru basin – 1 sub-groups.
23
• The following-accuracy levels will be maintained:
(i) Digitizing (location accuracy) 0.5 centimeter
➢ Digitize the vector data available on the map sheets which includes the basin, sub-
basin, and sub-group boundaries.
➢ Clean and merge all the digitized sheets to create a seamless single map of entire
surface water network of two basins – viz., Godavari and Krishna of Telangana
State.
➢ Geo-reference the data to WGS 84 UTM Projected coordinate system.
➢ Compile Maps district wise, sub basin wise and territorial Chief Engineers wise in
1:50,000 and 1:250000 scales. The compiled maps shall also consist of Roads,
lakes, railway lines and township boundaries, and existing, under execution &
contemplated Irrigation projects.
24
➢ Introduce geo-location of existing Rain Gauge Stations provide by department on
the maps and symbol them as per the standards.
3.2.2 GEO-REFERENCING
The GIS Data must be geo-referenced in respect of WGS 84 UTM coordinate system.
3.3 DELIVERABLES
FOLLOWING DELIVERABLES ARE ENVISAGED UNDER THE ASSIGNMENT.
b. Soft Copy of the digitized maps in AutoCAD Drawing and ESRI Shape file
formats & PDF formats.
c. The soft copies shall be delivered in hard disks separately for Godavari &
Krishna Basins.
1. Telangana State map showing district boundaries, basin, sub basin boundaries to
scale of 1: 2,50,000 – A1 Size.
2. Sub basin map/District map/Territorial Chief Engineer Map with sub basin
Boundaries & group/sub group showing District Boundary, Mandal Boundary,
Mandal headquarters, Roads & Railway Lines, Rain gauge Stations, Tanks &
Lakes, Streams & Rivers– A1 Size.
3. Reference Survey of India sheets on Outer boundaries of Sub basin map/District
map/Territorial Chief Engineer Map.
Scale 1:50000 maps :
4. Soft copy of sub basin wise composed maps (G4 to G10, K6 to K8, K10-12 and
1 Tammileru basin sub group) with group & sub group layers showing District
Boundary, Mandal Boundary, Mandal headquarters, Roads & Railway Lines, Rain
gauge Stations, Tanks & Lakes, Streams -14 No’s
5. Soft copy of District wise composed maps showing sub basin layers with groups
and sub groups, Mandal Boundary, Mandal headquarters, Roads & Railway Lines,
Rain gauge Stations, Tanks & Lakes, Streams & Rivers - 33 No’s
6. Soft copy of CE / ENC Jurisdiction wise composed maps showing sub basin
layers with groups and sub group Boundary, Mandal Boundary, Mandal
25
headquarters, Roads & Railway Lines, Rain gauge Stations, Tanks & Lakes,
Streams & Rivers-19 No’s.
Scale 1:250000 maps :
7. Soft copy of Telangana State composed by District wise showing sub basin
layers Boundary, Mandal Boundary, Mandal headquarters, Roads & Railway
Lines, Rain gauge Stations, Tanks & Lakes, Streams & Rivers- 1 No.
8. Soft copy of Telangana State by Sub basin wise layers showing, Mandal
Boundary, Mandal headquarters, Roads & Railway Lines, Rain gauge Stations,
Tanks & Lakes, Streams & Rivers-1 No.
9. Soft copy of Telangana State composed by CE/ENC Jurisdiction wise layers
showing sub basin layers Boundary, Mandal Boundary, Mandal headquarters,
Roads & Railway Lines, Rain gauge Stations, Tanks & Lakes, Streams & Rivers-
1 No.
26
emerging countries. Must have managed projects related with GIS.
- CAD/GIS Expert (2 No’s) : The expert must have a degree in any Engineering, or any
related field, and minimum 5 years of working experience in GIS Digitization using
CAD Software.
- GIS Specialist – 2 No’s : The expert must have a degree in any Engineering, or any
related field, and minimum 5 years of working experience in GIS related, preferably
similar projects.
4. REPORTING REQUIREMENTS:
• Inception Report
Time
Sl. No Mile Stone Deliverables
Frame
27
ANNEXURE
ABSTRACT OF MAPS FOR SCANNING, GEOREFERENCING &
DIGITIZATION
1 G4 800 x 600
2 G4 1050 x 770
3 G4 660 x 740
4 G4 1050 x 820
5 G5 600 x 1000
6 G5 710 x 1000
7 G5 750 x 1010
8 G5 1000 x 760
9 G5 750 x 440
10 G5 1150 x 720
11 G5 510 x 100
12 G5 1120 x 850
13 G6 1020 x 1600
14 G6 500 x 2050
15 G6 1000 x 700
16 G6 720 x 710
17 G6 1050 x 660
18 G6 1070 x 3100
19 G6 660 x 2100
20 G7 1010 x 1520
21 G8 1010 x 1520
22 G9 660 x 1040
23 G9 610 x 1450
24 G9 610 x 1430
25 G9 610 x 1630
26 G9 610 x 1800
27 G9 910 x 600
28 G10 1020 x 1500
29 G10 950 x 650
30 G10 970 x 650
31 G10 950 x 650
32 G10 950 x 600
33 G10 970 x 600
34 G10 1000 x 660
35 G10 950 x 660
36 G10 1450 x 1680
28
37 G10 1250 x 1630
38 K6 700 x 600
39 K6 700 x 710
40 K7 660 x 480
41 K7 500 x 660
42 K7 500 x 460
43 K7 500 x 660
44 K7 500 x 660
45 K7 870 x 500
46 K7 940 x 610
47 K7 660 x 970
48 K7 710 x 760
49 K7 500 x 620
50 K7 910 x 620
51 K7 600 x 920
52 K7 470 x 1010
53 K7 610 x 920
54 K7 740 x 870
55 K7 760 x 1300
56 K7 870 x 1170
57 K7 480 x 930
58 K7 500 x 660
59 K7 800 x 880
60 K7 890 x 650
61 K7 870 x 650
62 K7 940 x 730
63 K7 970 x 660
64 K7 980 x 660
65 K7 1010 x 490
66 K7 710 x 470
67 K7 810 x 460
68 K7 1020 x 540
69 K7 790 x 510
70 K7 690 x 480
71 K7 660 x 510
72 K7 840 x 510
73 K7 100 x 740
74 K7 940 x 640
75 K7 760 x 1270
76 K7 690 x 510
77 K7 620 x 510
78 K8 510 x 440
79 K10 690 x 840
80 K10 790 x 940
29
81 K10 750 x 970
82 K10 880 x 840
83 K10 710 x 430
84 K10 660 x 450
85 K11 770 x 1000
86 K11 370 x 400
87 K11 590 x 530
88 K11 590 x 530
89 K11 610 x 550
90 K11 810 x 1000
91 K12 850 x 1500
92 K12 920 x 1500
30
Services and Facilities Provided by the Employer
a. The Agency shall conduct and complete the assigned services as per the
requirements of the terms of reference.
b. The Agency shall deploy necessary resources to complete the assigned services as
per the requirements of the terms of reference.
c. During performance of their duties, the Agency will work in a co-ordinated way
with all other officers of Government of Telangana.
31
PART 3 – CONTRACT & CONTRACT FORMS
32
Draft Agreement form for
Non-Consulting Services through Shopping
ARTICLES OF AGREEMENT
This deed of agreement is made in the form of agreement on ________ day_______________ month
____________ 20 ___, between the _____________________________ (Employer) or his authorized
representative (hereinafter referred to as the first party) and _____________________ (Name of the
Contractor), S/O _______________ resident of ______________ (hereinafter referred to as the second
party), to execute the work of construction of __________________________ (hereinafter referred to
as works) on the following terms and conditions.
The total cost of the works (hereinafter referred to as the “total cost”) is Rs. ____ as reflected in Annexure
- 1.
Payments to the second party for the work will be released by the first party in the following manner:-
“Payments will be released as per work done in accordance with Priced Bill of Quantities attached
to this contract.”
(b) on certification of the invoice by the engineer nominated by the first party with respect to quality of
services as per terms of Reference.
The second party, on the works reaching each stage of work, issue a notice to the first party or the Engineer
nominated by the first party (who is responsible for supervising the contractor, administering the contract,
certifying the payments due to the contractor, issuing and valuing variations to the contract, awarding
extensions of time etc.), to visit the site for certification of stage completion. Within 15 days of the receipt
of such notice, the first party or the engineer nominated by it, will ensure issue of stage completion
certificate after due verification.
5. Completion time
The works should be completed in 4 months from the date of issue of work order. In exceptional
circumstances, the time period stated in this clause may be extended in writing by mutual consent of both
the parties.
6. If any of the compensation events mentioned below would prevent the work being completed by the
intended completion date, the first party will decide on the intended completion date being extended by a
suitable period:
a. The first party does not give access to the site or a part thereof by the agreed period.
33
b. The first party orders a delay or does not issue completed drawings, specifications or instructions for
execution of the work on time.
c. Ground conditions are substantially more adverse than could reasonably have been assumed before issue
of letter of acceptance and from information provided to second party or from visual inspection of the site.
d. Payments due to the second party are delayed without reason.
e. Certification for stage completion of the work is delayed unreasonably.
7. Any willful delay on the part of the second party in completing the agreement work within the stipulated
period will render him liable to pay liquidated damages. @ Rs. 0.05% per day which will be deducted from
payments due to him. The first party may cancel the contract and take recourse to such other action as
deemed appropriate once the total amount of liquidated damages exceeds 2 % of the contract amount.
8. All necessary input data (maps/documents) will be handed over to the second party within 10 days of
signing of the agreement.
10. Securities
The Performance Security shall be provided to the Employer no later than the date specified in the Letter
of Acceptance and shall be issued in an amount and form and by a bank or surety acceptable to the
Employer. The Performance Security shall be valid until a date 28 days from the date of issue of the
Certificate of Completion in the case of a Bank Guarantee.
11. Termination
11.1 The Employer may terminate the Contract if the other party causes a fundamental breach of the
Contract.
11.2 Fundamental breaches of Contract include, but shall not be limited to the following:
a. the contractor stops work for 28 days and the stoppage has not been authorized by the Engineer;
b. the Contractor has become bankrupt or goes into liquidation
11.3 Notwithstanding the above, the Employer may terminate the Contract for convenience.
12.1 If the Contract is terminated because of a fundamental breach of Contract by the Contractor, the
Engineer shall issue a certificate for the value of the work done less advance payments received up to the
date of the issue of the certificate, less other recoveries due in terms of the contract, less taxes due to be
deducted at source as per applicable law.
12.2 If the Contract is terminated at the Employer’s convenience, the Engineer shall issue a certificate for
the value of the work done, the reasonable cost of removal of Equipment, repatriation of the Contractor’s
34
personnel employed solely on the Works, and the Contractor’s costs of protecting and securing the Works
and less advance payments received up to the date of the certificate, less other recoveries due in terms of
the contract and less taxes due to be deducted at source as per applicable law.
In the event of agreement not being reached, the matter will be referred for arbitration by a Sole Arbitrator
not below the level of retired Chief Engineer(C), The Arbitration will be conducted in accordance with the
Arbitration and Conciliation Act, 1996. The decision of the Arbitrator shall be final and binding on both
the parties.
It is the Bank’s policy to require that Borrowers (including beneficiaries of Bank loans), contractors, and
their agents (whether declared or not), sub-contractors, sub-consultants, service providers, or suppliers, and
any personnel thereof, observe the highest standard of ethics during the selection and execution of Bank-
financed contracts [footnote: In this context, any action taken by a consultant or any of its personnel, or its
agents, or its sub-consultants, sub-contractors, services providers, suppliers, and/or their employees, to
influence the selection process or contract execution for undue advantage is improper.]. The Contract would
be subject to Fraud and Corruption as attached in Section-5 (Part 4).
The Contractor shall keep, and shall make all reasonable efforts to cause its Sub-contractors to keep,
accurate and systematic accounts and records in respect of the Works in such form and detail as will clearly
identify relevant time changes and costs.
The Contractor shall permit and shall cause its Sub-contractors to permit, the Bank and/or persons appointed
by the Bank to inspect the Site and/or all accounts and records relating to the performance of the Contract
and the submission of the Bid, and to have such accounts and records audited by auditors appointed by the
Bank if requested by the Bank. The Contractor’s attention is drawn to Clause 13 which provides, inter alia,
that acts intended to materially impede the exercise of the Bank’s inspection and audit rights provided for
under this Clause 14 constitute a prohibited practice subject to contract termination (as well as to a
determination of ineligibility under the Bank’s prevailing sanctions procedures.)
35
PERFORMANCE BANK GUARANTEE
AND WHEREAS it has been stipulated by you in the said Contract that the Contractor shall
furnish you with a Bank Guarantee by a recognized bank for the sum specified therein as security
for compliance with his obligations in accordance with the Contract;
AND WHEREAS we have agreed to give the Contractor such a Bank Guarantee;
NOW THEREFORE we hereby affirm that we are the Guarantor and responsible to you, on
behalf of the Contractor, up to a total of ____________________ [amount of guarantee]
1___________________________ [in words], such sum being payable in the types and
proportions of currencies in which the Contract Price is payable, and we undertake to pay you,
upon your first written demand and without cavil or argument, any sum or sums within the limits
of ____________________ [amount of guarantee]1 as aforesaid without your needing to prove or
to show grounds or reasons for your demand for the sum specified therein.
We hereby waive the necessity of your demanding the said debt from the Contractor before
presenting us with the demand.
We further agree that no change or addition to or other modification of the terms of the Contract
or of the Works to be performed thereunder or of any of the Contract documents which may be
made between you and the Contractor shall in any way release us from any liability under this
guarantee, and we hereby waive notice of any such change, addition or modification.
This guarantee shall be valid until 28 days from the date of completion of work.
1 An amount shall be inserted by the Guarantor, representing the percentage of the Contract Price
specified in the Contract including additional security for unbalanced Bids, if any and denominated
in Indian Rupees.
36
PART 4 – Bank Policy - Corrupt and Fraudulent Practices
37
Bank’s Policy – Corrupt and Fraudulent Practices
Guidelines for Selection and Employment of Consultants under IBRD Loans and IDA Credits &
Grants by World Bank Borrowers, dated January 2011.
1.23 It is the Bank’s policy to require that Borrowers (including beneficiaries of Bank loans),
consultants, and their agents (whether declared or not), sub-contractors, sub-consultants, service
providers, or suppliers, and any personnel thereof, observe the highest standard of ethics during
the selection and execution of Bank-financed contracts [footnote: In this context, any action taken
by a consultant or any of its personnel, or its agents, or its sub-consultants, sub-contractors,
services providers, suppliers, and/or their employees, to influence the selection process or contract
execution for undue advantage is improper]. In pursuance of this policy, the Bank.
(a) defines, for the purposes of this provision, the terms set forth below as follows:
i. “corrupt practice” is the offering, giving, receiving, or soliciting, directly or indirectly, of
anything of value to influence improperly the actions of another party.
ii. “fraudulent practice” is any act or omission, including misrepresentation, that knowingly or
recklessly misleads, or attempts to mislead, a party to obtain financial or other benefit or to
avoid an obligation.
iii. “collusive practices” is an arrangement between two or more parties designed to achieve an
improper purpose, including to influence improperly the actions of another party.
iv. “coercive practices” is impairing or harming, or threatening to impair or harm, directly or
indirectly, any party or the property of the party to influence improperly the actions of a party.
v. “obstructive practice” is
(aa) deliberately destroying, falsifying, altering, or concealing of evidence material to the
investigation or making false statements to investigators in order to materially impede
For the purpose of this sub-paragraph, “another party” refers to a public official acting
in relation to the selection process or contract execution. In this context “public official”
includes World Bank staff and employees of other organizations taking or reviewing
selection decisions.
For the purpose of this sub-paragraph, “party” refers to a public official; the terms
“benefit” and “obligation” relate to the selection process or contract execution; and the
“act or omission” is intended to influence the selection process or contract execution.
For the purpose of this sub-paragraph, “parties” refers to participants in the procurement
or selection process (including public officials) attempting either themselves, or through
another person or entity not participating in the procurement or selection process, to
simulate competition or to establish prices at artificial, non-competitive levels, or are
privy to each other’s bid prices or other conditions.
38
For the purpose of this sub-paragraph, “party” refers to a participant in the selection
process or contract execution.
Bank investigation into allegations of a corrupt, fraudulent, coercive, or collusive
practice; and/or threatening, harassing, or intimidating any party to prevent it from
disclosing its knowledge of matters relevant to the investigation or from pursuing the
investigation, or
(bb) acts intended to materially impede the exercise of the Bank’s inspection and audit
rights;
(b) will reject a proposal for award if it determines that the consultant recommended for award or
any of its personnel, or its agents, or its sub-consultants, sub-contractors, services providers,
suppliers, and/or their employees, has, directly or indirectly, engaged in corrupt, fraudulent,
collusive, coercive, or obstructive practices in competing for the contract in question;
(c) will declare misprocurement and cancel the portion of the Loan allocated to a contract if it
determines at any time that representatives of the Borrower or of a recipient of any part of the
proceeds of the Loan were engaged in corrupt, fraudulent, collusive, coercive, or obstructive
practices during the selection process or the implementation of the contract in question, without
the Borrower having taken timely and appropriate action satisfactory to the Bank to address such
practices when they occur, including by failing to inform the Bank in a timely manner they knew
of the practices.
(d) will sanction a firm or an individual at any time, in accordance with prevailing Bank’s
sanctions procedures5, including by publicly declaring such firm or an ineligible, either
indefinitely or for a stated period of time: (i) to be awarded a Bank-financed contract, and (ii) to
be a nominated sub-consultant, supplier, or service provider of an otherwise eligible firm being
awarded a Bank-financed contract.
A nominated sub-consultant, supplier, or service provider is one which has been either (i) included
by the consultant in its proposal because it brings specific and critical experience and know-how
that are accounted for in the technical evaluation of the consultant’s proposal for the particular
services; or (ii) appointed by the Borrower.
39